Fountain Park 1-CS 940323The City With A Beautiful Future
March 23, 1994
Mr. Tim House
Matthews Southwest
5220 Spring Valley/Pr00
Dallas, Texas 75240
?tt Box
2 B 1994 Texas 75019
pUBLiC
RE: Revised Street Light Fee Assessment/Fountain Park Addition
Dear Mr. House:
Enclosed with this letter please find the revised street light assessment for Fountain Park
Addition. Prior to the final acceptance of this project, a check in the amount of $160.39
covering the difference in the revised assessment should be made payable to the City of Coppell
and forwarded to Alan lohnson, Acting Finance D'rrector, along with a copy of the attached
street light fee assessment list.
Please provide a copy of your paid receipt to our office so that we will be able to verify payment
of the required fees and assure a successful completion of this project.
If you have any questions, please feel free to contact me at your convenience.
Sincerely,
Kenneth M. Griffin, P.E.
Assistant City Manager/City Engineer
Alan Johnson, Acting Finance Director
Steve Goram, Director of Public Works
Greg Jones, Building Official
Doug Stevens, Engineering Technician
Development Fees
Page 4
for
Fountain Park
STREBTSIGNASSESSHENT
The following assessment is being made in accordance with the City
of coppell Subdivision Ordinance Appendix A Chapter VIII A. The
following cost of those sign materials required are based on
current pricing which is reviewed on a regular basis.
No Parking S53.10
Speed Limit 63.54 6 $381.24
Yield 58.56
Stop 65.12
Street Name 11.60 I 11.60
Stop & Street Combo 96.85 $ 290.55
OTHER
~Outlet 11.60 ~ 23.20
TOTAL $706.59
Cost breakdowns maybe obtained from Public Works by wrttte~
request.
HLP/dm
cc: Steven G. Goram
Director of Public Works
FEES.FOUNTAIN.HLP
Development Fees
Page 4
STREET SIGN ASSESSNEN~
for Fountain Park Addition
The following assessment is being made in accordance with the City
of Coppell Subdivision Ordinance Appendix A Chapter VIII A. The
following cost of those sign materials required are based on
current pricing which is reviewed on a regular basis.
No Parking $53.10 --
Speed Limit $63.54 $
Yield $58.56 --
Stop _~ --
Street Na~e ~ $
Stop & Street Co~o ~96.~5 ~
OTHER
546.20
¢os~ b~eakdo~ns ~ay be obtained ~om ~bZi~ ~o~ks by r~i~an
reguemt.
DEVFEES.HLP
Revised 12/15/92