Loading...
ST8201-AG 880614 (3)SUBMISSION DEAD%INE: 5:00 p.m. Monday Rev.~ Effective 1/20/88 I. REF/FILE NUMBER - 8 Days Preceding City Council Meeting AGENDA REQUEST FORM FOR CITY COUNCIL MEETING: June 14, 1988 : 378 II. ITEM CAPTION : Discussion and consideration of approval of an aqreement with St. Louis Southwestern Railway Company for the construction of a new rubberized railroad crossinq ~ Denton TaD Road complete with siqnals and~automati~ gate arms: and authQ~i~inq the Mayor to siqn. III. ACTION RECOMb~ENDED: Approval of ~qreement IV. REP. IN ATTENDANCE A: STAFF - B: OTHER - V. NOTIFICATION TO : Ginn, Inc. VI. METHOD OF CONTACT : DATE : FINANCIAL REVIEW : 1. BUDGETED ITEM 2. BUDGET AMOUNT 3. ESTIMATED AMOUNT FOR THIS ITEM 4. AMOUNT OVER OR UNDER BUDGET 5. LOW BIDDER RECOMMENDED SOURCE OF FUNDING CO'S OR BONDS FUNDS (Series or year authorized) OPERATING BUDGET (Account Number) OTHER : yy YES : $206,000.00 NO : $205,709.00 : $ 291.00 : N/A YES N/A NO : CO'S : ]987 AGENDA REQUEST FORM DMEMOI APPROVED BY CITY MANAGER : ITEM NUMBER t~ Mr. John C. Karlsruher Ginn, Inc. Consulting Engineers 17103 Preston Road Suite 100, LB 118 Dallas, Texas 75248 Re: SALLINGER, NICHOLS, JACKSON, KIRK & DILLARD {Formerly S~ner. J&ck, $~l/ng~ & Nichols{ Dallas. Texu 75201 (214~ 954-3333 Facsimile 1214) 954-3334 June 3, 1988 Denton Tap Road Improvement from Belt Line Road to Sandy Lake Road Our File No. 232 Dear John: Pursuant to your transmittal letter of May 25, I have reviewed the Street or Highway Easement to be granted by St. Louis Southwest Railway Corporation to the city in connection with the widening of Denton Tap Road where it crosses the railroad line. This is the railroad's standard Street or Highway Easement which grants the city the right to eanstruct, reconstruet, and maintain the highway across the railroad property subject to the railroad's usual provisions heavily weighted in the railroad's favor. The easement appears to be in proper form, and I approve it as such. I should point out to the city that Sections 12 through 16 of the "Insert" provide that the railroad will install the crossing signals at the expense of the city, which has been estimated at $205,709.00. Also, Section 6 requires that any (city) contractor performing work on the property shall exeeute the railroad's standard form of contractor's agreement prior to commencement of any work on the railroad's premises. If you have any further questions, please do not hesitate to give me a call. Very truly yours, SALLINGER, NICHOLS, JACKSON, KIRK & DILLARD LWJ/sb ce: Mr. Alan D. Ratliff City Manager City of Coppell P. O. Box 478 Coppell, Texas 75019 By Lawrence W. Jackson APPROVED AS TO FORM BY GENERAL COUNSEL MASCH 15. 1973 C.$.7362 STREET OR HIGHWAY EASEMENT ST. LOUIS SOUTHWESTERN RAILWAY CORPORATION, a Missouri corporation, CITY OF COPPELL, a municipal corporation of address: City Hall, Coppell, Texas, the . 19 . by and between herein called "Railroad", and State of Texas, berein called "Grantee": 1. That Railroad hereby grants to Grantee the right to construct, reconstruct, maintain and use a street or highway. hereinafter termed "highway". upon and across the real property described on the attached Exhibit "A". 2. The rights herein granted are expressly limited vertically and shall not extend beyond a plane parallel with and twenty (20) feet above the roadway surface of the highway as originally constructed, except that 'lighting fixtures and simi- lot highway appurtenances may extend above said plane, provided that any such facilities will be removed or rearranged within thirty (30) days after notification from Railroad that such facilities interfere with Railroad's intended use of the space above said plane. 3. This grant is subject and subordinate to the prior right of Railroad, its successors and assigns, to use all the pro- petty described in the performance of its duty as a common carrier, and there is reserved unto Railroad. its successors and assigns, the right to construct, reconstruct, maintain, use and remove existing and future transportation, communication. power and pipeline facilities in. upon, over, under, across or along said property. In the event Railroad trackage facilities are removed from said property, Railroad shall not be obligated to make any change in the grade of said highway, nor shall such removal affect Railroad's title to the underlying property. This grant is su. bJect to all licenses, leases, easements, restrictions, conditions, covenants, encumbrances, liens and claims of title which may affect said property, and the word "grant" shall not be construed as a covenant against the existence thereof. 4. The rights herein granted shall lapse and become void if the construction or reconstruction of said highway is not commenced within two (2) years from the date first herein written. 5. This grant shall not be construed as conveying or otherwise vesting in Grantee the right to install or to authorize the installation of any ditches, pipes, drains, sewer or underground structures, or the facilities of any telegraph, telephone or electrie power lines in. upon, over. under, across or along said property, except as necessary for maintenance of said highway. 6. Grantee shall obtain any necessary governmental authority to construct, reconstruct, maintain and use said highway. Any contractor performing work on the property herein described shall execute Railroad's standard form of contractor's agreement prior to commencing any work on Railroad's premises. 7. Except as herein otherwise provided. Grantee shall bear the entire expense of constructing, reconstructing and main- taining said highway. The crossing of said highway over any tracks of Railroad shall be constructed and maintained at the grade of said tracks now or hereafter existing. After the construction or reconstruction of said highway has been completed, Railroad shall maintain the surface of that portion of said highway between lines two (2) feet outside the rails of each uaek lacat.-,d thereon. Should Railroad abandon tracks leading to said highway. Railroad may abandon its rails, ties and appurte- nant materials and leave same in place. In such event, Railroad shall not be liable for maintenance of the portion of said highway specified above. , 8. As part consideration herefor, Grantee agrees to pay Railroad an amount equal to all assessments levied by any lawful body against the property of Railroad to defray any part of the expense incurred in connection with the construction or reconstruction of said highway commenced within two (9) years from the date first herein written. 9. Should Grantee at any time abandon the use of said property or any part thereof, or fail to use the same for said purpose for a continuous period of one (1) year, the rights granted shall cease to the extent of the use so abandoned or discontinued, and Railroad shall at once have the right, in addition to hut not in qualification of the rights hereinabove re. served, to resume exclusive possession of said property or the part, thereof the use of which is so discontinued or abandoned. Upon termination of the rights hereby granted. Grantee agrees to remove said highway, including the paving, from said property of Railroad. to restore said property as nearly as practicable to the same state and condition in which it existed prior to construction of said highway, and to bear the expense thereof. Should Grantee in such event fail. neglect, or refuse to so remove said highway and restore said property, such removal and restoration may be performed by Railroad at the expense of Grantee, which expense Grantee agrees to pay to Raih'oad upon demand. 10. This indenture shall inure to the benefit of and be binding upon tho successors and assigns of the parties' hereto. 11. Sections 12 to 16 inclusive on the attached insert are hereby made parts of this indenture. IN WITNESS WHEREOF, the parties hereto have caused these presents to be executed in duplicate as of the day and year first herein written. ST. LOUIS SOUTHWESTERN RAILWAY COMPANY By (Title) Attest Assistant Secretary CITY OF COPPELL By ~\ M~y~r By Clerk I~sERT DENTON TAP RoADw CROSSING TCC-608-34 cITY OF COPPKLLw TEX~S tee, shall furnish the 12- Railroad~ at the expense of Gran _ L_~ n rform the lab'dr, materialS, tools and equipment and snax~ necessary lashing light grau ' following work: -Be crossing signals wl~h · have additional ~._~ four (4) f ,~ ~ which w~ll .... ~ h necessary automatic ga~e ~'on cantelever uS"'~m~ate instrumenu ~{aht units moUnu=~=__ m'rcuitS and a~-- · " --= ' -"d ooeraU~,,~ _x . -~rred to as -sxgn~lS .' after collect%Ve{~.~'~e located apprOxlmaEely actuating ~" housing, hereln Caid signalS muT~-_ ~n~ 87-9825, dated . as shown on =-= ~l---~d and made a.par~_V~ be in acCordanCe of and ali m~- standards- such installation shall with Railroad'S usual include removal of existing warning deviceS: xisting crossing surface: (b) remove e 'a- of rail and tles: and · cluding rea ~ ' (c} prepare tracks in ~ -he existing and widened P - ~-nad for one h . ~:__ materials and ---es to reimburs~ ~a'~ilroad in furn~sn~t~mated amount Grantee a9~ · urreo uy ~- · - ~2. The ~ _.a exoenae xnc . ~4o sectlO,, * ~ -~ Five Thousa-~ of the ~osu ~"~wor~ specified in ~"~,,nder is Two Runor=~ performing rue --~lroad by City net?- reimbursable t°.~_~rs ($205,709}- - Seven Hundred Nxne Railroad will order :~ is instrument, ...... ~ ntemplated in execut~un of t~__a to perform un= of 3. Follow g . ~_ ,enU~=~ .-~.. ne=u 1 ~ ~11 materla~ - =_ = h{ 1 for exg~z the delivery o=_-- hm~t tO Grante= ~ __1 ' ls to be furnished by · - ~ of the estimate9 c°~-~l~a~r the herein and sna~ ~antee'S mh~re ~e crOss%ng ~u ~ - .~ -ubmit to Grange= ---T d. As soon as u,, ~n Railroad s~a~.~.~^ o~timated cost o~.~ Rallr~ . ~laced in operau~, .e,e'S share o= %-= -51~letiOn of audlu, have ~ee~ ~o~cent (80%) oz ur~-7~__ad' Following ~u'"~ual total cost coat, the differe d Railroad hereunder shal~ be ~^ ~e nerforme by -vailable followzng . 14. The work ~.~_[ =-d materials are a. ._~ ,~{thin one (1) year ~s soon as laDu~ ~- ~ ~h-ll be comple~u commenced ~f this instrument an~ - execution thereafter- fter installation of said signals has been completed, Railroad .~5. .a_ .-- . ..... 10n- as they remain in place. If feg~r~} funds, shall ma}~=aln ~T~_~ ~.,-d~. f6r maintenance become available, or.~ny 9tn~r,~o~~.~-~2'~o ~xtent of such availability. 16. The parties intend that the promises and obligations of this indenture shall constitute covenants running with the land so as to bind and benefit their respective successors and assigns. , l I !, ?' ~ / j " ,'; I , - 'J ;~P~o. 85'x~"RCP- ~ Others R~t,re Ex,si Ftasner lL,gnl~ ~ ,i ~Pro. F~a~her L~gn,s ~ ~o.. .I . , .. .. ~ ,' ,' /' -- .. . / ~,,.,,.,.., (.,, -- ~, '/ / ,' M ~ / / Railway C~ ; - COPPEL L~ TEX4S J ~ / Proposed Improvements To Denton Tep Rood May 6, 1988 84344 Mr. Lou Duggen Mayor City of Coppell P. O. Box 478 Coppell, TX 75019 Dear Mr. Duggen: Attached are duplicate counterparts of proposed agreement in connection with the proposed widening of Denton Tap Road in Coppell. Please arrange for execution on behalf of the City and return both counterparts to this office for our further handlini. You should also attach a certified copy of resolution passed by the governing body of the City authorizin§ execution and acceptance of the document. Yours truly, R. R. McClanahan Superintendent AS/sis Attach. September 15, 1987 Mr. D.R. Andrews, Field Engineer St. Louis Southwestern Railway Company 7600 S. Central Expressway Dallas, TX 75216 Re: Proposed rubber crossing and signals at Denton Tap Road Coppell, TX Dear Mr. Andrews: On behalf of the City of Coppell, we have reviewed the detailed cost estimate you prepared for the subject railroad crossing. It is our understanding that these costs are typical for this type of installation in this area. Please prepare the appropriate formal agreements so that we may present them to the City Council for final approval. Sincerely, ~/ . HWG/dsp cc: Alan D. Ratliff w/attachments John C. Karlsruher Kevin Peiffer Frank Trando w/attachments .J-335 Engineering Department August 26, 1987 254 - 372-7460 Mr. John C. Karlsruher Project Engineer Ginn, Inc. 17103 Preston Road Suite 100 Dallas, Texas 75248 Dear Mr. Karlsruher: Attached is a copy of the detailed estimate for installing a rubber crossing and signals at Denton Tap Road in Coppell. Total estimated cost of the project is $205,709. Please advise if the City is agreeable to reimbursing cost of project. If so, we will arrange for formal approval and prepare an appropriate agree- ment to cover. DRA:krs Attachment Yours truly, D. R. Andrews Field Engineer PAGE IOF7 oEkq'ON DATA I]ENTONI ~ OETRIL OF ESTII~YIE STATION SLI~ECI ll'f"f~ I]ENTON TAP ROAD ORAWINO 87-9~ DATED 4-10-87 EIN I]ESI:RIPTION LIN QUANTITY LABOR ~TERI~L 9a, l LV ~ VD 88001/681 LT -1.000 0 0 CONTI~IE$ -1.000 0 0 *TOTAL EIN ?~! OqEOIT INVESTI~N 0 0 0 0 REtIRE)lENT ~42 LV PER VI) 88001/681 LT 1.000 0 0 CONTINOENCIES 1.000 0 0 *TOTAL EIN 9~2 0 0 DE~IT RC~RUED DEPR 0 0 622 C.S. F-30 ~ 08112/87 1:-30 II FILE I E-0~i41323-2(C~) DI~Aq PI~ BLUFF OTH-COST N-CASH TOTAL EIN TOTAL CASH -lO0 -100 -lO0 0 -10 -10 -10 0 -110 -110 -110 0 -110 -110 -110 0 100 100 100 0 10 10 10 0 110 110 110 0 110 110 150 0 RECl]LLECTIi{LR CROSS TIES 7X9X9 EA 78.000 0 1625 0 0 1625 1625 INSTALL ~ TIES TF 142.0e0 562 0 168 54 730 67& 1RRVEL TII~ E I'R/~IC ~ LT 1,000 112 0 144 78 256 178 ENOI~I~tlNO CT 1.000 46 0 6 0 52 52 AOOITI~E 8~.88Z (CITY/II~) 1.000 0 0 6J,8 0 M8 648 IfIL-ADO 8 ~ FRE-9°T !.000 0 0 130 130 130 0 ~IL-ADO 67. ~ 1.000 0 0 97 0 97 97 CI]NTINOE~IE$ 1.000 0 0 354 26 354 328 *TOTAL EIN 622 720 1625 1547 288 3892 3604 624 NEt{ RRIL NT 8.840 0 4663 0 0 4663 4663 ~ ~ ER 4.000 0 169 0 0 169 169 INST{{.L RAIL TF 195.000 482 0 144 46 626 580 TRAVAil. TIHE E TRAGIC DEL LT 1.OEO 97 0 1~5 67 222 155 ENOII~I~INO LT 1.000 41 0 5 0 46 46 ADDITItE 89.88Z (CITY/I~)) 1.000 0 0 ~8 0 558 558 I~L-ADD 8 Z FI~-SPT 1.000 0 0 3~6 3e6 L~ 0 HTL-AI)D ~Z FFRE 1.04)0 0 0 289 0 289 289 O]NTINGENCIES 1.000 0 0 ~% 50 ~% *TOTAL EIN 624 620 4832 2203 ~9 7655 7106 PA6E 20F7 C.S. F-30 L~'TAIL OF ESTI~TE ~ 08/12/87 6~0 MO YR F-30I FIlE ! E-~I4/323-2(COP) STATI~ O:~='~LL ~K. ECT lh~0~ 0ENI'~ T~° ROAD TCC-60~.3q EIN DESCRIPTION -. UN QUAE[I1Y lABOR I~Tl~l~. OTH-COST N-CASH TOTAL EIN TOTAL CA,94 629 Finn ~ EA 4.0~ 420 260 0 ~0 ~0 600 TRA~'L TI~ ~ TPd~cFIC I]EL LT 1.000 84 0 108 58 1~2 134 EM~II~'ERI~ LT 1.000 35 0 4 0 39 39 ~DITI9~ 89.867. (ClIY/INI)) l.O~O 0 0 485 0 485 485 Ifll.-Al~ 8 Z F~-SPT 1,000 0 0 20 20 20 0 ~ll.-AOl) 61 ~ l.OOO 0 0 15 0 1~ 15 C~NTII~ENCIES 1.000 0 0 143 16 143 127 eTOTAL EIN 629 539 260 775 174 1~/4 1400 (~n3 ~ NI 121.000 0 635 0 0 635 635 · INST~LL BALLAST LT I,(XX) 2~1 0 84 27 365 3~ ~ TI~E ~ TI~:FIC ~ U 1.00~ 56 0 72 39 12~ 89 DI~IM~ERII~ LT 1.000 24 0 3 0 27 27 AIIIITIVE 89.88Z (CIIY/II~) 1.000 0 0 325 0 3'25 325 ~ll.-AO0 8 Z F1~-SF1' 1.000 0 0 50 50 50 0 ~I1.-AI)D 6Z ~ I.O(X) 0 0 38 0 38 38 C~NTIN~ENCIES I.(X)O 0 0 157 11 157 146 *TOTAL EIN 63~ 635 7~ 1~ 17~ 15~ N Cetl:~IIISE ,ITS PR 4,000 0 900 0 0 900 ~ K~ O1H LT 1.000 0 1887 0 0 1~7 1687 INSTALl. OIH IF 195.000 2~ 0 8~ 28 375 347 ll~AVEL ll~ ~ ~IC I]EI. LT 1.0~ 58 0 74 40 132 92 EN~II~ERI~ LT I.O(X) 2~ 0 3 0 27 27 AI~ITI~ 89.88Z (CIIY/I~) 1.000 0 0 3~4 0 334 33~ 1111.-AI)D8 Z FRE-SPT 1,00~ 0 0 207 207 207 0 {~I.-ADB 6Z FT~ 1.000 0 0 l~ 0 155 155 CONTINGENCI£$ 1.000 0 0 382 27 382 355 *TOTAl. EIN 634 371 2587 1241 302 4199 3897 ~1 ii, BASE HI1. SELECT-IN PL CY 27.000 ENGII'~rERIN6 LT 1.000 ADDITI~ 8~.88Z (CITY/II, A)) 1.000 CONHN~ENCIES 1.000 0 0 405 0 405 405 28 0 3 0 31 31 0 0 26 0 26 26 0 0 46 0 46 46 *TOT~ EIN 6~1 28 0 480 0 50~ 508 PAGE 3~7 STATION IJETAIL OF ESTIRA1T~ C.S. F-20 ~ 08/12/8'/ F-30 I FILE ! E-OSI41323-2(Cl)P) MVN PINE BLUFF LABOR 0 0 2120 0 2120 2120 0 423 0 0 423 423 0 8~4 0 0 8~4 8~4 7~ 0 102 55 ISI 126 144 0 153 lOl 297 196 45 0 58 31 103 72 40 0 5 0 45 45 . 0 0 277 0 277 277 0 0 105 105 105 0 0 0 79 0 79 0 0 452 2~ 452 423 · TOI'AL EIN ~2 1317 3351 321 4976 0 21726 0 0 21726 21726 1054 0 1354 734 2406 1674 237~ 0 3057 165'/ 5436 3779 123 0 159 86 282 196 323 0 97 33 420 387 776 0 9~/ ~ 1773 1233 326 0 44 I 370 369 0 0 4480 0 4480 4480 0 0 1738 1738 1738 0 0 0 1303 0 1303 130:3 0 0 3994 479 3994 3515 · TOT~L EIN 643 I)~IT I~LLECTIBLE ($702~ CA~ ~.) 4c~1 21726 17223 5268 43930 38662 7r28 329~ 27549 7029 68459 61430 RAIL ~ 5.525 ~ 011ER 11~ lfn. NT 1.694 SO~P TIES EA 78.000 0 441 0 441 441 0 0 93 0 93 93 0 0 78 0 78 78 0 *TOT~ EIN 948 I)EI)ITIIOR 0 612 0 612 612 0 0 612 0 612 612 0 PA6E 40:7 STATI~ ~ EIN I~Ee~IPTION P~IL SCR~ OILER 1RK HTL TIES *TOTN. EIN 947 I~EDIT OPE]~TING I]ETAIL OF ESTIHAIE SUB,ECT II, ROVE DENY~I TAP ROAD TCC-~.34 C.S. F-30 I~ 08/12/8'/ F-30 ! FILE ! E-OSI4/323-2(C~P) DIVN PII~ B.IFF 0 -612 0 -612 -612 0 0 -6t2 0 -612 -612 0 ~ QUI~TI~ ~90R I~111~I~ OTH-.COST ~ TOT~ EIN TOTAL CASH NT -5.52'5 0 -441 0 -441 -~l 0 NT -l.6?q 0 -~ 0 -~ -~3 0 ER -78.000 0 -78 0 -78 -78 0 DETAIL OF ESTIMATE SUMMARY BY LiNE NUMBERS FORM 30 NUMBER: OMO MO YR 05/lg/87 C.S. F-30 MKK FILE # E DIVN. PINE BLUFF MILEPOST TCC-608.34 STATION: COPPELL SUBJECT: INSTALL CROSSING UARNING SYSTEM AT DENTON TAP ROAD MATERIAL GATE MECH U/ARM UP TO FLASHING LIGHT SIGNAL ONE UAY FLASHER SIGNAL FOUNDATION STUB HAST, BASE ASSEMBLY CANT FLASHING LIGHT SIGNAL CANT SiO FOUNDATION FOR UP TO HXP-1 UITH ISLAND *CTU-I MODEL $ SURGE SUPPRESSORS LIGHTING TRANSFORMER BATT. STORAGE, (240 AMP HOUR AUTOMATIC RECTIFIER (40 AMP) POUER PANEL U/BREAKER & OF! RELAY HOUSING (81") ELY HOUSING FOUNDATION PIERS FOR PLUG-IN LiNE RELAY PLUG-IN HD LiNE RELAY PLUG-IN POUER OFF RELAY PLUG-iN FLASHER RELAY INSULATED BONDSTRAND CONDUIT & FiTTiNGS 1 COND # & I COND fl !0 SHOP MATERIAL AC SERVICE MATERIAL RISC SIGNAL MATERXAL IND ARM ET" ARM CELLS) CASE EA EA EA LT I EA EA I EA 1 EA 1 EA EA S EA 4 EA EA FT 600 FT 360 FT 8EO0 FT 49E0 LT 1 LT LT I 11600 O0 1350 O0 400 O0 630 O0 9140 O0 1000 O0 1298S.00 79S.00 800.00 960.00 1085.00 565.00 50.00 16E5.00 160 O0 2EO0 O0 ER40 O0 860 O0 890 O0 600 O0 2340 O0 2215.00 640.00 225.00 750.00 1685.00 TOTAL AMOUNT FOR MATERIALS $ 57790.00 LABOR COSTS ELECTRICAL LABOR SIGNAL LABOR SIGNAL SHOP LABOR TRAVEL EXPENSE $ 7~0.00 $ 14330.00 $ ITEO.O0 $ 4775.00 TOTAL LABOR $ E1575.00 PERSONAL EXPENSES $ 8790.00 PAGE ~ OF7 DETAIL OF ESTIMATE SUM.ARY BY LINE NUMBERS FORM 30 NUMBER: CMO MO YR 0S/1S/87 C.S. F-30 MKK FILE # E 0814/323-~(COP) DIVN. PINE BLUFF MILEPOST TCC-608.34 STATION: COPPELL SUBJECT: INSTALL CROSSING WARNING SYSTEM AT DENTON TAP ROAD ADDITIVES EIN DESCRIPTION SUB TOTAl* LABOR MATERIAL OTHER ~157S 57790 8790 EQUIPMENT RENTAL FREIGHT PRELIMINARY ENGINEERING ADDITIVES CONTINGENCIES SIGNAL WORK 7S50 NC 1890 ~SO0 ~h ('21910'- ~440 S780 '-42'90 ~681S 63570 4716S DEBIT RECOLLECTIBLE 137550 CASH CREDIT ~080 DETAIL OF ESTIMATE SUMMARY BY LINE NUMBERS FORM 30 NUMBER: GMO MO YR 0S/15/87 C.S. F-30 MKK FILE REF. E 0814/3~3-2(C0: DIVN. PINE BLUFF MILEPOST TCC-608.34 STATION: SUBJECT: SALVAGE COPPELL INSTALL CROSSING WARNING SYSTEM AT DENTON TAP ROAD EIN 948 947 DESCRIPTION MISC SIGNAL MATERIAL DEBIT MATERIAL ON HAND C~£H) CR RECOLLECTIBLE LABOR MATERIAL OTHER 3OO 3OO 3OO RETIREMENT EIN 943 941 DESCRIPTION LEDGER VALUE PER VD CONTINGENCIES DEBIT ACCRUED DEPRN CR R&E 8908~ LABOR MATERIAL OTHER ~S53 ~808 ~808