Loading...
ST8201-AG 900213Rev'. ~-24-89 AGENDA REQUEST FORM CITY COUNCIL [~%*WTING February 13. 1990 iTEM CAPTION: Consideration of street assessment ordinance for improving a portion of Denton Tap Road from Beltline Road to Sandy Lake Road, determinin~ and fixing the portion of the project costs to be assmessd against almtting SUBMIT~ '_BYOpe'r'ty and callin~ a public hearing thereon. · ~~ _ STAFF R, EP.: Prank Tran,4o, _l~Duty C.M./ '" (Director's Signature) Flnallce Dir. OTRER REP. ~ ~VALUATION OF ITEM: DATEr AMT. ESTIMATED: ~ AMT. +/-; FINANCIAL REVIEW BY: AN ORDINANCE OF TIlE CITY OF COPPELL, TEXAS ORDINANCE NO. AN ORDINANCE OF THE CITY OF COPPELL, TEXAS, SHOWING THE ESTIMATE OF TOTAL COSTS OF ALL IMPROVEMENTS BASED UPON ACTUAL BIDS RECEIVED AND ACCEPTED BY THE CITY, THE ESTIMATE OF SUCH COSTS TO BE PAID BY DALLAS COUNTY, THE ESTIMATE OF COSTS TO BE THE RESPONSIBILITY OF THE CITY OF COPPELL (HEREINAFTER CALLED THE "PROJECT COSTS"), THE ESTIMATE OF THE PROJECT COSTS PER FRONT FOOT PROPOSED TO BE ASSESSED AGAINST THE ABUTTING PROPERTY AND AGAINST RAILWAY PROPERTY AND THE REAL AND TRUE OWNERS THEREOF AND THE ESTIMATE OF VARIOUS OTHER COSTS, FOR IMPROVING OF A PORTION OF DENTON TAP ROAD FROM BELT LINE ROAD TO SANDY LAKE ROAD IN THE CITY OF COPPELL, TEXAS, AND OTHER MATTERS RELATED THERETO; DETERMINING AND FIXING THE PORTION OF THE PROJECT ' COSTS AND THE RATE THEREOF PROPOSED TO BE ASSESSED AGAINST AND PAID BY THE ABUTTING PROPERTY AND RAILWAY PROPERTY, AND THE REAL AND TRUE OWNERS THEREOF; DETERMINING THE NECESSITY OF LEVYING AN ASSESSMENT AGAINST SAID ABUTTING PROPERTY AND RAILROAD PROPERTY, AND THE REAL AND TRUE OWNERS THEREOF, FOR THE PART OF THE PROJECT COSTS APPORTIONED TO THEM; ORDERING AND SETTING A HEARING AT 7:00 O'CLOCK P.M. ON THE DAY OF , 1990, IN THE COUNCIL CHAMBER OF THE CITY COUNCIL IN THE CITY HALL OF COPPELL, TEXAS, AS THE TIME AND PLACE FOR THE HEARING OF THE REAL AND TRUE OWNERS OF SAID ABUTTING PROPERTY; DIRECTING THE CITY SECRETARY OF THE CITY OF COPPELL, TEXAS, TO GIVE NOTICE OF SAID HEARING AS REQUIRED BY THE LAWS OF THE STATE OF TEXAS; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City Council of the City of Coppell, Texas, heretofore determined the necessity for and ordered the improvement of Denton TaD Road from Belt Line Road to Sandy Lake Road; and WHEREAS, the City Council of the City of Coppell, Texas, heretofore caused to be prepared an estimate of the cost of such improvements'which said estimate was determined and based upon aetual bids received and accepted by the City; and WHEREAS, the City Council of the City of Coppell, Texas, deems it necessary to levy an assessment against the abutting property and railroad property, and the real and true owners thereof for a part of the project costs and set a public hearing thereon; NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF COPPELL, TEXAS: SECTION 1. The City Council of the City of Coppell, Texas, hereby finds and determines: A. That in the fall of 1985, the City Council authorized Ginn, Inc., to perform a study to determine the estimated cost of construction and partial reimbursement through street assessments for the improvement of Denton Tap Road from BeR Line Road to Sandy Lake Road. That the planned improvements to the roadway was to include a six-lane divided concrete roadway and bridges, with concrete curb and gutter, and storm sewer improvements. That thereafter the City Council ordered the improvements bid in accordance with the plans and specifications prepared by Ginn, Inc., the Engineer for the City (herein called "Engineer") and approved and adopted by the City Council. That based upon actual bids received by the City Council establishing such estimate of costs, the City Council determined the neeassity for the improvements, aeeepted the bid of the responsible bidder submitting the lowest and best bid, ordered the improvements, and contracted for construction of the same in the name of the City. B. That attached hereto as Exhibit "A", and made a part of this ordinance, is the report prepared and filed by the Enginee.r[for the City which shows such estimates of costs of such improvements based upon the final contract for bid for construction of said improvements, and the estimates of the amount per front foot to be assessed against the property abutting said street (abutting property and real and true owners thereof shall be construed to include railway property and railways which are within the proposed improvement), within the limits herein defined, and against the real and true owners thereof. SECTION 2. The written statement and report of the Engineer showing the estimated total costs of all the improvements based on bids received March 3, 1988, on the street within the limits above defined, showing the estimated costs to be paid by Dallas County, showing the estimated costs to be the responsibility of the City (hereinafter called "Project Costs"), showing the amounts per front foot proposed to be assessed against the abutting property and the real and true owners thereof on the said street for the Project Costs, showing the total estimated Project Costs of said improvements proposed to be assessed against and paid by the abutting property and the real and true owners thereof, and showing other matters relative thereto, having been received and examined by the City Council, said report and estimates therein shown are hereby in all things approved and adopted; and it is hereby found and determined by the City Council that the estimated amounts of the several respective items of costs of said improvements, as above described, on said street are as is set out in the schedule attached hereto and made a part of this ordinance. SECTION 3. A portion of the Costs of said improvements shall be paid and defrayed by County bond funds and the City of Coppell, Texas, and a portion of the Project Costs shall be assessed against and paid by the property abutting upon said street, within the limits above defined, and the real and true owners thereof, in accordance with, and in the manner provided by, Article 1105b of Vernon's Annotated Civil Statutes of Texas, as amended; The total Project Costs as hereinabove described, shall be and the same are hereby apportioned between said parties and shall be paid and defrayed as follows: A. The abutting property within the limits hereinapove defined, and the real and true owners thereof, shall be assessed for and pay in accordance with the "front foot plan," that portion of the estimated Project Costs as shown on the report of the Engineer which is attached hereto as Exhibit "A". Said amount being calculated to bo not more than all the costs of constructing, reconstructing, repairing and realigning curbs, gutters and sidewalks and nine-tenths of the remaining costs of such improvements as shown by such estimate. B. The City of Coppell shall pay all of the remainder of the Costs of said improvements after deducting the amounts herein specified to be paid by bond proceeds and the abutting property and the real and true owners thereof as set out in subparagraph A above. C. There is included within the meaning of the terms "cost" or "Project Costs," when such terms are used herein, all other costs and expenses incident to the construction of the improvements, including engineering and inspection expenses. When the improvements herein ordered have been completed ~nd accepted by the City of Coppell, the amount of the assessment against each property abutting thereon and the real and true owners thereof shall be ~nd become payable in eight (8) successive and equal semi-annual installments together with interest on each installment from said date of acceptance until paid at the rate of eight percent (8%) per annum; provided, however, that the owners of any of said property shall have the privilege of paying all or any of said installments at any time before maturity thereof, by paying the total amount of principal of such installment together with the interest accrued thereon to the date of payment. Further, if default be made in the payment of any of said installments of principal or interest promptly as the same matures, then at the option of the City or its assigns, the entire amount of the assessment upon which default is made, together with reasonable attorneys' fees and all collection costs incurred, shall be and become immediately due and payable. Provided, notwithstanding anything contained herein to the contrary, if any tract or parcel of property abutting such improvements (called "Tract"), or portion of the Tract, should after the date of acceptance, be sold or have filed and approved by the City Council a final plat, the entire assessment together with accrued interest thereon, against the Act shall become immediately due and payable. No assessment (except for assessments against railways and two (2) feet on either side thereof) shall be made against any abutting property, or the real and true owners thereof of costs in exeeas of the benefits to such property or owners thereof in enhanced value thereof by means of such improvements, as determined by the City Council at the hearing. The amounts of such assessments shall constitute a first and prior lien upon all such properties and a personal liability of the true and real owners thereof, whether correctly named or not. SECTION 4. A hearing shall be held and notice given to the owners as shown on the City's Tax Roll of property abutting upon Denton Tap Road within t~e limits set out above as to the assessment and as to the amount to be assessed against each parcel of abutting property, and the owners thereof, and as to the special benefits, if any, to said property to be received from said improvements and concerning any error, invalidity, irregularity or deficiency in any proceeding or contract with reference thereto or concerning any matter or thing connected therewith, which hearing shall be held by the City Council of Coppell, Texas, in the Council Chambers of the City Council in the City Hall in the City of Coppell, Texas, at 7:00 o'clock p.m. on the day of , 1990, at which time and place all persons, firms, corporations, or estates owning or claiming any such abutting property, or any interest therein, and their agents or attorneys, and persons interested in said proceedings, shall be given an opportunity to appear and to be heard in person, or by counsel, and may offer evidence; and said hearing may in the sole discretion of the City Council be adjourned from day to day and from time to time kept open, until all evidence and protests have been duly offered and heard, and the City Secretary of the City of Coppell, Texas, is hereby directed to give notice of said hearing by publication of notice in some newspaper of general circulation in the City of Coppell, Texas; said notice shah be published at least three (3) times in said newspaper before the date set for said hearing, the first of which pul)lieations shall be at least twenty-one (21) days prior to the date of said hearing, and such notice by publication shall be valid and sufficient, without any further form or character of notice, as provided for by and in accordance with the terms and provisions of Article l105b of the Revised Civil Statutes of Texas, as amended. Where required by said statute, the City Secretary shall give additional written notice. However, the City Secretary may, in addition to the eontents of the notiee of said hearing as required by law which shall be for all purposes valid and sufficient in itself, inelude in any one or all of the publications of said notice sueh further data and information regarding sueh proposed improvements and assessments as the City Secretary may deem proper, and such general statement in connection therewith as the city Seeretary may desire to acquaint those to whom the notice is directed with the facts and matters concerning said improvements and assessments. This hearinglmay be held jointly with any other assessment hearing that is called to be heard at the same time and place. Testimony and evidence applicable to both hearings, such as the qualifieations of witnesses who offer matters in connection with both hearings, may be considered a part of both hearings. SECTION 5. Following such hearing as herein provided, the assessment will be levied against said abutting property, and the real and true owners thereof, for that portion of the costs of said improvements hereinabove determined to be payable by said abutting property and the real and true owners thereof, which assessment shall be a first and prior lien upon the abutting property and a personal liability and charge against the real and true owners thereof. In levying the assessments, if the name of the owner be unknown, it shall be sufficient to so state that faet, and if said abutting property be owned by an estate or by a person, firm or corporation, it shall be sufficient to so state that fact, and it shall be unnecessary to give the correct name of any such owner, and no error or mistake in attempting to name the owner or in describing any of the property shall invalidate any assessment or certificate issued in evidence thereof; but, nevertheless, the real and true owners of said abutting property shall be liable, and the assessment against the abutting property shall be valid whether or not such owner may be named, or correctly named, or the property correctly deseribed therein. SECTION 6. This ordinance shall take effect immediately from and after its passage as the law in such eases provides. DULY P~ED by the City Council of the City of Coppell, Texas, this the day of , 1990. APPROVED: MAYOR ATTEST: CITY SECRETARY APPROVED AS TO FORM: - J CITY ATT~EY ' CO90-0203 ASSESSKEI~T CRLCULATION Total Estimated Construction Cost Less Non-Assessable items (Iow bid) $3,369,596.00 - 383,955.48 $2,985,640.52 Less Dallas County participation Net Assessable Construction Cost -1,676,568.48 $1,309,072.04 Plus 90% of Engineering, Testing, and Inspection Fees @ $359,123.86 Plus 90% of the cost of the Railroad crossing @ $206,000 Plus 90% of the Conoco pipeline lowering cost @ $40,000.00 Total Assessable Costs Total Assessable, Project Front Footage Assessment Per Front Foot $ 382,046.99 $ 185,400.00 $ 36,000.00 $1,912,519.03 14,853.93 $ 128.76 Please refer to the attached Engineer's Estimate for a more detailed breakdown of the project costs. The Engineer'S Estimate was produced from the Original Bid Tabulation Form and includes the bid prices and quantities for the project. Respectfully submitted, GINN,. ~NC. CONSULTING ENGINEERS H. Wayne Ginn, P.E. President I: 'I-IIRIT SOl JH~ld Off~ce $30.11 Ir COnCtlt! Drives (~ey~n~ LO.~.) 6Ei.~ Ill' S::P Gar JJJ,J il' Trlff~c Jutt~. ICY ICY ]cY JSY ISY ILF ISY ifF I'.S JiF ILF IS¥ ISV IS~ 1[~ 2 J S2S2.OO sm.oo I ss~o.~o I l$l.(ml.s2 $~1.23(.36 J i).ooo.oo s2.~oo.o6 J Si.SSI.lO J SS.IlS.lO SL~S.Q~ I $986.40 I I I I ~2 I $~)s.oo I $2.B~8.00 I ~0 I 12:~.oOI $1t.)60.00 J 1 J $).~Ot,O0 I $).~0~.00 J I $ioO.oo I $J.30~.90 J S?l.?St.oo I $11.~U.00 I &..1 Ilr lCP, Ci,ss · 4M.~. pi°lcP, class . l~1.3 J24' ~, Cliss · 4i~.i 1220 ~P. Cl.ss 13S' ~P. Clus 142' ~. Cl.s lu.! I~* ~P, C~ss 111 461.10 liS' ~P. Clus ~T5.~1 110' ~'d 1AI~ (~.) ~76.51 Il' ~ lille,. Ty~ 'Y' (SD-11, ~od.) 475.1 ILF ILF ILF ILF ILF IL.F ILF ILF ILF ILF JEA lira rEA lEA 1EA. 582.13 ]C~. ~cise~t C~lss 8 - 2000 PS1 611.1 I 2' ~ c~t (Sch. 40) 611.2 J 3' K c~u~t (~. ~03 S24 }~11~xes IEA 12G IC~1 [~lvlt ~m ICY 5 102 250 S 21 5[ 13171 I 7906 ] 114,413.00 Sl. OOO.OO 111,330.00 JS.IOLO0 12.862.00 $10,112.&0 $1,101.~0: $121.00 I $40.4$L00 I $14,415.00 J $1,003.0Q I 100,110.00 I $30,2i0.00 I $135.010.50 $11,660.00 $9.360.00 $1.690.00 $3,110.00 1Lo20.oo l 311,300.00' $2,514.00 $2.156.00 · S2.120:00 S2,120.00 $2,544.00 $1.212.00 $14,413.0t I 10,000.00 $43,100.$0 S30.060.00 $24.240.OO $11,336.00 S3.360.00 11,643.00 I 13,110.00 I $3,110.00 $4,021.00 $2,632.0Q $11,660.00 $2,010.00 Sl.E96.00 S2,120.00 $2,162.00 S3,100.50 Sl.222.00 $0.000.80 $5.224.00 $10,112.00 $661.50 $15.021.20 405 0 210 0 SD.00 SS.00 SS.OD SS.SO S2,00 $4.0D SD.DO $).00 S1.50 SO.OD $420,0D SO.DO S0.00 $0.00 SO.O0 DO.Q0 SO.DO' SO.OD $420.00 $0.00 SO.D0 SO.DO SO.O0 SO.OD SO.O0 $0.00 $0.00 $171.00 So.o0 SO.DO S?OS.OO SO.OD . SO.O0 SD,O0 SO.DO S0.00 SO.O0 SO.Q0 SO.O0 --1SOD.1lCo~tr. Prop. · ,l$OD.OrC~cr. Prop. IC~. Surfacm IrpptJent JCeAcrett RiO P~p 4so l'C-2O1' ~tlin0 100,4 lSll$I 1 oD $0.~) $96,011.04 Sl5.9O0.00 S15,411.14 so. Do so.oD sO.OD' $0.0o $86,111.14 $14,310.00 PLUS JuJ ff EXG]I([ERING, T~SIIKG A~D I~SP[CT]~ FEES PLUS ~0~ ~ IH~ ~ ~ T.E ~IL~O~O C~SSI~G I ~20S.O00 'P~VINU AND DRAINAGE ASSESSMENT R~ DENTON TAP ROAD IMPROVEMENTS [FROM BELT LINE ROAD YO SANDY LAKE ROAD) PROM STATION 88+82 TO STATION 162+27.70 WHICH IS 7245.7 LINEAL FEET WES? 8IDH PROPERTY OWNER PROPERTY DESCRIPTION ABUTTING FEET PAVING & DRAINAGE SPECIAL BENEFIT ASSESSMENT ENHANCEMENT 46 45 44 43 42 41 4O 39 38 NORTELAKE ESTATES A.E.GADDY & HENRY DAVIS 9817 KINGSLEY RD. DALLAS, TX 75238 ST. LOUIS & SOUTHWESTERN RAILROAD F.O.BOX 1319 HOUSTON, TX 77251-1319 BAPTIST FOUNDATION OF TEXAS 2001 BRYAN 11500 DALLAS, TX 75201 BETHEL ROAD DENTON TAP JOINT VENTURE 102 MEADOWCREEK RD. {101 COPPELL, TX 75019 JOSEPH COLLUM THWEATT RT. I BOX 188 COPPELL, TX 75019 BETHEL SCHOOL ROAD JOSEPH COLLUM THWEATT RT. 1 BOX 188 COPPELL, TX 75019 COMMODORE SAVIMGS ASSOCIATION P.O.BOI 2910 DALLAS, TX 75221 LONE STAR GAS EASEMENT 906 N. BLDG. 301 S. HARWOOD ST. DALLAS, TX 75201 H.T. ARDINGER, 9040 GOVERNORS ROW DALLAS, TX 75247 SANDY LAKE CROSSING, LOT 5, BLOCK A KENTUCKY FRIED CHICKEN P.O.BO! 35420 LOUISVILLE, KY 40232 J.A. SIMMONS SURVEY, ABST. {1296 VOLUME 45, PAGE 65 J.A. SIMMONS SURVEY, ABST. {1296 J.A. SIMMONS SURVEY, ABST. {1296 VOL. {67199, PG. 0785 J.A. SIMMONS SURVEY, ABST. 11296 EDWARD A. CROW SURVEY, ABST. {301 VOL. {84038, PG. 3474 EDWARD A, CROW SURVEY, ABST. {301 VOL. {77093, PG. 0009 EDWARD A. CROW SURVEY, ABST. {301 EDWARD A. CROW SURVEY, ABS?. {301 VOL. #89, PG. 2382 EDWARD A. CROW SURVEY, ABST. 1301 VOL. {88002, PO, 3006 EDWARD A. CROW SURVEY, ABST. {301 EDWARD A. CROW SURVEY, ABST. {301 VOL. {B0198, PG. 3516 EDWARD A. CHOW SURVEY, ABS?. {301 753.58 103.53 1208.11 50.04 533.07 1540.19 50.74 1032.79 833.92 58.66 704.38 163.49 $97,030.96 $13,330.52 $105,556.24 $6,443.15 $68,638.09 $198,314.86 $6,533.28 $132,982.04 $107,375.54 $7,553.06 $90,685.97 $21,050.97 37 ~$ANDY LAKE CEOSSING, ~OT 1, ELOC~ . MCDONALDS CORP. TR. AMF OHARE P.O.BOX 6620~ CRICAGO, IL 60666 36 SANDY LIHE CROSSING, LOT 3, BLOCN A EXXON CORP. P.O.BON 53 HOUSTON, TX 77001 EDWARD A. CROW SURVEY, ABST. {301 lb..J0 $25,108.20 (MCDONALDS-VOL ~ ,PG. __) EDWARD A. CROW SURVEY, ABSY. [301 {EXKON TRACT-VOL. { , PG. ) 19.83 $2,553.31 SUBTOTAL 7247.33 $933,166.21 ASSESSMENT FIGURES DETERMINED BY MULTIPLYING ABUTTING FEET BY $12B.76 WHICH IH BASED ON ESTIMATED CONSTRUCTION COST DETERMINED FROM TEE LOW BID RECEIVED. ,** ASSESSMERT FIGURES DETERMINED BASED ON INITIAL ENHANCEMENT STUDY. PAVING AND DRAINAGE ASSESSMENT DENTON TAP ROAD iMPROVEmENTS (FROM BELT LINE ROAD TO SANDY LAKE ROAD) FROM STATION 89+82 TO STATION 162+27.70 WHICU IS 7245.7 LINEAL FEET ABUTTING PROPERTY OWNER PROPERTY DESCRIPTION FEET PAVING & DRAINAGE SPECIAL BENEFIT ASSESSMENT ENHANCEMENT I WILLIAM G. THOMPSON B33 DOUGLAS AVE. { 1510 DALLAS, TX 75225 2 VANTAGE RESIDENTIAL 8144 WALNUT HILL DALLAS, TX 75231 ST. LOUIS & SOUTHWESTERN RAILROAD 3 NORTHLAKE NURSERY & LANDSCAPING 794 DENTON TAP RD. COPPELL, TX 75019 4 WILLIAM G. THOMPSON 5 833 DOUGLAS AVE. ! 1510 DALLAS, TX 75225 BETHEL ROAD R.O.W. 6 RONALD D. VAN NESS 114 MASON CT. COPPELL, TX 75019 MEADOWCREEK DRIVE 7 STEVEN CARL PARSONS 102 MEADOWCREEK COPPELL, TX 75019 8 DAVID A. PHILLIPS & RICHARD J. LEE TRUSTEES FIRST BAPTIST CHURCH, COPPELL 540 S. DERTON TAP COPPELL, TX 75019 9 FIRST REPLUBLIC BANK CARROLLTON 1925 JOSEY LANE CARROLLTON, TX 75006 10 WILLIAM C. STEARMAN III, D.V.M. 504 S. DENTON TAP COPPELL, TX 75019 11 ROANLD D. VAN MESS 114 MASON CT. COPPELL, TX 75019 MCKINNEY & WILLIAMS SURV ABST.{1054 VOL. {80106, PG.1302 & VOL. {75252, PG. 2031 MCKINNEY & WILLIAMS SURV ABST.{1054 622.23 $80,118.33 165.42 $21,299.48 MCKINNEY ~ WILLIAMS SURV ABST.{1054 103.53 $13,330.52 ~CKINNEY & WILLIAMS SURV ABST.{1054 585.46 $75,383.83 VOL. {86109, PG. 0882 MCKINNEY & WILLIAMS SURV ABST.{1054 986.66 $127,042.34 MCKINNEY & WILLIAMS SURV ABST.{1054 80.05 $10,307.24 EDWARD A. CROW SURVEY, ABHT. {301 180.31 $23,216.72 VOL. {84076, PG. 5591 EDWARD A. CROW SURVEY, ABST. {301 50.11 $6,452.16 EDWARD A. CROW SURVEY, ABST. {301 120.49 $15,514.29 VOL. {84181, PG.1044 EDWARD A. CROW SURVEY, ABST. {301 VOL. 372044, PG. 1026 350.00 $45,066.00 EDWARD A. CROW SURVEY, ABST. 1301 206.62 $26,604.39 VOL. L PG. EDWARD A. CROW SURVEY, ABST. {301 VOL. {79061, PG. 1084 EDWARD A. CROW SURVEY, ABST. {301 VOL. {81079, PG 22{4 67.81 $8,731.22 150.00 $19,314.00 DNITED STATES POSTAL 8ER¥ICE DALLAS, TX 75266-7180 EOWARD A. CROW SURVEY, ABST 1301 VOL. {86070, PG. 1149 BRTHEL SCHOOL ROAD EDWARD A. CROW SURVEY, ABST. 4301 13 EDWARD EUGENE & WILLIAM DAVID GADDY 2241 ROYAL LANE DALLAS, TX 75229 EDWARD A. CROW SURVEY, ABST. 4301 VOL. {80120, PG. 2525 14 MORTHLAKE WOODLANDS CENTER 7TN NLS REALITY {226 P.O. BOX 758 HOUSTON, TX 77001 EDWARD A. CROW SURVEY, ABST. {301 VOL. 481234, PG. 1447 VANBEBBER ROAD EDWARD A. CROW SURVEY, ABST. [301 15 LUCY FIELD BELNKAP, LUCY ROSE MAYFIELD & EDWARD A. CROW SURVEY, ABST. 4301 17 MARY HO DELAHAYE VOL. 8 PG. 3900 SHENANDOAH DALLAS, TI 75205 $64,127.63 60.00 $7,735.90 142,66 $18,368.90 124.99 $16,093.71 50~03 $6,441.86 1435.B8 $184,883.91 16 LONE STAR OAS 906 M. BLDG. 301 S. HARWOOD ST. DALLAS~ TX 75201 18 COPPELL BANK NATIONAL ASSOCIATION FDIC 5080 SPECTRUM 1000E DALLAS, TX 75248 BRAEWOOD DRIVE 19 BRAEWOOD CENTRE TEXAS AMERICAN BANK DALLAS P.O.BO! 35207 DALLAS, TX 75235 EDWARD A. CROW SURVEY, ABST, 4301 VOL. {5493, PG. 9 EDWARD A. CROW SURVEY, ABST. 4301 VOL. {85141, PG. 3007 EDWARD A. CROW SURVEY, ABST. {301 EDWARD A, CROW SURVEY, ABST. {301 VOL. {84241, PG. 1666 58.66 $7,553.06 200.00 $25,752.00 60.00 $7,725.60 495.30 $63,774.83 UTILITY EASEMENT 20 TOWN OAKS CENTRE LOT 4 UNIVEST COPPELL VILLAGE 12770 COlT RD. 41215 DALLAS, TX 75251 2t TOWN OAKS CENTRE LOT 3 MINYARD PROPERTIES A?TN: REAL ESTATE P.O.BOX 518 CO~PELL, TX 75019 MEADOWCREEK ROAD - SOUTH SIDE RONALD D. VAN NESS 114 MASON CT. COPPELL, TX 75019 EDWARD A. CROW SURVEY, ABST. 4301 VOL. 4 , PG. EDWARD A. CROW SURVEY, ABST. 4301 VOL. ~B4248, PG. 5137 EDWARD A. CROW SURVEY, ABST. 4301 VOL. 84248, PG. 5137 EDWARD A. CROW SURVEY, ABS?. 4301 VOL. 484076, PG.5591 24.63 $3,171.36 131.15 $16,886.07 286.64 $36,907.77 162,06 $20,866.85 HEADOWCREEK ROAD - NORTU SIDE STEVEN CARL PARSONS 102 MEADOWCREEK ~101 COPPELL, TI 75019 EDHARD A. CROW SURVEY, ABST. {3Ul VOL. 84181, PG. 1044 196.98 $25,363.14 SUBTOTAL 7595.79 $978,033.92 ** ASSESSMENT FIGURES DETERMINED BY MULTIPLYING ABUTTING FEET BY $128.76 WHICH IS BASED ON ESTIMATED CONSTRUCTION COSTS DETERMINED FROM THE LOW BID RECEIVED. ASSESSMENT FIGURES DETERMINED BASED ON INITIAL ENHANCEMENT STUDY.