Loading...
ST9301A-CS 960712 PUBLIC WORKS Mr. Ken Griffin, P.E. City Engineer City of Coppell P.O. Box 478 255 Parkway Coppell, Texas 75019 Re: Sandy Lake Project 91-838 (Coppell E. City Limits to Dallas City Limit) Harrington and Farrow ROW Documents Dear Mr. Griffin: Reference is made to our telephone discussion of June 28, 1996, concerning the acquisition schedule for the Harrington and Farrow properties. When I inquired as to the schedule for acquisition or schedule for any E.D. hearing you indicated that you had not yet received a report from your appraiser. When I asked you about the possibility of getting a right of entry you indicated that you wanted to obtain the appraisals first. The purpose of this letter is to ask you to determine the status and/or schedule for acquisition of these parcels and report to this office in writing. If you do not anticipate having both parcels closed by August 20, 1996, please consider obtaining a right of entry for the properties as soon as possible. As you know, we desire to start construction very soon and your efforts in clearing these right of way parcels promptly will be greatly appreciated. As always you may call me at 653-6423 if you have questions concerning the above or any other feature of the bridge project. Sincerely, Irvin $. Griffin Project Engi~ :SG/isg ~Vi GrWfm9.Ken ' 411Elm Street Dallas, Texas75202 653-7151