ST8201-AG 890411SUBMISSION DEADLINE: 5:00 p.m. Monday Re~',: Effective 1/20/88 - I. REF/FILE NUMBER AGENDA REQUEST FORM FOR CITY COUNCIL MEETING: April 11~ 1989 : 379 II. ITEM CAPTION :Discussion and consideration Of a~oroval of a (Change Order No. 2) for adding three additional median openings and five mdd~tiana] ]aft turn lanes; and the west turnout of Parkway Boulevard at Denton Tan: to Denton Tn? Rand Improvements from Sandy Lake Road to Denton Creek as requested by ABe Develo_rm~.n* Carp.. and Univest Development Corp. (See attached reduced xero~ranhic renorductions af pnv~n~ plans marked with median and left turn laneS).staf£ III. ACTION RECOMMENDED : recommends anoroval contingent on receipt of financial committments from the adjacent property owners within 5 after City Council approval. IV. REP. IN ATTENDANCE A: STAFF - Russell R. Doyle, P,~,, CStv F~naer B: OTHER - Ginn, ID~, V. NOTIFICATION TO : METHOD OF CONTACT : DATE : VI. FINANCIAL REVIEW : See attached memo 1. BUDGETED ITEM 2. BUDGET AMOUNT 3. ESTIMATED AMOUNT FOR THIS ITEM 4. AMOUNT OVER .... 5, LOW BIDDER RECOMMENDED YES X NO : $:i6~6~i90 (Net to Date) : N/A YES NO SOURCE OF FUNDING CO'S OR BONDS FUNDS (Series or year authorized) OPERATING BUDGET (Account Number) OTHER City of Coppell CO's : Dallas County Bond Funds APPROVED BY CITY MANAGER : AGENDA REQUEST FORM ITEM NUMBER April 3, 1989 MEMORANDUM TO: FROM: RE: Alan D. Ratliff, City Manager ~ Russell R. Doy~Engineer ~ REQUESTS FOR M~DIAN CUTS AND LEFT TURN LANES ON DENTON TAP ROAD - CIP - SANDY LAKE ROAD TO DENTON CREEK (Memos of 2-6 & 2-21-89) In response to requests from property owners along Denton Tap Road, we have prepared a change order for installing both median openings and left turn lanes at the total expense of those requesting the work, including the construction costs, engineering, testing and inspection. Also included in this change order is the work needed to connect Parkway Boulevard West with Denton Tap Road ($16,806.90). The summary of costs and how they will be shared between ABQ Development Company ($29,254.21), and Univest Development Company ($9,547.60), the property owners, is attached. We have requested commitment letters from these two property owners who have committed to submit their funds within five (5) working days of the approval of this change order by the City Council. This action will accomodate the requests of these two property owners, and in no way obligates the City of Coppell to limit land use or traffic planning around these requested median openings. Having the City's Contractor do this work now, provides a most efficient and cost effective way of getting this work done with the C.I.P. Project, and not have to interrupt and detour traffic at a later date, when this six (6) lane thoronghfare is open to traffic. The location of the median openings and left turn lanes are depicted in the attached drawings, and are located as follows: Station 178 + 17.77 (Median Opening Part of Project Design) Location of the High School construction Site Haul Road, identified as Lot 2 of the Coppell High School Addition Plat, and the location of Coppell Plaza Drive, the main access for the Coppell Health Care Center. Station 182 + 44 (New Opening) Unidentified location just north of an existing drive on the west side of Denton Tap Road. Station 186 + 98 (New Opening) Location of existing drive just across from Town Center on the west side of Denton Tap Road. Station 195 + 28 (New Opening) A desired optimum location selected 6y AB0 Development for their properties on both sides of Denton Tap Road, north of Parkway Boulevard. Please note that the total amount for this item, $52,081.27, on the agenda request sheet, is a construction figure only and is arrived at by adding $35,274.37 (total construction costs to be received from ABQ and Univest), and $16,806.90 (the construction costs for connecting Parkway Boulevard West Extension), for a total construction cost of $47,773.30. Also, please note that the figure "Amount Over Budget", or $40,207.73 on the agenda request sheet is not solely related to this change order, but is related to the project being previously under budget, $11,873.97. Attached is Ginn, Inc.'s recommendation memo. RRD/lsg MEDOPEN xc: John Karlsruher, P.E., Giun, Inc. Steve Goram, Director of Public Works Troy Glidewell, Fire Marshal Tom Griffin, Police Chief April 3, 1989 Memorandum To: From: Subject: Alan D. Ratliff, City Manager Trando, Deputy City Manager/Finance Director~ Frank Change Order #2 to the Denton Tap CIP Change order #2 is in the amount of $52,081.27. The bulk of the change order will be absorbed by ABQ Development in the amount of approximately $26,594.74 and Univest will contribute $8,679.63. The City's portion of this change order will be $16,806.90. This item was not a budgeted item for the West side turn out at the intersection of Denton Tap and Parkway Boulevard. The funding of $16,806.90 will have to come out of the contingency funds that were originally budgeted. It would therefore be incorrect to say that this item was budgeted, but, there are sufficient funds for this project included in the total amount budgeted. I believe that Russell Doyle is in the process of obtaining letters of intent from both ABQ and Univest stating that they will pay their pro-rata share of the change order. FT/lr DENTNTAP.003 April 3, 1989 ~MORAND~ TO: FROM: RE: Alan D. Ratliff, City Manager Doy~., City Engineer Russell R. REQUESTS FOR MEDIAN CUTS AND LEFT TURN LANES ON DENTON TAP ROAD - CIP - SANDY LAKE ROAD TO DENTON CREEK (Memos of 2-6 & 2-21-89) In response to requests from property owners along Denton Tap Road, we have prepared a change order for installing both median openings and left turn lanes at the total expense of those requesting the work, including the constrnction costs, engineering, testing and inspection. Also included in this change order is the work needed to connect Parkway Boulevard West with Denton Tap Road (816,806.90). The summary of costs and how they will be shared between ABQ Development Company ($29,254.21), and Univest Development Company ($9,547.60), the property owners, is attached. We have requested comitment letters from these two property owners who have committed to submit their funds within five (5) working days of the approval of this change order by the City Council. This action will accomodate the requests of these two property owners, and in no way obligates the City of Coppell to limit land use or traffic planning around these requested median openings. Having the City's Contractor do this work now, provides a most efficient and cost effective way of getting this work done with the C.I.P. Project, and not have to interrupt and detour traffic at a later date, when this six (6) lane thoroughfare is open to traffic. The location of the median openings and left turn lanes are depicted in the attached drawings, and are located as follows: Station 178 + 17.77 (Median Opening Part of Project Design) Location of the High School construction Site Haul Road, identified as Lot 2 of the Coppell High School Addition Plat, end the location of Coppell Plaza Drive, the main access for the Coppell Health Care Center. Station 182 + 44 (New Opening) Unidentified location just north of an existing drive on the west side of Denton Tap Road. Station 186 + 98 (New Opening) Location of existing drive just across from Town Center on the west side of Denton Tap Road. Station 195 + 28 (New Opening) A desired optimu~ location selected by ABQ Development for their properties on both sides of Denton Tap Road, north of Parkway Boulevard. Please note that the total amount for this item, $52,081.27, on the agenda request sheet, is a construction figure only and is arrived at by adding $35,274.37 (total construction costs to be received from ABQ and Univeat), and $16,806.90 (the construction costs for connecting Parkway Boulevard West Extension), for a total construction cost of $47,773.30. Also, please note that the figure "Amount Over Budget", or $40,207.73 on the agenda request sheet is not solely related to this change order, but is related to the project being previously under budget, $11,873.97. Attached is Ginn, Inc.'s recomendation memo. RRD/lsg M~DOPEN xc: John Karlsruher, P.E., Ginn, Inc. Steve Goram, Director of Public Works Troy Glidewell, Fire Marshal Tom Griffin, Police Chief GINN, INC. March 29, 1989 Mr. Russell R. Doyle, P.E. City Engineer City of Coppell P.O. Box 478 Coppell, Texas 75019 Re: Denton Tap Road Improvements from Sandy Creek, Change Order No. 2 - Revised. CONSULTING ENGINEERS 3 0 t989 Lake Road To Denton Dear Mr. Doyle: We are transmitting herewith six (6) copies of Change Order No. 2 (Revised) which has been recommended by the Engineer and approved by the Contractor. We recommend that you place this Change Order No. 2 on the agenda of the April 11, 1989 City Council meeting for their approval. We are also enclosing 10 exhibits for the City Council packets, as requested, showing the location of the median openings and left turn lanes covered by Change Order No. 2. As you recall, we had previously prepared Change Order No. 2 for the same items as those included herein, but the Contractor, after having the proposed Change Order in his possession for a period of about one month, elected not to approve the Change Order for the reasons stated in his February 27, 1989 letter, copy attached. We subsequently requested that the item be removed from the February 28, 1989 City Council meeting agenda. After reviewing both the Contractor's request for revision of the Change Order, and his Contract with the City of Coppell, we have determined that he is within his rights under the Contract to request pricing other than the Contract Unit Prices for work added to the Contract. The basis of his claim is that this is new work being added to the scope of work of the Contract, as opposed to an error in estimated quantities, which would have been covered by the existing Contract Unit Prices provided the error did not constitute more than a 20% deviance in the bid quantities for a major item. We have also determined that his proposed price for the "hand work" is reasonable for this type of work. In fairness to all parties concerned, we have revised Change Order No. 2 to allow the Contractor to perform the required "hand work" placements of 8"-3000 psi reinforced concrete for the subject median openings and left turn lanes at the new unit price of $ 16.68 per Square Yard, as measured in place. Any of the concrete placements for the subject median openings and left turn lanes which are done by slip-form methods will be paid for at the existing Contract Unit Price of $ 13.68 per Square Yard. 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900 The total costs shown in the attached Cost Estimates and S,~mmary and Distribution of Construction Costs are based on the $ 16.68 per S.Y. unit price. The new costs reflect an increase of $4,307.97, or 14%, over the initial estimated construction cost for the subject median openings and left turn lanes. ABQ Development's and Univest Development's construction costs increased by the same 14% resulting in increases in construction costs of $3,226.14 and $1,081.83 respectively. The costs for Engineering, Testing and Inspection associated with the subject median openings and left turn lanes increased by 14% also. As you had requested, we have informed both ABQ Development and Univest Development of the situation. We recommend that approval of this Change order No. 2 by the City Council be contingent upon the upon receipt of the financial commitments of ABQ and Univest as originally agreed upon. Please call me if you have any questions. Sincerely, ~' / J~hn C. Ka~ls~her, P.E. Project Engineer attachments cc: H. Wayne Ginn, P.E. ABQ Development Univest Development J-379/280 (a:rd379co2) J379C02 DENTON TAP NOAD IMPROVEMEMTG from SANDY LACE RD. to DENTON CREEK ESTIMATED COST OF ABQ DEV. AND UNIVEST DEV. REQUESTED MEDIAN OPENING AND LEFT TURN LANES 3 - 17 - 1909 CHANGE ORDER NO. 2 STATION 178+17.77 - SOUTHBOUND LEFT TURN LANE FOR UNIVEST DEV. C1001 STORAGE) ITEM i DESCRIPTION I UTS I QUANTITY I UNIT PRICE i AMOUNT i BASE BIS 6 LANE PAVEMENT 110 160 164 260 264 264.1 360.1 360.2 360.6 530.1 672 676.1 676.2 618.1 618.2 618.3 624 Roadway Excavation ICY Piece Topsoil - Hedian (6" thick) ~SY Broadcast Seeding (CGimon Berm) lay Lime treatment, mat. in place IsY Lime slurry, Ty A., 5X 22.5 #/my ITOH Lime aLurry, Ty A., 5X 3& #lay (9" Thick) ITOH D" conc. pavement 3000 psi ISY 6N Honolithic Curb (3000 psi) ILF D#conc. pavement 3000 psi (non-sLipform) IsY 6" conc. (Drivewaye & Median Nosea) IsY 6"x6" Jiggle Bar (refi.)CType 1-C) lEA &" Traffic Sutton, Uhlte(Non-RefL.)CP-7-U) lEA 4" Traffic Button, Vhite(sing.-Refi.)CP-15-W) lEA 2" PVC conduit (Sch. &O) ILF 3# PVC conduit (Sch. 40) ILF 4" PVC conduit ($ch. 40) ILl Putiboxea lEA 29.9 -147.09 -147.09 179.48 0 3.05 O 15.14 179.41 -32.31 10 0 0 -14.4S -7.24 -7.24 0 S6.60 S0.50 S0.42 S1.05 S67.00 563.00 $13.68 S1.00 S16.68 $24.00 S5.00 S2.00 S6.00 $2.40 S3.00 S3.73 $127.00 S197.34 ($61.78) S188.45 S0.00 S192.15 SO.O0 S15.14 S2,992.56 (S775.44) S50.00 S0.00 S0.00 (S34.75)1 (521.72)1 (527.01)] $o.oo I SUBTOTAL S2,641.40 STATION 182+44 - MEDIAN OPENING FOR UNIVEST DEV. AND ABQ DEV. ITEM I DESCRIPTION I UTS I QUANTITY I UNIT PRICE BASE BID 6 LANE PAVEMENT I 110 160 164 260 264 264.1 360.1 360.2 360.6 530.1 672 676.1 676.2 618.1 618.2 618.3 624 Roadway Excavation IcY Place Topsoil - Median (6" thick) IsY 8roadcaat Seeding (Common Berm) IsY Lime treatment, mat. in place IsY Lime slurry, Ty A., 5X 22.5 #/my ITON Lime slurry, Ty A., 5X 34 #/my (9" Thick) ITON 8" conc. pavement 3000 psi IsY 6# Monolithic Curb (3000 psi) ILF 8" conc. pavement 3000 psi (non-stipform) lay 6" conc. (Driveways & Median Noses) IsY 6"x6. Jiggle Bar (reft.)(Type 1-C) lEA 4" Traffic Button, UhiteCNon-Reft.)(P-7-W) lEA 4" Traffic Button, Vhlte(sing.*Reft.)(P-15-~) lEA 2# PVC conduit (Sch. 40) ILF 3" PVC conduit (ach. 40) ILF 4# PVC conduit (Sch. 40) ILF Pultboxes IEA 28.53 -239.79 -239.79 167.87 0 2.85 0 -179.84 181.2 58.57 0 -16 -16 119 119 119 S6.60 S0.50 $0.42 $1.05 S67.00 S63.00 S13.68 $1.00 S16.68 $24.00 S5.00 S2.00 S6.00 S3.00 S3.T3 $127o00 s188.3o ($119.90) (S100.71) $176.26 SO.O0 S179.55 S0.00 C$179.84) S3,022.42 Sl,405.68 SO.O0 ($32.00)] ¢s96.oo)1 S285.60 S357.00 5443.87 s5oe.o0 SUBTOTAL s6,038.23 J379C02 STATION 102.44 - NORTHBOUND LEFT TURN LANE FOR ABQ DEV. (100' STORAGE) ITEM I DESCRIPTION I UTS I QUANTITY I UNIT PRICE I AHOUNT I BASE BID 6 LANE PAVEMENT 110 160 164 260 26& 26&.1 360.1 360.2 360.6 530.1 672 676.1 676.2 618.1 618.2 618.3 624 Rosdusy Excavation IcY Piece Topsoil - Median (6# thick) IsY Broadcast Seeding (Common Berm) IsY Lime treatment, mat. in place IsY Lime slurry, Ty A., 5X 22.5 #/sy ITOH Lime slurry, Ty A., 52 34 #/my (9" Thick) ITOH 8" conc. pavement 3000 psi IsY 6" Monolithic Curb (3000 psi) ILF 8" conc. pavement 3000 psi (non-slipform) IsY 6" conc. (Drlveuays & Median Noses) IsY 6"x6" Jiggle Bar (refi.)CType 1-C) lEA 4# Traffic Button, Uhlte(Non-RefL.)(P-7-U) lEA 4N Traffic Button, Uhlte(sing.-Refi.)(P-15-V) lEA 2" PVC conduit (Sch. 40) ILF 3e PVC conduit (Sch. 40) ILF 4" PVC conduit (Sch. 40) ILF PuiLboxes lEA 33.44 -226.87 -226.87 200.68 0 3.41 0 200.61 26.26 10 0 0 0 0 0 0 S6.60 S0.50 S0.42 $1.05 S67.00 S63.00 S13.68 $1.00 S16.68 S24.00 S5.00 S2.00 $6.00 $2.40 $3.00 $3.73 $12T.00 S220.70 I (s95.29)I $21o.71 SO.O0 S214.83 S0.00 S3,346.17 S630.24 $$0.00 SO.O0 S0.00 S0.00 SO.O0 $0.00 S0.00 SUBTOTAL STATION 186+98 - HEDIAN OPENING FOR UNIVEST DEV. AND ABQ DEV. ITEM ~ DESCRIPTION I UTS I QUANTITY ~ UNIT PRICE I AMOUNT BASE BID 6 LANE PAVEHENT I 110 160 164 260 264 264.1 360.1 360.2 360.6 530.1 6?2 676.1 6?6.2 618.1 618.2 618.3 624 Roadusy ExcsvatJon IcY Place Topsoit- Median (6" thick) IsY Broadcast Seeding (COMOn Berm) IsY Lime treatment, lat. tn place IsY Lime slurry, Ty A., 52 22.5 #/sy ITOH Lime slurry, Ty A., 52 34 #/sy (9N ThLck) ITOH 8u coflc, pavement 3000 psi IsY 6" Monolithic Curb (3000 psi) ILF 8#conc. pavement 3000 psi (non-sttpform) ISY 6# conc. (DrJveusys & Median Noses) IsY 6-x6# Jiggle Bar (refi.)CType 1-C) lEA 4" Traffic Button, Uhite(Non-Refl.)Cp-?-U) lEA 4" Traffic Button, Vhtte(stng.-Refi.)(P-15-V) lEA 2# PVC conduit (Sch. 40) ILF 3" PVC conduit (Sch. 40) ~LF 4# PVC conduit (Sch. 40) ILE Putiboxes IEA 28.53 -239.79 -239.79 167.87 0 2.85 0 -179.84 181.2 58.57 0 -16 -16 119 119 119 $6.60 S0.50 S0.42 S1.05 S67.00 S63.00 S13.68 S1.00 S16.68 S24.00 S5.00 S2.00 S6.00 S2.40 S3.00 S3.73 S127.00 s188.3o I (s119.9O)l (SLOO.?1)1 S176.26 I $o.oo I S179.55 I so.aa I (S179.84)1 S3,022.42 Sl,405.68 SO.O0 (S32.00) CS96.oo) S285.60 S357.00 S443.87 S508.00 SUBTOTAL S6,038.23 J379C02 STATION 186+98 - NORTHBOUND LEFT TURN LANE FOR ABQ DEV. (100' STORAGE) ITEM I DESCNIPTIOH I UTS I QUANTITY I UNIT PRICE I AMOUNT 110 160 164 260 264 264.1 360.1 360.2 360.6 530.1 672 676.1 676,2 618.1 618.2 618.3 624 IBASE BIO 6 LANE PAVEMENT Rosdusy Excavation PLace Topsoil - Median (6# thick) Broadcast Seeding (Common Berm) Lime treatment, nmi. in place Lime slurry, Ty A., 52 22.5 g/my Lime slurry, T¥ A., 52 34 #/my (9# Thick) 8' cone. pavement 3000 psi 6" MonoLithic Curb (3000 psi) 8" con(. pavement 3000 psi (non-sllpform) 6" COhC. (Orlveueys & Hedlsfl Noses) SNX6N Jiggle Bar (refL.)CType 1-C) 4# Traffic Button, Uhlte(Non-Refi.)(P-7-W) 14# Traffic Button, Uhlte(slng.-RefL.)CP-15-U) I 2N PVC conduit (ach. 40) t 3# PVC conduit (ach. 40) · I 4# PVC conduit (Sch. 40) IPuLLboxes SUBTOTAL I IcY IsY IsY ITOH ITOH laY laY ISY lEA lEA lEA ILF lEA 33.44 -226.87 -226.07 200.60 0 3.41 0 -44.7 200.61 26.26 10 $6.60 S0.50 S0.42 S1.05 $67.00 S63.00 S16.68 S1.00 s16.68 s24.oo S5.00 0 S2.00 0 S6.00 O S2.40 0 $3.00 0 S3.73 0 $127.00 S220.70 (Sl13.44) (S95.29) $210.71 SO.O0 S214.83 gO.OO (g44.70) s3,346.17 S630.24 S50.00 SO.O0 S0.00 SO.O0 SO.G0 SO.O0 S0.00 S4,419.24 STATION 195+28 - HEDIAN OPENING AND LEFT TORN LANES FOR ABQ DEV. ITEM I DESCRIPTION I UTS I QUANTITY BASE BIO 6 LANE PAVEMENT 110 160 164 260 264 264.1 360.1 360.2 360.6 530.1 672 676.1 676.2 618.1 618.2 618.3 624 Rosduay Excavation ICY PLace Topsoil - Hedtan (6N thick) ISY Broadcast Seeding (Co~vnon Berm) IsY Lime treatment, mst. in place tSY Lime slurry, Ty A., 52 22.5 g/my ITOH Lime starry, Ty A., 52 34 J/By (9" Thick) JTON 8" conc. pavement 3000 psi laY 6" MonoLithic Curb (3000 psi) ~LF 0" conc. pavement 3000 psi (non-silpform) lay 6" conc. (Driveuays & Median Noses) ]SY 6#x6" Jiggle Bar (reft.)CType 1-C) lEA 4# Traffic Button, Uhite(Non-RefL.)(P-?-U) lEA 4# Traffic Button, Wh[te(slng.-RefL.)(P-15-U) lEA 2" PUC conduit (ach. 40) ILF 3" PUC conduit (ach. 40) ILF 4" PVC conduit (Sch. 40) !Puitboxes JEA 82.17 -545.49 479.78 3.39 3.03 0 -210.72 492.96 52.52 18 -16 -16 111 111 111 S6.60 S0.50 S0.42 S1.05 S67.00 S63.00 S13.68 S1.00 S16.68 S24.00 S5.00 S2.00 $6.00 S2.40 S3.00 S3.73 S127.00 S542.32 (g272.75) ($229.11) S503.77 S227.13 $190.89 SO.O0 (S210.72) S8,222.57 S1,260.48 S90.00 (S32.00) (g96.00) S266.40 S333.00 $414.03 S508.00 SUBTOTAL S11,718.02 J379C02 EUHHANY AND DISTRIBUTION OF CONSTRUCTION COSTS: #EDIAN OPENINGS: STATION 182+44 STATION 186+98 STATION 195.28 SUBTOTAL #EDIAN OPENINGS LEFT TURN LANES: STATION 178+17.77 STATION 182+44 STATION 186+98 STATION 195+28 NORTH BOUND STATION 195+28 S~JTH BOUBD SUBTOTAL LEFT TURN LANES ABO DEV. UNIVEST DEV. TOTAL $3,019.12 $3,019.12 S6,038.23 S3,019.12 S3,019.12 S6,038.23 S4,235.61 S0.00 S4,235.61 $10,273.84 $6,038.23 $16,312.07 SO.O0 S2,641.40 S2,641.40 S4,419.24 $0.00 $4,419.24 $4,419.24 SO.O0 S4,419.24 S3,986.54 SO.O0 S3,986.54 $3,495.88 SO.O0 $3,495.88 $16,320.90 $2,641.40 S18,962.31 TOTAL ESTINATED CONSTRUCTION COST S26,594.74 S5,679.63 $35,274.37 ENGINEERING, TESTING AND INSPECTION O lOX $2,659.47 $867.96 $3,527.44 GRAND TOTAL $29,254.21 $9,547.60 S38,801.81 FJlNN, .fNl.:. , CONSIJL 'I'iN~; ENGINEERS 1 ? ! ():).". F'RE~,:';TON F¢OAD SUITE 11:~0, lP-ll~ [)ALLA~% TEXhS '75248 ,/[)HN I.. I /~RI...;~HIJIILR, P.E. I:,'E; PFr. Ii'~!I'J I';.',P [:",i,"d) Ih['F,'I)VIJM[:.I',IT FROM ShND'/ LAk'E TO i i:",'i I" '] (~!.'?"?.~ L.. H. t ~ll':Y HILL AGF:F'I~i 'I'TI C}'IIIN:iE ORI)ER...,'" PRO',/IDED_ . t:~,INN~ INg.~ ANI) THE CT~TY ['IF [;or'I~,E'LI. WII.L AbFd:iE TO THE FOLLOWXNI'3: 1) ¢~S YOU SF/~I'ED IN YE)UR L. ET'rL.':R, THIS CHANGE ORDER INCR6~SES THE SCOPE OF WORK. THAT INf~'REABED SCOPE OF N[JR}( I~ AN :[i'.]CF¢~P~SE ['IF 2.&,'.,%, [:hI_CUtATED BY ESTIMA'I'ED ~)(JLLAR VOLUMES LISTED ON THE FAC[;. OF THE CNANGF ORDER. FOR THIG ):Nt:~REA~ED SCOPE OF' %~II]RK !... II. t./-',CY NEE[>'$ JO CALENI)¢~F,: DAYS ADDED TO THE; C[)NI'F~ACT TIME. ':2 ) 'FH.[S iNCREA~]Ei) SCOPE OF HORK ALSO CHANGES THE Sb'I]PE OF WORK FOR ]HE L.o H. LACY COMPANY. OUR INITIAL BID PRICE FOR 'rile ITEM :XM). :l tS" CI]NC. PAVEMENT 5000 PSI) IS BASED ON A RATI[} OF Me,CHINE WORK TO HAND WOF<K. THIS RATIO HAS BEEN AFF'ECIFh AI::'PRECIt~[~Ly, Arid L..H. LACY NEEDS ADDII'IONAI... [JR ~t tlNll' PR1CE OF ~16.68)~jY~ FOR THE 14.$~/SY · 4.15o8.(,0' ~NCRE¢ISE ~]V~R WHAT iS NOW SHOWN ON THE CHANBE 131 (DER. L. Ft. I.¢.~CY CI.'IMF.~Ny FEELS THIS ~.t FAIR, AND EQUITABLE AFdr~fiNGE:HEN'[' I:'CF ALL. PARTIES INVOLVED. IF WE. CAN AOREE ON THE Il,fi') bib )Il [ ~N., S"!A]'ED RI)OVE~ WE WILL [~E BEAD ]O SIGN THE .1'1 ',['bE 3 ~ .)t..f~. L H. Lacy Company General Contractors 214/357-0146 LP~C¥ 'Oualily Col~$1rucliofl lot over 65 Yelrl~ 10888 Shady Trail P.O. Box 541297 Dallas, Texas 75354-1297 PI{OSF. CI': Denton Tap Road Improvements from Sandy Lake Road to Denton Creek ()WNI~R: City of Coppell (N:,,,,c. P.O. Box 478 Address) Coppell, TX 75019 I)ATF. OF ISSUANCI{: March 17, 1989 CONTRACrOR: L.H. Lacy Co. OWNER's I';x~cct P.O. BOX 541297 Dallas, TX 75354-1297 EN(}INI~I{I{: Ginn, Inc. 17103 Preston Road, Suite 100 CONTRACrFOR:Denton Tap Road Improvements Dallas, TX 75248 from Sandy Lake Road to Denton Creek I{NGINEI{R'sI'r~¢cl No. 379 You arc dir¢cled Io make Ihe G)llowing changes iii Ihe Contract I~.;umenls. I)c~criplion: See Attachment "A" I'url~lSe of Change Order: See Attachment "A" See Attachment "A" CI IAN(;F. IN CONTR^CI' 1 I(ICI:: Original Contract Price 5. 1,789,363.03 (estimated) I'rcvious Chan~ Orders No. 1 lo No. 1 · and Field Changes No. 1 to No. 5 $ 2,126.05 (estimated) Conlracl IN'icc prior I<, Ibis Change Order 1,791,489.06 (estimted) Ncl Increase (,m~"~ o£ s C gc Order $ 52,081.27 (estimated) Conll'aCl I'rice with ;ill approved Change ()rd¢ls S 1,843,570.33 (estimated) CII^NGE IN CONTR^CI"I'IMI{: Original Collll'aCl Time 365 calendar days Nel change from previous Change Orders day,* ColltracI Time I'rior lo lids Chaflgc Older 365 calendar days Ncl IiICl'Case {decrease) of lids Change Order lO Conlracl Thuc wilD; :ill approved Chauge Ordcr~ 375 calendar days I(F, COM M I'.'N I)F,D: AI'I'I{OVI';I): by by FJCI)C No. 19111-X-II (19X3 F, dilion) ^ I'1'1(O¥ F.I): /~TT~CHMENT "/~" DESCRIPTION= Construct: Median openings at stations 182+44, 186+98 and 195+28; northbound left-turn lanes with the median openings at stations 182+44, 186+98 and 195+28; southbound left-turn lanes with the median openings at stations 178+17.77 and 195+98; and the west turnout for Parkway Blvd.; all in accordance with the drawings in the attached Drawing List and the Specifications. PURPOSE OF CHAN~E ORDER~ To provide access to properties. planned developments on the adjacent ATTACHMENTS 1.) 2.) 3.) 4.) 5.) (List documents supporting change) Estimated Costs of Construction Drawing List Transmittal letter for drawings issued to Contractor on 1/17/89 L.H. Lacy Co. letter to Ginn, Inc. dated 2/27/89 Ginn, Inc. letter to L.H. Lacy Co. dated 3/17/89 J379C02 DENTON TAP gOAD IMPROVEMENTS from SANDY LAKE RD. to DENTON CREEK ESTIMATED COST OF ABQ DEV. AND UNIVEST DEV. REQUESTED MEDIAN OPENING AND LEFT TURN LARES 3 - 17 - 1989 CHANGE ORDER NO. 2 STATION 178+17.77 - SOUTHBOUND LEFT TURN LANE FOR UNIVEST DEV. (100' STORAGE) ITEM I DESCRIPTION I UTS I QUANTITY I UNIT PRICE BASE BID 6 LANE PAVEMENT 110 160 16~ 260 26~ 26~.1 360.1 360.2 360.6 530.1 672 676.1 676.2 618.1 618.2 618.3 62~ RoadMay Excavation IcY Piece Topsoil - Median (6** thick) IsY Broadcast Seeding (Common Berm) IsY Lfme treatment, mat. in place ISY Lime SLurry, Ty A., 5X 22.5 #/sy ITOH Lime stuffy, Ty A., 5~ 3G #/sy (9*8 Thick) iTOH 8" cant. pavement 3000 psi IsY 6# Monolithic Curb (3000 psi) 8" conc. pavement 3000 psi (nofl-stipform) 6" conc. (Driveways & Median Hoses) ISY 6"x6" JiggLe Bar (refL.)(Type I-C) lEA ~N Traffic Button, UhJte(Non-RefL.)(P-7-g) ~EA 4" Traffic Button, ghite(sJng.-Refi.)(P-15-U) lEA 2# PVC conduit (Sch. 40) ILF 3' PVC conduit ($ch. &O) ILF 4" PVC conduit (Sch. &O) ILF Puliboxes JEA 29.9 -1~7.09 -1~7.09 179.~8 0 3.05 0 15.14 179.~1 -32.31 10 0 0 -14.48 -7.24 -7.24 0 S6.60 S0.50 S0.42 S1.05 $67.00 $63.00 $13.68 S1.00 S16.68 $24.00 $5.00 S2.00 S6.00 $2.~0 S3.00 $3.73 $127.00 S197.3& ($73.55) ($61.78) S188.45 $0.00 S192.15 S0.00 S15.1~ S2,992.56 ($775.44) $50.00 S0.00 S0.00 ($34.75) ($21.72) (S27.01){ $o.oo I SUBTOTAL $2,641.40 STATZON 182*44 - MEDIAN OPENING FOR UNIVEST DEV. AND ABa DEV. ITEM I DESCRIPTION BASE BIO 6 LANE PAVEMENT 110 160 164 260 264 264.1 360.1 360.2 360.6 530.1 672 676.1 676.2 618.1 618.2 618.3 62~ Roadway Excavation ICY PLace Topsoil - Median (6" thick) IsY Broadcast Seeding (Common Berm) ISY Lime treatment, mat. in place IsY Lime sLurry, Ty A., 5~ 22.5 #/sy ITOH Lime slurry, Ty A., 5~ 3& #/sy (9" Thick) ITOH 8" conc. pavement 3000 psi ISY 6" Monolithic Curb (3000 psi) ILF 8" conc. pavement 3000 psi (non-siipform) IsY 6" conc. (Driveways & Median Hoses) IsY 6'*x6" Jiggle Bar (refL.)(Type 1-c) lEA 4" Traffic Button, Uhite(gon-RefL.)CP-7-~) lEA &" Traffic Button, ~hite(sing.-Refi.)(P-15-U) lEA 2" PVC conduit (Sch. 40) ILF 3" PVC conduit (Sch. &O) ILF 4" PVC conduit (Sch. 40) ILF PuLiboxes lEA 28.53 -239.79 -239.79 167.87 0 2.85 0 -179.84 181.2 58.57 0 -16 -16 119 119 119 S6.60 S0.50 S0.42 S1.05 $67.00 S63.00 S13.68 $1.00 $16.68 S24.00 $5.00 S2.00 $6.00 $2.40 $3.00 S3.73 $127.00 $188.30 ($119.90) ($100.71) $176.26 $0.00 $179.55 S0.00 (S179.8~) $3,022.42 $1,405.68 S0.00 (S32.00) ($96.00) $285.60 S357.00 $443.87 $508.00 SUBTOTAL S6,038.23 J379C02 STATION 182+44 - RORTHBOU#D LEFT TURN LANE FOR ABG DEV. (100e STORAGE) ITEM I DESCRIPTION I UTS I DUANTITY I UNIT PRZCE I AMOUNT 110 160 164 260 26& 264.1 360.1 360.2 360.6 530.1 672 676.1 676.2 618.1 618,2 618.3 62& IBASE BID 6 LANE PAVEMENT IRoaduey Excavation IPtace Topsoil - Median (6" thick) IBroadcast Seeding (Common Serm) ILime treatment, mat. in place 1Lime slurry, T¥ A.o 52 22.5 #/sy ILtme slurry, Ty A., 52 34 #/sy (9" Thick) 8" conc. pavement 3000 psi 6" Nonotithtc Curb (3000 psi) 8" conc. pavement 3000 psi (non-sttpform) 6#conc. (Driveways & Median Noses) 6.x6. Jiggle Bar (refl.)(Type 1-C) 4# Traffic Button, White(Non-Refl.)(P-7-U) &' Traffic Button, Uhfte(sing.-Refl.)(P-15-u) 2N PVC conduit (Sch. &O) 3" PVC conduit (Sch. 40) 4" PVC conduit (Sch. 40) Pullboxes I IcY IsY SY SY TON TON SY LF SY lEA lEA ILF 33.44 -226.87 -226.87 200.68 0 3.41 0 -44.7 200.61 26.26 10 0 0 $6.60 $0.50 $0.42 $1.05 867.00 $63.00 $13.68 S1.00 S16.68 $24.00 S5.00 $2.00 $6.00 0 S2.40 0 $3.00 0 S3.73 0 $127.00 S220.70 (S113.44) (S95.29) S210.71 S0.00 S214.83 S0.00 ($44.70) $3,346.17 $630.24 S50.00 $0.00 $0.00 S0.00 $0.00 $0.00 $0.00 SUBTOTAL S4,419.24 STATION 186+98 - MEDIAN OPENING FOR UNIVEST DEV. AND ABQ DEV. ITEM ~ DESCRIPTION I UTS I QUANTITY I UNIT PRICE ~ AMOUNT BASE 810 6 LANE PAVEMENT I 110 160 164 260 264 264.1 360.1 360.2 360.6 530.1 672 676.1 676.2 618.1 618.2 618.3 624 Roadway Excavation IcY Place Topsoil -Nedtan (6' thick) ISY Broadcast Seeding (Common Berm) IsY Lime treatment, mat. in place ~SY Lime slurry, Ty A., 5~ 22.5 #/sy ITOH Lime slurry, Ty A., 5X 34 #/ay (9" Thick) ITON 8#conc. pavement 3000 psi IsY 6# Monolithic Curb (3000 psi) ILF 8" conc. pavement 3000 psi (non-aLipform) lSY 6" conc. (Drfvewaya & Median Noses) ISY 6'x6" Jiggle Bar (refl.)(Type 1-C) lEA 4" Traffic Button, White(Non-RefL.)(P-7-W) 14- Traffic Button, ghlte(sing.-Refl.)(P-15-g) lEA I 2" PVC conduit (Sch. 40) ILF ~ 3" PVC conduit (Sch. 40) ILF I 4" PVC conduit (ach. 40) ILF IPul~boxes lEA 28.53 -239.79 -239.79 167.87 0 2.85 0 -179.84 $6.60 S0.50 $0.42 $1.05 $67.00 S63.00 $13.68 81.00 181.2 $16.68 58.57 S24.00 0 $5.00 -16 S2.00 -16 $6.00 1t9 S2.40 119 S3.00 119 S3.73 4 $127.00 S188.30 ($119.90) (S100.71) $176.26 $0.00 S179.55 S0.00 ($179.84) $3,022.42 $1,405.68 $0.00 (S32.00) ($96.00) S285.60 S357.00 S443.87 $508.00 SUBTOTAL $6,038.23 J379C02 STAT]OR 186+98 - RORTHBOUND LEFT TURN LANE FOR ABQ DEV. (100" STORAGE) ITEM I DESCRIPTION I UTS I QUANTITY I UNIT PRICE I AMOUNT BASE BID 6 LANE PAVEMERT I 110 160 164 260 264 26&.1 360.1 360.2 360.6 530.1 672 676.1 676.2 618.1 618.2 618.3 62& Roadway Excavation IcY Pi#ce Topsoil - Median (6" thick) lay Broadcast Seeding (C~n Berm) IsY Lime treatment, mat. in piece ~SY Lime slurry, Ty A., 5X 22.5 #/sy ITOH Lime slurry, Ty A., 5~ 3& #/ay (9" Thick) ITOH 8" cone. pavement 3000 psi lay 16" NonoLithJc Curb (3000 psi) ILF 8# cone. pavement 3000 psi (non-sLipform) ISY 6" cone. (Driveways & Median Noses) IST 6""x6# Jiggle Bar (refL.)(Type 1-C) lEA 4*" Traffic Button, Uhite(#on-Refi.)(P-7-W) 4" Traffic Button, White($1ng.-RefL.)(P-15-U) lEA 2" PVC conduit (ach. 40) ILF 3" PVC conduit (Sch. 40) ILF 4# PVC conduit (ach. 40) ILF PulLboxes lEA 33.44 -226.87 -226.87 200.68 0 3.41 0 200.61 26.26 10 0 0 0 0 0 0 $6.60 $0.50 S0.42 $1.05 S67.00 $63.00 $16.68 S1.00 S16.68 S24.00 $5.00 S2.00 $6.00 $2.40 $3.00 $3.73 $127.00 $220.70 (3113.44) (S95.29) $210.71 $0.00 $214.83 S0.00 ($44.70) $3,346.17 S630.24 $50.00 $0.00 $0.00 SO.O0 S0.00 $0.00 $0.00 SUBTOTAL $4,419.24 STATION 195+28 MEDIAN OPENING FOR ABO DEVELOPMENT ITEM I DESCRIPTION I UTS ~ QUANTITY I UNIT PRICE I AMOUNT [BASE BID 6 LANE PAVEMENT I 110 160 164 260 264 264.1 360.1 360.2 360.6 530.1 672 676.1 676.2 618.1 618.2 618.3 624 IRoadHay Excavation IcY IPtace Topsoil - Median (6" thick) IsY IBroadcast Seeding (Common Berm) ISY 1Lime treatment, mat. in pt#ce lay Lime slurry, Ty A., 5~ 22.5 #/ay ITO# Lime slurry, Ty A., 5% 34 #/sy (9" Thick) ITOH 8" cone. pavement 3000 psi lay 6# MonoLithic Curb (3000 psi) ILF 8'* cone. p.vement 3000 psi (non-siipform) lSY 6" conc. (Driveways & Median Noses) ISY 6#x6# JiggLe Bar (refi.)(Type 1-C) lEA 4" Traffic Sutton, ~hite(Non-Refi.)(P-7-u) lEA 4" Traffic Button, ~htte(sing.-RefL.)(P-15-u) lEA 2" PVC conduit (ach. 40) ILF 3# PVC conduit (ach. 40) ILF 4" PVC conduit (Sch. 40) ILF Pultboxes lEA 26.67 -160 -160 146.67 1.65 0 0 -120 160 0 0 -16 -16 111 111 111 & S6.60 S0.50 S0.42 S1.05 $67.00 S63.00 S13.68 $1.00 $16.68 $24.00 $5.00 S2.00 S6.00 $2.40 $3.00 $3.73 3127.00 S176.02 ($80.00) (S67.20) S154.00 S110.55 $0.00 $0.00 (S120.00) S2,668.80 $0.00 S0.00 ¢S32.00) (S96.00): S266.40 S333.00 S414.03 $508.00 SUBTOTAL $4,235.61 J]79C02 STATION 195+28 NORTHBOUND LEFT TURN LANE (80e STORAGE) FOR ABQ DEVELOPMENT ========================================================================================================= ITEM I DESCRIPTION ~ UTS I QUANTITY I UNIT PRICE I AMOUNT I BASE BID 6 LANE PAVEMENT I 110 Roaduay Excavation IcY 29.7& S6.60 $196.28 160 PLace Topsoil - #edian (6# thick) ISy -20/*.65 S0.50 (S102.33) 16/* Broadcast Seeding (Common Berm) ISY -20/*.65 S0./*2 (385.95) 260 Lime treatment, mat. in place IsY 178.46 $1.05 $187.38 264 Lime slurry, Ty A., 5X 22.5 #/sy ITOH 0 367.00 $0.00 264.1 Lime slurry, Ty A., 5X 34 #/sy (9" Thick) ITOH 3.03 $63.00 $190.89 360.1 8" conc. pavement 3000 psi ISy 0 313.68 SO.O0 360.2 6"' #onollthic Curb (3000 psi) ILF -45.36 $1.00 ($/*5.36) 360.6 8" conc. pavement 3000 psi (non-slipform) ISY 178.38 S16.68 $2,975,38 530.1 6" conc. (Driveways & Median Noses) IsY 26.26 324.00 3630.24 672 6"x6" JiggLe Bar (reft.)(Type 1-C) lEA 8 SS.00 $40.00 676.1 4" Traffic Button, Uhite(Non-Ref[.)(P-7*U) lEA 0 $2.00 $0.00 678.2 4# Traffic Button, Uhfte(sing.-Ref%.)(P-15-U) lEA 0 $6.00 $0.00 618.1 2# PVC conduit (Sch. 40) ILF 0 $2.40 $0.00 618.2 3" PVC conduit (Sch. 40) ILF 0 $3.00 $0.00 618.3 4# PVC conduit (Sch. 40) JLF 0 $3.73 $0.00 624 PuLtboxes lEA 0 $127.00 $0.00 SUBTOTAL S3,986.54 STATION 195+28 SOUTHBOUND LEFT TURN LANE (100' STORAGE) FOR ABO DEVELOPMENT ITEM ~ DESCRIPTION BASE BID 6 LANE PAVEMENT 110 160 164 260 264 264.1 360.1 360.2 360.6 530.1 672 676.1 676.2 618.1 618.2 618.] 624 Roaduay Excavation ICY PLace Topsoil - Median (6" thick) ~SY Broadcast Seeding (Common Berm) IsY Lime treatment, mat. in place IsY Lime slurry, Ty A., 5~ 22.5 #/sy ITOH Lime slurry, Ty A., 5~ 34 #/sy (9" Thick) 1TON 8" conc. pavement 3000 psi 6# MonoLithic Curb (3000 psi) ILF 8" conc. pavement 3000 psi (non-stipform) ISY 6#conc. (Orlveuays & Median Hoses) IsY 6#x6" JiggLe Bar (ref[.)(Type 1-C) lEA 4" Traffic Button, Uhite(Non-RefL.)(P-7-g) lEA 14# Traffic Button, Uhite(slng.-RefI.)(P-15-~) lEA I 2" PVC conduit (Sch. 40) ILF I 3" PVC conduit (Sch. 40) ]LF I 4" PVC conduit (Sch. 40) IPuiLboxes 25.76 - 180.8~ 154.65 1.7/* 0 0 -45.36 154.58 26.26 10 0 0 0 0 0 0 $6.60 $0.50 $1.05 $67.00 $63.00 $13.68 $1.00 S16.68 S24.00 $5.00 S2.00 $6.00 S2.40 S3.00 $3.73 S127.00 S170.02 ($90.42) (S75.95) S162.38 $116.58 $0.00 SO.O0 S2,57B.39 S630.24 $50.00 $0.00 S0.00 S0.00 S0.00 $0.00 $0.00 SUBTOTAL S3,495.88 J379C02 ESTINATED COST OF ADDITION OF UEST SIDE TUR#OUT AT THE DENTON TAP RD./PARKWAY BLVD I#TERSECTIOR (CITY OF COPPELL) ITEH I DESCR~PTIOH I UTS I QUARTZTY I UNIT PRICE I A#OUBT I 100 110 131 133 260 264.1 360.2 360.3 360.4 530.1 530.2 530.3 618.2 62~ 666.1 BASE BID 6 LANE PAVE#ENT Prepare R.O.~. ISTA Roadway Excavation ICY Borrow (OeLiv.)(d.c.),Type B, Ct.3 IcY Remove/RepLace unstable material IcY Lime treatment, mst. in place Lime slurry, Ty A., 5X 34 #/sy (9# Thick) iTOH 6" #onolithJc Curb (3000 psi) ILF Concrete street header ~LF 18" Conc. Pavement Int. Streets ISY 6" conc. (DrtveHays & #edfan Noses) IsY IBrick pavers (Uni-Decor) ISY IBrick pavers (HolLand I) ISY 3# P¥C conduit (Sch. ~0) ILF IPuLLboxes lEA 118" Stop Bar ILF 0.35 0 0 0 385 6.6 42 60 370 17' 168 17 898 10 3~ 54,051.00 S6.60 50.10 $5.00 S1.05 S63.00 51.00 S3.00 S16.00 S24.00 521.00 521.00 S3.00 S5.O0 S1,&17'.85 50.00 S0.00 50.00 S404.25 5415.80 $42.00 $180.00 $5,920.00 S408.00 53,528.00 S357.00 S2,694.00 51,27'0.00 S170.00 SUBTOTAL $16,806.90 Sheet No. 13 14 15 16 17 24 25 26 27 28 DENTON TAP ROAD IMPROVEMENTS FROM S~NDY LAKE RO~D TO DENTON CREEK CHANGE ORDER NO. 2 Description Sheet Index and Summary of Quantities Paving sta. Paving sta. Paving sta. Paving sta. Paving Sta. Drainage Sta. Drainage Sta. Drainage Sra. Drainage Sta. Drainage Sta. 174+00 to 179+00 179+00 to 184+00 184+00 to 189+00 189+00 to 194+00 194+00 to 199+00 174+00 to 179+00 179+00 to 184+00 184+00 to 189+00 189+00 to 194+00 194+00 to 199+00 Revision No. 5 3 2 3 4 4 4 3 4 5 6 ' GINN, INC. Conlultln~ En~lneert 17103 Preston Road Suite 100. LB-II8 DALLAS. TEXAS 75248 (2].4) 248-4900 NE/ARE SENDING YOU/~Attached Shop drawings Copy of letter n Prints ~l~Plans [] Samples [] Change order / [] the following Items: [] Specifications COPIES DATE NO.DESCRIPTION v'G,~/~?~"~" " /~'/',~'' " /~7~~ >.~.'. .. >~,..,,~, ~,.~ ~ ~'~ ,>,. ~,~ ,.. ,Tm,..~)~ (~- h~',: ./). ,'/h~.~ ~'~ .~. .. ~.-~.~,.~ ~,~ THESE ARE TRANSMITTED as checked below: ' ~;,:~4:~:. ~ L ' ~ For approval [] Approved as submifled [] Resubmit copies for approval :~: '" "~ FOr Y°ur use [] Approved as noted [] Submit copies for distribution :/', '.' ' [] As requested [] Returned for corrections [] Return__corrected prints ~.' ;:. [] For review and comment [] *?~'~'i:" '" [] FOR BIDS DUE 19 [] PRINTS RETURNED AFTER LOAN TO US .~:~?/,r,~,> ~,/.~','-~.,,'~,~,,,,.4~ /.:'.-~,'~,',.,,,,,~ ~T~.'.,,~.~,,,,,./x.,.,,.,/,,,~.,.,,,.,~".j, .' I'~ 1 ~11~¥ f:~f:d:[!='l"Ot~ ROAD S[.II'FE 100~ Ll:~-"ll~ DAI..LA?, 'i'E7 X AS 25248 TO I)ENF£}N ,,~,,.t'-. ~}IP,II'i TFIF: *,1 ~ OF CI3F'PE'.'LI.. bJlI.L ~bRk. E TO THE F'OLLONIN~: 1) (Iii:; YOU 5::I'AI"EI) IN '/OUF~ t...E'FI-ER. 1HIS CHANOE ORDER INCRE:ASES TI. la SCOPE i}F WORK. TFtAT INCREASED SCOPE OF WORK IS AN '(fICF~f:ASE ('iF :.'.&~.,%, C(~LCULA'I"ED }~y ES'IIHA'FED DOLLAR VtT)L.UME~ LISI'E9 ON THE FACE (:IF THE CHANGE ORDEIk. FOR THIS INt:IRf::ASED SCi)f:'E OF NORK I.. [I. LACY NEJEDS 10 CALENDAF] DAYS ADDED TO Il.iF:: C()NI'FiACT 'I'IHE. 1TI[S !Nf::F~EA,t:?,~:I) []COPE I]F WORK ALSO CHANOES THE SCOPE O~7 WORK [':Ll['~ "IHK [_.. H. I.ACY COMF"ANY. CJI.JR INITIAL BID PRICE FI'IF: l'l'E:~q :~:~(/). :1 i8" C1:}14C. PAVEHE'NT 3000 F'SI) IS BaSEl) ON A [~(4-FJ.[J [.:ii: HACHINE WORK TO HAND NOR}(. THIS RATIO HAS Fd':FECIFI,, AI:'I:'[:]~:OIP~I'~Ly, Al'Il} L,. FI. LACY NEEDS AD[)II'IONAL., [If~ A UNIT PRICE 01:" ~I.&.~>B)C3Y~ FOR THE 145~, SY ..... t ELI.,.~ )"Fils ~.', FAIR, AND EQUITABL.E ']:¢:;,"d'~Li[.[~F.'!'l[ l:'r~F AL.I. F-'Ai~TIES INVOLVI:D. ]:g ~,JE CAN AOREI: ON .,I i ..... E '.' " L. H. Lacy Company General Contractors 214/357-0146 "Quality Conslruction fo; over 65 Years" RESF'ECI'FIJLL. y SIJBM I'1"[ ED ~ DAVID M. qI',I(IJER~ F'ROJ ECl MANAGER 10888 Shady Trail P:O. Box 541297 Dallas, Texas 75354-1297 GINN, INC. CONSULTING ENGINEERS March 17, 1989 Mr. David M. Snyder, P.E. L. H. Lacy Company P.O. Box 541297 Dallas, Texas 75354-1297 Re: Denton Tap Road Improvements Creek - Change Order No. from Sandy 2 - Revised. Lake Road to Denton Dear Mr. Snyder: We are enclosing six (6) copies of Revised Change Order No. 2 to the subject Contract. This Change Order No. 2 increases the scope of work of the subject Contract to include the construction of the following: ae One southbound left turn lane at at Station 178+17.77. Be One northbound left turn lane Station 182+44. One northbound left turn lane Station 186+98. One northbound and one southbound left median opening at Station 195+28. De E. The west turnout of Parkway Boulevard. This work is to be accomplished in accordance with the transmitted to you on January 17, 1989, list attached, the median opening located and a median opening at and a median opening at turn lane and a Drawings and the in this Contract specifications. Payment for the work included Change Order No. 2 for items A. through E., above, shall be in accordance with the Unit Prices in the Contract, with the exception of Pay Item 360.1, for items A. through D. above. We concur with your letter of February 27, 1989, copy attached, that the existing Contract Unit Price for Item 360.1 - 8" Concrete Pavement (3000 PSI) should apply to the work included in the original scope of work of the Contract and the left turn lanes and median openings added to the project by this Change Order No. 2 which would be slip-formed. Therefor, we propose the establishment of a new Pay Item, No. 360.6, 8" Concrete Pavement (3000 PSI) (For Additional Left Turn Lanes and Median Openings placed by other than slip-form paving machines), at the Unit Price proposed in your letter of February 27, 1989 of $ 16.68 per Square Yard (measured in place). Pay Item No. 360.6 shall only apply to construction of the left turn lanes and median openings, included in items A. through D. above, by methods other than slip-form. 17103 Preston Road · Suite 100 · LB II8 · Dallas, Texas 75248 · Phone 214/248-4900 In preparation of the estimated construction costs accompanying the subject Change Order, we have used the price for proposed Pay Item No. 360.6. This sets the anticipated upper limit of costs associated with this Change Order No. 2. If some of the work included herein is done by the slip-form method the lower price for Pay Item 360.1 will be applied and the total construction cost associated with this Change Order No. 2 will be reduced accordingly. As we have previously discussed, the work included this Change Order No. 2 shall not be allowed to proceed until the City of Coppell has received the financial commitments pledged by the property owners who have requested these additional median openings and left turn lanes. Therefore, we will notify you of the City Council approval or disapproval of this Change Order as soon as possible after the Council meeting at which it is considered; and we will notify you to proceed with the work once the adjacent property owners fulfill their financial obligations with the City. This revised Change Order No. 2 shall also include the addition of 10 calendar days to the Contract time to allow for the construction of items A. through E. above. If you are in agreement with the terms of this Change Order No. 2, please execute all six copies and return them to this office. We must require your response to this proposed Change Order No. 2 by Monday, April 3, 1989 in order to have it placed on the agenda for the April 11, 1989 City Council meeting. Once approved by the City, we will return two copies with original signatures to you. Please call me if you have any questions. Sincerely, John C. Karlsruher, P.E. Project Engineer enclosures cc: H. Wayne Ginn, P.E. Russell Doyle, P.E. Randy Fleming File J - 379 a:lhlco2n2 GINN, INC. CONSULTING ENGINEERS November 9, 1988 Mr. Russell Doyle, P.E. City Engineer city of Coppell P.O. Box 478 Coppell, Texas 75019 Re: Denton Tap Road Improvements from Sandy Lake Road to Denton Creek - ABQ Median Opening Request Dear Mr. Doyle: This letter is in response to your letter concerning the above. The design of the requested median opening north of Parkway Blvd. can be included in the scope of our work covering overall design of the project, and therefore you will not have to go through the work authorization process. The procedure for accomplishing this is as follows: Obtain a letter of Financial Commitment from ABQ Development Company stating that they will pay for the Engineering, Testing, Inspection, and Construction of the Median Opening. This letter should state that they will deposit the funds with the City within 5 days after the City Council approves a Change Order covering the construction of the Median Opening. Upon receipt of the above letter of Financial Commitment, you can authorize Ginn, Inc. to prepare a Change Order for city Council consideration. We have enclosed cost estimates for the Change Order and additional engineering costs. We are prepared to seek the Contractor's approval of the necessary Change Order, and revise the drawings accordingly upon receipt of your authorization. We have also enclosed a letter of response for your signature on city of Coppell letterhead to Jerry Parche' Consulting Engineers which covers the above. Please call me if you have any questions. Si%e~?Y' // H. Wayne Gi~n, P.E. enclosures cc: John C. Karlsruher, P.E. 17103 Preston Road ® Suite 100 · LB 118 · Dallas. Texas 75248 · Phone 2141248-4900