Loading...
Fountain Park 1-CS 940323The City With A Beautiful Future March 23, 1994 Mr. Tim House Matthews Southwest 5220 Spring Valley/Pr00 Dallas, Texas 75240 ?tt Box 2 B 1994 Texas 75019 pUBLiC RE: Revised Street Light Fee Assessment/Fountain Park Addition Dear Mr. House: Enclosed with this letter please find the revised street light assessment for Fountain Park Addition. Prior to the final acceptance of this project, a check in the amount of $160.39 covering the difference in the revised assessment should be made payable to the City of Coppell and forwarded to Alan lohnson, Acting Finance D'rrector, along with a copy of the attached street light fee assessment list. Please provide a copy of your paid receipt to our office so that we will be able to verify payment of the required fees and assure a successful completion of this project. If you have any questions, please feel free to contact me at your convenience. Sincerely, Kenneth M. Griffin, P.E. Assistant City Manager/City Engineer Alan Johnson, Acting Finance Director Steve Goram, Director of Public Works Greg Jones, Building Official Doug Stevens, Engineering Technician Development Fees Page 4 for Fountain Park STREBTSIGNASSESSHENT The following assessment is being made in accordance with the City of coppell Subdivision Ordinance Appendix A Chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. No Parking S53.10 Speed Limit 63.54 6 $381.24 Yield 58.56 Stop 65.12 Street Name 11.60 I 11.60 Stop & Street Combo 96.85 $ 290.55 OTHER ~Outlet 11.60 ~ 23.20 TOTAL $706.59 Cost breakdowns maybe obtained from Public Works by wrttte~ request. HLP/dm cc: Steven G. Goram Director of Public Works FEES.FOUNTAIN.HLP Development Fees Page 4 STREET SIGN ASSESSNEN~ for Fountain Park Addition The following assessment is being made in accordance with the City of Coppell Subdivision Ordinance Appendix A Chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. No Parking $53.10 -- Speed Limit $63.54 $ Yield $58.56 -- Stop _~ -- Street Na~e ~ $ Stop & Street Co~o ~96.~5 ~ OTHER 546.20 ¢os~ b~eakdo~ns ~ay be obtained ~om ~bZi~ ~o~ks by r~i~an reguemt. DEVFEES.HLP Revised 12/15/92