ST8201-CS 900813GINN, INC. CONSULTING ENGINEERS August 13, 1990 Mr. Steve Goram city of Coppell P.O. Box 478 Coppell, Texas 75019 Re: D_enton~Tgp Road Landscaping Dear Mr. Goram: Enclosed is a letter from Landscape Design and Construction identifying when they anticipate completing the project and their reasons for the delay. We disagree with the statements regarding the sleeves. We do not concur that the locating of the sleeves was a cause for delay. We provided plans and as-builts to the subcontractor near the beginning of the project. We set up meetings with the contractor who installed the sleeves and Axon, early in the contract time, to coordinate the location of the sleeves. Ail sleeves that were installed under the prior contract have been located as shown on the plans with one exception. This sleeve is in the vicinity of Bethel School Road and is for a waterline for three or four medians. The delays due to rain, we can probably justify. It appears the completion date will be on or before August 29, 1990. Sincerely, Gabe Favre GF/dsp cc: Linda Smith, ASLA H. Wayne Ginn, P.E. J.R. Richardson File 406 17103 PresOrt Road · Suite 100 · LB 118 · Dall~,Texas 75248 · Phone 214/248-4900 'Design & Constraction August 8, 1990 Ginn, Inc. 17103 Preston Road Dallas, Texas 75248 Attn: Gabe Favre RE: Denton Tap Road Dear Mr. Favre, This is in response to your August 1, 1990, letter concerning the contract completion date for the above referenced project. We had anticipated an August 15 completion if all sleeving had been located. There is still one sleeve that has not been located which had been mentioned in a letter sent to J.R. Rickerson on May 10, 1990. This sleeve is for a water line that supplies several medians. Five other sleeves that we could not locate were located by Bill Brooks on August 3, 1990. In order to determine a definate completion date depends on the location of this final sleeve so that the irrigation can be completed. If this problem is resolved this week our completion date will be August 29, 1990. Other delays on the project were due to a rainy spring. We had rain on April 6, 10, 13, 19, 20, 26, 27; May 2, 3; June 1; August 6. If you have any questions please feel free to call me. Sincerely, Clyde St. John Production Manager CSJ:Io'd · Fax: 214/247-0426 Landscape Design & Construction, Inc. 2559 SOUTHWELL · DALLAS, TEXAS 75229 ', 214/247-3121