ST8201-CS 900307GINN, INC. CONSULTING ENGINEERS Line Road to Sandy March 7, 1990 Re~'~enton Tap Road Improvem?~s from Belt ~ke Road - Final Punched,st Dear Mr. Belch: We are transmitting herewith the final punch lists developed from our final inspections of the project over the past couple of weeks. Included with the punch list items noted by myself in your presence are the items noted by the City personnel which have been left in the punch list form in which I received them. There may be some redundancies in the lists. Please correct the items indicated on each list. Ail work is to be accomplished at the expense of L. H. Lacy Co. in accordance with the Contract. Once you have completed work on these items please call me in order that we may be able to verify compliance as soon as possible without unduly delaying final acceptance of the project. Call me if you have any questions. Sincerely, John (2. Karlsruher, P.E. Project Engineer enclosures cc: H. Wayne Ginn, P.E. Steve~Gor~m - w/enclosure Richard Diano - w/enclosure Dana Kemp - w/enclosure J. R. Richardson - w/enclosure 17103 P,t!sion Road · Sui(c I00 · I,IIII8 · Dallas, Texas 75248 ® Phonc 214/248-4900 FINAL INSPECTION PUNCH LIST PROJECT: Denton Tap Road Improvements from Belt Line Road to Sandy Lake Road, Coppell, Texas DATE OF FINAL INSPECTION: February 19, 1990 - Paving, Drainage & Storm Sewer ATTENDEES: Richard Diano, City of Coppell Parks Dept. Ted Dutt, City of Coppell Water Dept. Brent Adams, City of Coppell Street Dept. David Lamberson, city of Coppell Water Dept. Dana Kamp, City of Coppell Street Dept. John C. Karlsruher, P.E., Ginn, Inc. Scott Balch, P.E., L.H. Lacy Company Station 89+12.85 to Railroad Crossing: North bound lanes: 5. 6. 7. 9. 10. Station 89+82 - seal construction joint General Note For Entire project: Re-seal all redwood headers, expansion and construction joints. Remove mortar slag from the throat of the inlet at Station 90+00. Median nose at Station 90+95.03 - clean and seal the construction joint between the back of curb and the median nose pavement. General Note for Entire project: Clean and seal joints between the back of curb and median pavement on all median noses. Remove all construction debris (including nails, l~mher, tie wire and etc.) from the median noses and clean and sweep them. Median nose at Station 91+55.03 - clean and seal joint between back of curb and median nose pavement and rout and seal random crack. Clean and seal redwood joint at Station 91+77.71. Median nose at Station 94+72.32 - clean and seal construction joint. Railroad Marking "R's" are too small, 5'-0" tall vs. 6'-0" required by the 1988 Edition of the Manual on Uniform Traffic Control Devices. Markings must be replaced accordingly. Median nose at Station 94+95.00 - clean and seal joint between back of curb and median nose pavement and rout and seal random crack. General Note for Entire project: Paint all valve covers and mark adjacent curb for location purposes. Median nose at Station 95+55.00 - clean and seal joint between back of curb and median nose pavement and rout and seal random crack. Page 1 11. First four concrete panels south of the Railroad Crossing have poor texture in the outside two lanes. 12. Adjust grade of pull box located at Station 97+05. 13. Inlet at Station 91+64.70 - cover has no locking mechanism. Mark as No.1 with paint and install locking mechanism. 14. Electric pull box at Station 89+15 needs more gravel. Railroad Crossing to Grapevine Creek Bridge: South bound lanes (from bridge to RR): 1. Correct drainage "bird bath" in outside lane gutter of south bridge approach slab. 2. General cleanup, painting of valve covers needed. Clean and seal pavement joint at bridge approach slab Station 114+23.77. 3. Correct drainage "bird bath" in outside lane gutter approx. Sta. 113+75. 4. Sag inlet at Station 111+85.54 - Replace defective manhole cover. 5. Median nose at Station 110+99.41 clean and seal joint between back of curb and median nose pavement and rout and seal random crack. 6. "X" inlet at Station 110+86.4 - cover is stuck. Repair cover and hole in the interior of the north wall. 7. Light grading required on the Baptist Foundation property to to redistribute stormwater runoff. 8. "X" inlet at Station 110+52.4 clean out construction debris. 9. Traffic pull box at Station 109+05.00 - bolt hole is broken. Repair bolt hole or replace pull box. 10. Double 10' inlet at Sta. 108+50 - remove construction debris and clean interior. Remove mortar slag from throat. 11. Median nose at Station 105+24.5 - clean and seal the construction joint between the back of curb and the median nose pavement. 12. Median nose at Station 104+64.5 - clean and seal the construction joint between the back of curb and the median nose pavement. 13. Double 10' inlet at Sta. 103+75.00 - clean out waste concrete. 14. Traffic pull box at Station 102+90.00 - bolt hole is broken. Repair bolt hole or replace pull box. 15. North bound ].eft turn lane to Baptist Foundation - epoxy did not harden under jiggle bar tiles - remove and replace jiggle bar tiles with proper mixture of epoxy. 16. Median nose at Station 101+17.00 - clean and seal joint between back of curb and median nose pavement and rout and seal random crack. 17. Median nose at Station 100+57.00 - clean and seal joint between back of curb and median nose pavement and rout and seal random crack. 18. Pull boxes at Sta. 100+23 no pull strings installed. 19. Pull box at Sta. 99+05 - no pull string installed. Page 2 20. Embankment slopes at Railroad Crossing are eroding. Repair erosion damage and plant grass for erosion control. 21. Seal transverse crack on the north side of the railroad tracks in asphalt portion of the Railroad Crossing. North bound lanes (from RR to Bridge): 22. 24" culvert north of railroad is either partially obstructed, has a broken pipe, or is improperly aligned. Remove obstruction, replace pipe, or correct alignment whichever is applicable. 23. Repair erosion damage at the first driveway north of the Railroad Crossing and construct a mountable asphalt barrier which will keep water from running down the drive while allowing full access for cars and trucks. 24. Rout and seal sawcut overrun at the south driveway into Northlake Nursery, and repair the north tie-in of this drive to the curb. 25. Repair the south tie-in to the curb for the center drive for the nursery and rout and seal a random crack in the same drive. Sta. 101+98.5 26. Correct drainage "bird bath" in outside lane gutter approx. Sta. 103+90. 27. Clean and seal construction joint at south end of the bridge approach slab, Sta. 113+87.97. 28. Brick pavers on north bound side, south end of Bethel Road intersection are unacceptable and need to be reworked. 29. Correct drainage "bird bath" in outside lane gutter of south bridge approach slab. Grapevine Creek Bridge to Bethel School Road: North bound lanes (Bridge to Bethel School Road): 9. 10. Correct drainage "bird bath" in outside lane gutter of north bridge approach slab. Repair and seal construction joint at the north end of the bridge approach slab, Sta. 116+55.16. South median nose at Meadow Creek Drive intersection, Station 117+08.28 - clean and seal the construction joint between the back of curb and the median nose pavement. Pull boxes at Sta. 116+75 have no pull strings. South median nose at Meadow Creek Drive intersection, Station 117+08.28 - clean construction debris from the surface and backfill and dress the median behind the guard rail to the bridge riprap. Clean and seal the header joint at Meadow Creek Drive. Rout and seal the joint between the concrete and asphalt pavement at the east end of Meadow Creek, Sta. 2+39.08. 5' Inlet in parking lot, Meadow Creek Sta. 0+82, 38' left remove waste concrete from inlet. Sta. 118+02 no pull strings in conduit in pull box. Pull box in east side of median at Sta. 116+75 needs more gravel in the bottom and pull strings in conduits. Page 3 11. Correct drainage "bird bath" in outside lane gutter at approx. Sta. 119+02 next to south drive to Baptist Church. 12. South driveway for the Baptist Church, Sta. 119+26, needs sealing. 13. Clean and seal redwood header at Sta. 121+72.08. 14. Correct drainage "bird bath" in outside lane gutter at approx. Sta. 122+12 at south side of split driveway serving shopping center and Baptist Church. 15. Brick pavers in the north side of the double drive, Sta. 122+50 +/-, need more sand and vibrating. 16. Clean and seal redwood header at Station 122+93. 17. Repair seal on drive approach in front of Hardware Store, Sta. 124+00 +/-. 18. Inlet at Sta. 125+90 - repair manhole cover. 19. Inlet at Sta. 126+75 - clean mortar slag out of throat. Grapevine Creek Bridge to Bethel School Road= North bound lanes (Bridge to Bethel School Road): 20. South drive for the Post Office - rout and seal random crack. 21. Correct drainage "bird bath" in outside lane gutter at approx. Sta. 128+30 (just north of U.S. Post Office south driveway). 22. Repair and seal redwood header Sta. 127+90 +/-. 23. Inlet at Sta. 131+12.5 - remove waste concrete and debris and clean inside. 24. Southeast corner Bethel School Rd./Denton Tap Road - brick pavers in the Bethel School crosswalk need more sand and vibration. 25. Inlets on the south side of Bethel School Rd. - east - remove mortar slag from throats. 26. South Median nose at Bethel School Rd. intersection, Sta. 131+42.05 - clean and seal the construction joint between the back of curb and the median nose pavement and rout and seal two (2) random cracks. South bound lanes (Bethel School Rd. to bridge): 27. Pull box at southwest corner of the Bethel School Rd. intersection needs to leveled. 28. Correct drainage "bird bath" in outside lane gutter at southwest corner of Bethel School/Denton Tap intersection. 29. Correct drainage "bird bath" in outside lane gutter at approx. Sta. 131+20 at paving joint south of intersection curb return. 30. Fourth concrete pavement panel south of brick paver crosswalk has an diagonal random crack - rout and seal crack. 31. Median nose, Sta. 125+35 - clean and seal joint between back of curb and median nose pavement and rout and seal random crack. Page 4 32. Median nose, Sta. 124+75 - clean and seal joint between back of curb and median nose pavement and rout and seal random crack. 33. Inlet at Sta. 123+65 - remove waste concrete in bottom and clean. 34. Median nose at Sta. 122+62 - clean and seal joint between back of curb and median nose pavement and rout and seal random crack. 35. Median nose at Sta. 122+02 - repair curb at southwest corner and clean and seal joint between back of curb and median nose pavement and rout and seal random crack. 36. Sta. 119+90.46 - repair curb at beginning of south bound left turn lane transition in median. 37. Offsite Channel Improvements (west of Denton Tap Road on Mr. Thweatt's property) - West bank eroding above riprap. Repair erosion damage and apply erosion control. 38. Correct drainage "bird bath" in outside lane gutter at approx. Sta. 119+00 at north end of inlet blockout. 39. Correct drainage "bird bath" in outside lane gutter at approx. Sta. 118+69 at south end of inlet blockout. 40. South bound left turn lane serving Meadow Creek Drive - jiggle bar tiles have soft epoxy. Remove all jiggle bar tiles and reinstall using proper epoxy mixture. 41. Correct drainage "bird bath" in outside lane gutter at approx. Sta. 118+35. 42. South bound left turn lane serving Meadow Creek Drive - remove concrete spill in the middle of the lane divider. 43. Correct drainage "bird bath" in outside lane gutter at north bridge approach slab. Bethel School Road to Braewood Drive: North bound lanes (Bethel School Road to Braewood): (we conducted the inspection in reverse order, i.e., we inspected the north bound lanes by walking south against traffic from Braewood to Bethel School Rd. and then crossed to the south bound side and proceeded north to Braewood) 2. 3. 4. 5. 6. 7. 8. 9. Inlet at Sta. 151+25 - remove construction debris and clean out interior. Inlet at Sta. 150+17 - remove mortar slag in throat. Repair the longitudinal construction joint in the area of the temporary crossover. Correct drainage "bird bath" in outside lane gutter adjacent to power pole at approx. St. 147+30. Correct drainage "bird bath" in outside lane gutter at approx. Sta. 146+80. Inlet at Sta. 145+50 - remove mortar slag in throat. Inlet at Sta. 143+00 - holding water. Clean out interior and check lateral for blockage. Inlet at Sta. 140+50 - remove construction debris (aggregate stuck to floor) and clean interior. Correct drainage "bird bath" in outside lane gutter at approx. Sta. 140+30. Page 5 10. Inlet at Sta. 138+00 remove construction debris and clean out interior. 11. Correct drainage "bird bath" in outside lane gutter at approx. Sta. 137+83.5 at south end of inlet blockout. 12. Inlet at Sta. 137+00 - remove construction debris and clean out interior. 13. South Drive of Stop-N-Go - repair joint at back of drive. 14. Correct drainage "bird bath" in outside lane gutter at approx. Sta. 132+97 (Stop 'N Go south drive). 15. Inlet at Sta. 132+49 - remove construction debris from interior and clean. Remove mortar slag from throat. 16. Median nose at Sta. 132+26.90 - crack in nose on west side. Repair and seal crack. South bound lanes (Bethel School to Braewood): 17. Sta. 131+80 +/- rout and seal a random crack in the west bound lane of Bethel School Rd. 18. Inlet at Sta. 132+40 - remove construction debris and clean out interior. 19. Correct drainage "bird bath" in outside lane gutter at approx. Sta. 133+00 in driveway. 20. Sta. 135+70 - reset pull boxes to proper grade. 21. Drive at Sta. 136+84 +/- has random crack. Rout and seal crack. 22. Inlet at Sta. 137+18.86 - remove construction debris and clean out interior. 23. Correct drainage "bird bath" in outside lane gutter at approx. Sta. 137+45. 24. Correct drainage "bird bath" in outside lane gutter at approx. Sta. 140+42 and 140+48 adjacent to power pole. 25. Correct drainage "bird bath" in outside lane gutter at approx. Sta. 143+47 adjacent to power pole. 26. Remove spilled concrete from road surface in south bound center lane at approximate Sta. 143+80. 27. Correct drainage "bird bath" in outside lane gutter at approx. Sta. 146+30 adjacent to power pole. 28. Correct drainage "bird bath" in outside lane gutter at approx. Sta. 147+72 ± adjacent to fire hydrant. 29. Correct drainage "bird bath" in outside lane gutter at approx. Sta. 148+15. 30. Correct drainage "bird bath" in outside lane gutter at approx, sta. 148+96 adjacent to power pole. 31. Water valve in curb line Sta. 147+72 needs to be exposed for operation and painting of cover. Braewood Drive to Sandy Lake Road: South bound lanes (from Braewood to Sandy Lake Road): 1. Inlet at Sta. 153+25 - remove construction debris and clean out interior. 2. Correct drainage "bird bath" in outside lane gutter at approx. Sta. 154+49 (between drives). Page 6 McDonald's south drive - repair joint and clean up spilled concrete. McDonald's south drive - south curb broken. Repair curb. Inlet at Sta. 161+00 - remove construction debris (formwork) from inside and clean. North bound lanes (Sandy Lake Road to Braewood Dr.): 5. Inlet at Sta. 161+00 Remove mortar slag from throat and clean inside. 7. Clean and seal joint at Sta. 160+47.68. 8. Brick pavers in the north drive to Town Oaks Center (Minyard's) have sunk and must be repaired. 9. Inlet at Sta. 159+00 - Remove mortar slag from throat and clean inside. 10. Inlet at Sta. 154+72 - remove construction debris and clean out interior. Also included herein by reference are the punchlists listed as follows and attached hereto: 1. Memorandum from Dana Kamp to John Karlsruher dated 2/22/90 2. Memorandum from Richard Diano to John Karlsruher dated 2/22/90 3. Memorandum from Howard Pafford to John Karlsruher dated 2/28/90 4. Inspector's partial punch list transmitted to L. H. Lacy Co. by Randy Fleming on 1-16-90. FINAL INSPECTION PUNCH LIST FOR GRAPEVINE CREEK BRIDGE DATE OF FINAL INSPECTION: February 23, 1990 ATTENDEES: John C. Karlsruher, P.E., Ginn, Inc. J. R. Richardson, Ginn, Inc. Stan Reed, P.E., Reedcon, Inc. East Bridge Structure: 1. Remove construction debris from the areas between the ends of the beams and the abutment backwalls; and from the corresponding areas on the bents. 2. Touch up paint at the northeast corner of the north abutment barrel. 3. Touch up paint at the northeast side, north face, of the south bent. 4. Coat conduit and cap the end of the conduit at the southeast end of the east bridge rail and backfill and compact. 5. Remove lumber and construction trash from the southeast abutment. 6. Clean all construction trash from the bridge deck, sidewalks, and gutters, including, but not limited to: nails, tie-wire, concrete slag, etc. Sweep all bridge deck and sidewalk surfaces. Page 7 East Bridge Structure: (continued) 10. Clean all construction trash from the surface of all concrete riprap including the jogging trail. Sweep same areas. Clean rust stains at the light pole bases of all bridge rail columns with light poles. Repair the effects of the metal beam guard fence foundation settlement and backfill to 90% Standard Proctor Density. Repair bolted connection of the guard rail at the southeast end of the east metal beam guard fence. Bridge electrical punch list to follow under separate cover when electrical inspection is completed. West bridge structure: 2. 3. 4. 7 o 8. 9. 10. 11. 12. Remove construction debris from the areas between the ends of the beams and the abutment backwalls; and from the corresponding areas on the bents. Touch up paint on the east bridge of the north bent. Touch up paint on the west column of the south bent of the south bent. Remove steel reinforcing bars protruding from the south and west faces of the northwest abutment. 5. Repair and seal the construction joint between the riprap and wingwall at the northwest side of the northwest abutment. Seal all other riprap/wingwall and abutment joints. Clean all construction trash from the bridge deck, sidewalks, and gutters, including, but not limited to: nails, tie-wire, concrete slag, etc. Sweep all bridge deck and sidewalk surfaces. Clean all construction trash from the surface of all concrete riprap. Clean rust stains at the light pole bases of all bridge rail columns with light,poles. Repair the effects of the metal beam guard fence foundation settlement and backfill to 90% Standard Proctor Density. Backfill, grade, and compact the median area between the north ends of the bridge structures enclosed by the median metal beam guard fence. Bridge electrical punch list to follow under separate cover when electrical inspection is completed. Repair damaged concrete riprap as directed the Engineer in forthcoming drawings. FINAL INSPECTION OF THE GRAPEVINE CREEK BRIDGE LIGHTING SYSTEM DATE OF FINAL INSPECTION: March 6, 1990 ATTENDEES: John C. Karlsruher, P.E., Ginn, Inc. C.R. McCreary, P.E., C.R. McCreary & Assoc., Scott Balch, P.E., L.H. Lacy Co. Bill Brooks, sub-contractor to L.H. Lacy Co. 1. Label each circuit in breaker box. Page 8