July 28, 1993
Mr. Tim House
Matthews Southwest
5220 Spring Valley #500
Dallas, TX 75240
Box 478
pell. Texas 75019
:462-0022
RE: Fountain Park Addition Irrigation Fees
Dear Mr. House:
We are enclosing a copy of the City of Coppell development fee calculations for Fountain Park
Addition for water impact fee/water tap fee associated with the irrigation meters. These fees were
not included in your check for $136,828.20 paid July 1, 1993 for development fees. The irrigation
fees include:
Water Impact Fee: $3,250.00
Water Tap Fee: $200.00
Water Meter Fee: $124.20
Irrigation Meter Deposit: $70.00
TOTAL $3,644.20
Please provide a check made payable to the City of Coppell in the amount of $3,644.20 and forward
it to Alan Johnson, Acting Finance Director, along with a copy of the fee calculations as soon as
possible. If you will provide a copy of your paid receipt to our office, it will help us verify
payment of the required fees for this project.
If you have any questions, please do not hesitate to contact me.
Sincerely,
Michael A. Martin E.I.T.
cc: Steve Goram, Dir. of Public Works
Alan Johnson, Acting Finance Director
Greg lones, Building Official
Gary Sieb, Dir. of Community Services
Larry Davis, Construction Inspector
COPPELL PUBLIC WORKS
MEMORANDUM
DATE:
TO:
FROM:
RE:
The following
project.
July 22, 1993 (
Doug Stevens, Engineering Technician ~_
Steven G. Goram, Director of Public WorF~
Development Fees for Fountain Park
fees should be assessed on the above
referenced
Water Impact Fee:
30 - %" x ~"
2 - %" x %"
Domestic Meter/s = 30 ESU's
Irrigation Meter/s = 5 ESU's
Total 35 ESU's @ $650.00 ea = 22~.00
100% due prior to Council approval of final plat.
Wastewater Impact
30 - %" x ~"
Total 30
100% due prior to Council approval
Residential meters = 30 ESU's
ESU's @ $225.00 ea = $ 6,750.00
of the final plat.
Water Tap Inspection Fee
32 Connections @ $100.00 each = ~
100% due prior to issuance of building permit. (Or in the case of
the irrigation meter-prior to issuance of meter).
Sewer Tap Inspection Fee
30 Connections @ $100.00 each = $3,000.00
100% due prior to issuance of building permit.
DEVELOPMENT FEES
Page 2
Utility Final Inspection Fee
30 lots ~ $50.00/lot = $1,500.00
100% due prior issuance of building permit.
Water Meter Fee (Lots)
30 - %" x %" Residential Meters @ $22.25 ea
100% due prior to issuance of building permit.
= $667.50
Water Meter Fee (Irrigation)
100%
1, Irrigation Meter @ $62.10
Total
due prior to issuance of water meters.
aa = $124.20
= $124.20
Water Meter Deposit
Residential 30 meters @ $30.00 ea = $900.00
100% due prior to issuance of building permit.
Irrigation Meter Deposit
2 - 1" meters @ $35.00 ea = $70.00
Total = $70.00
100% due prior to issuance of water meters.
Street Lighting Fee
Shall be assessed and paid prior to final acceptance of project.
Note: This fee cannot be assessed until after TU Electric
submits the lighting plan for the proposed project. Once
plan is submitted, $292.60 per light will be assessed.
Development Fees
Page 3
Street Signs Fee
See attached Street Sign Assessment sheet.
100% due prior to final acceptance of project.
Park Fee
Residential Lots ~ $150.00 ea = $
Units (Multi-family) ~ $75.00 ea = $
For those developments having preliminary plat approval prior to
June 23, 1992 the following assessment is determined:
50% of the amount specified above shall be paid by the Developer;
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a
building permit is issued.
For those developments having preliminary plat approval after June
23, 1992 the following assessment is determined;
30 Residential Lots @ $350.00 ea = $10,500.00
Units (Multi-family) at $350.00 ea = $
50% of the amount specified above shall be paid by the Developer
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a
building permit is issued.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please
advise.
HLP/dm
cc: Steven G. Goram
Director of Public Works
Development Fees
Page 4
for
STREET SIGN ASSESSMENT
Fountain Park
The following assessment is being made in accordance with the City
of Coppell Subdivision Ordinance Appendix A Chapter VIII A. The
following cost of those sign materials required are based on
current pricing which is reviewed on a regular basis.
SIGN UNIT PRICE QUANTITY EXTENDED PRICE
No Parking $53.10
Speed Limit 63.54 6 $381.24
Yield 58.56
Stop 65.12
Street Name 11.60 1 11.60
Stop & Street Combo 96.85 3 290.55
OTHER
No Outlet 11.60 2 23.20
TOTAL $706.59
Cost breakdowns may be obtained from Public Works by written
request.
HLP/dm
cc: Steven G. Goram
Director of Public Works
FEES.FOUNTAIN.HLP