ST9301A-CS 960522 DALLAS COUNTY
PUBLIC WORKS
May 22, 1996
CityMr' KenEngineerGriffin, P.E. 6 I"'~ ~ ~.~ [~' /
Ci~ of Coppell
P.O. Box 478
255 P~ay
Coppell, Texm 75019
Re: S~dy L~e Proje~ 91-838
(Coppell E. Ci~ Limi~ m D~I~ Ci~ L~t)
Harrington ~d F~row ROW Docum~
De~ ~. Griffin:
A~ach~ you will fred two se~ of ~e pla~ ~d leg~ d~criptiom for ~e H~rin~on ~d for ~e F~row
prope~i~. Pleme proce~ wi~ acquisition of ~e p~cels.
Reg~ding ~e H~r~gon p~cel, you w~l note ~at m a r~ult of your inqUki~ ~e c~ls have been
ch~g~ to refle~ ~e ~g to ~e exist~g roadway centerl~e m is c~l~ out on H~in~on's exist~g
de~.
~so, we reco~end you ~mider obm~g a "Right of En~~ m s~n ~ possible. As you ~ow, we
d~ire to s~ comm~ion ~ ~e next few monks ~d we ~e aw~e of ~e time period you will ne~ to
acquke ~e p~cel ~ough ~e Eminent Dom~ proc~s.
As ~ways you may c~l me at 653~23 if you have qu~tiom concerning ~e above or ~y o~er feature
of ~e bridge project.
S~cerely,
~ S. Griffin
Proje~ Eng~eer
ISG/isg
CC: Sel~ Cm~lo, P.E., Asst. Dk. DCPW
ffl~:~V:~m7.~
411 Elm Street, 4* Floor' Dallas, Texas 75202 (214) 653-7151