Loading...
ST8201-CS 891103COPPELL PUBLIC WORKS M]gMORANDU]~ DATE: November 3, 1989 TO: Steve Goram, Director of Public Works FROM: Howard Pafford, Water Utilities Superintendent 16" Waterline Repair at Parkway and Denton Tap/S' s Tickler 11/3/89 Completion of the backfill operation was again held up due to the signal contractor needing to pour the signal pole pier structure. All that remains Is one foot of top soil and fine grading. We will allow the concrete pier to set-up before charging the water line. Brown Park should have water by Monday morning. I will respond with another status report on November 7. If you have any questions regarding this matter, please advise. HLP/pd