Loading...
ST8201-CS 900222 (3)COPPELL PUBLIC WORKS HEHOR~D~H DATE; February 22, 1990 John Karlsruher, Project Manager- Ginn, Inc. Richard Diane, Park Superintendent ~ Denton Tap Punchlist These items require remedial action to make them acceptable to the City of Coppell; The slopes at A~drew Brown Park and along the right-of-way of the adjacent park property need to be cleaned of construction debris by raking it out and disposing at offsite. It is recon~ended that buffalograss seed be broadcast on these slopes as they ars too extreme for the Division's personnel to maintain. This seed can be obtained from a local source and provides a low growing cover. If funding permits application of wildflower seed could provide additional cover and aesthetics. The water meter double check boxes at Parkway Boulevard need to bo reset to existing grade. The pull box in the median nose on the east segment of Parkway also needs to be filled to curb height, crowned with the box set at grade, it appears the bricks need to be regraded due to settling. The electrical and traffic signal boxes need to be adjusted throughout the project to grade appearing to have been hit by vehicles installing the lights. . Additional compaction, filling, and grading around all light poles should take place in the medians of Denton Tap. Seeding of slopes in and around the creeks and bridges needs to be done to protect these from erosion. The Grapevine Creek area where rip rap was added should also be grassed above the rap material. The paver band at Bethel Road southbound appears to be sliding and may require additional sand. The grass in the parkways has not established and the erosion evident especially north of Sandy Lake needs to be controlled as mud enters the roadway. My recommendation is to seed the area with bermudagrass. RED/bb GRASS. RED