Loading...
Fountain Park 1-CS 930923Tel. (214) 934-0123 Fax (214) 980-2421 September 23, 1993 Mr. Howard Pafford Utilities Superintendent City of Coppell P.O. Box 478 Coppell, 'D( 75019 'i Via Fax: 393-7648 Re: Fountain Park Addition Sandy Lake Road Water Line Connection Dear Mr. Pafford: The purpose of this letter is to verify the discussions and agreement between you and Lynn Kadleck, my engineer on the referenced project, regarding the water line connections between our subdivision and the line along Sandy Lake Road. As you know, our original plans called for two connections to this line in order to provide a looped system. At that time we were not certain that we would be able to acquire the 3.5 acre tract immediately east of Fountain Park. On August 31 we completed the acquisition of this 3.5 acre tract, and we are presently in the process of zoning and platting the property for development as the connecting piece between Fountain Park and our Water's Edge project located along MacArthur Blvd. This will enable a looped water system and eliminate the need for one of the connections to Sandy Lake Road. It is my understanding that you are in agreement that we can eliminate the western water line connection (located between Lots 4 and 5 of Block A) based upon our representation that we will provide a connection to the tract to the east. It is also my understanding that your agreement is contingent upon our inItiating construction activity on the adjacent tract within six months of this letter. At such time, if we have not started construction or cannot provide evidence that such construction is imminent, we will be required to make the second connection to the Sandy Lake water line per the original plans. Thank you for your consideration and cooperation on this matter. Sincerely, Vice President TH:jad