Loading...
Fountain Park 1-CS 930622 ; .JU? 1993 The City With ' !i~ June 22, 1993 Mr. Tim House Matthews Southwest 5220 Spring Valley #500 Dallas, TX 75240 P.O. Box 478 Coppell, Texas 75019 214-462-0022 RE: Fountain Park Addition Development Fee Assessment Dear Mr. House: Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the development fee calculations for Fountain Park Addition. Please provide a check made payable to the City of Coppell in the amount of $132,574.20, plus 2 % of the construction cost and forward it to Mr. Alan Johnson, Acting Finance Director, Finance Department, along with a copy of the fee assessment list. This should be provided prior to City Council approval of the final plat. Also, please provide our office a copy of the Engineer's Estimate or contract for this project so the construction inspection fee can be verified. Please provide a copy of your paid receipt to our offices. Copies of your receipts will help us verify payment of the required fees and assure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely, Kenneth M. Griffin, P.E. City Engineer CCi Steve Goram, Director of Public Works Alan Johnson, Acting Finance Director Greg Jones, Building Official Doug Stevens, Engineering Technician Date: Project: June 22, 1993 Fountain Park Addition Park Fee (50% due prior to Council Approval) (50% due at Issuance of Building Permit) Water Impact Fee (100% due prior to Council Approval) Water Tap Ir,~pectlon Fee (100% due at Issuance of Building Permi0 Wastewater Impact Fee (100% due prior to Council Approval) Sewer Tap Inspection Fee (100% due at Issuance of Building Permi0 Utility Final Inspection Fee (100% due at Issuance of Building Permit) Water Meter Fee (Lots) (100% due at Issuance of Building Permi0 Water Meter Deposit (100% due at Issuance of Building Permit) Street Sign Fee (100% due prior to Council Approval) Street Light Fee (100 % due prior to Council Approval) Street Escrow(628.30/ft x $160/ft) Construction lnapection Fee (2% of Project Cost due prior to Preconstruction Meeting) Total TOTAL $ 10,500.00 AMOUNT DUE PRIOR TO COUNCIL APPROVAL $ 5,250.00 $ 19,500.00' $ 19,500.00' $ 3,000.00 $ -0- $ 6,750.00 $ 6,750.00 $ 3,000.00 $ -0- $ 1,500.00 $ -0- $ 667.50 $ -0- $ 900.00 $ -0- $ 546.20 $ 546.20 $ ** $ 100,528.00 $ 100,528.00 $146.891.70 $~ TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $ 132,574.20 +2% inspection fee * The water impact fees do not include the fees for the irrigation meters. ** Cannot be assessed until after TU Electric submits lighting plan. COPPELL PUBLIC WORKS MEMORANDUM DATE: TO: FROM: RE: June 17, 1993 Ken Griffin, City n Staff % Public Works Development Fees for Fountain Park The following fees should be assessed and collected on the above referenced project. Water Impact Fee: 30 - 5/8" x 3/4" Domestic Meter/s = 3O ESU's Total 30 ESU's ~ $650.00 ea = $ 19.500.00 100% due prior to Council approval of the final plat. Wastewater Impact (MUD) 30 - 5/8" x 3/4" Residential Meters = 30 ESU's Total 30 ESU's @ $225.00 ea = $ 6,750.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 30 Connections ~ $100.00 each = $ 3,000.00 100% due prior to issuance of building permit. (Or in the case of the irrigation meter-prior to issuance of meter). Sewer Tap Inspection Fee 30 Connections ~ $100.00 each = $ 3,000.00 100% due prior to issuance of building permit. Development Fees Page 2 Utility Final Inspection Fee 30 lots @ $50.00/lot = $ 1.500.00 100% due prior to issuance of building permit. Water Meter Fee (Lots) 30 - 5/8" x 3/4" Residential Meters ~ $22.25 ea 100% due prior to issuance of building permit. = $ 667.50 Water Meter Deposit Residential - 30 meters @ $30.00 ea = $ 900.00 100% due prior to issuance of building permit. Street Lighting Fee Shall be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted $292.60 per light will be assessed. Street Signs Fee See attached Street Sign Assessment sheet. 100% due prior to final acceptance of project. Park Fee N/A N/A Residential Lots at $150.00 each = $ N/A Units (Multi family) at $75.00 each = $ N/A For those developments having preliminary plat approval prior to June 23, 1992 the following assessment is determined: 50% of the amount specified above shall be paid by the Developer; prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. Development Fees Page 3 For those developments having preliminary plat approval after June 23, 1992 the following assessment is determined: 3O Residential Lots at $350.00 each = $ 10,500.00 Units (Multi-Family) at $350.00 each = $ 50% of the amount specified above shall be paid by the Developer prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. Please advise the Developer of these fees and due dates. If you have any questions regarding these assessments please advise. HLP/dm cc: Steven G. Goram Director of Public Works DEVFEES.HLP Development Fees Page 4 STREET SIGN ASSESSMENT for Fountain Park Addition The following assessment is being made in accordance with the City of Coppell Subdivision Ordinance Appendix A Chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. SIGN UNIT PRICE QUANTITY EXTENDED PRICE No Parking $53.10 .... Speed Limit $63.54 5 317.70 Yield $58.56 .... Stop $65.12 .... Street Name $11.60 3 34.80 Stop & Street combo $96.85 2 193.70 OTHER TOTAL 546.20 Cost breakdowns may be obtained from Public Works by written request. DEVFEES.HLP Revised 12/15/92