Fountain Park 1-CS 930617COPPF. nn PUBLIC WORKS
MEMORANDUM
DATE:
TO:
FROM:
RE:
June 17, 1993
KenGriffin, ¢'ity..~~
Public Works Staff"~~
Development Fees for Fountain Park
The following fees should be assessed and collected on the above
referenced project.
Water Impact Fee:
30 - 5/8" x 3/4" Domestic Meter/s
= 3O
ESU's
Total 30 ESU's @ $650.00 ea = $ 19.500.00
100% due prior to Council approval of the final plat.
Wastewater Impact (~UD)
30 - 5/8" x 3/4" Residential Meters = 30 ESU's
Total 30 ESU's @ $225.00 ea = $ 6,750.00
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
30 Connections ~ $100.00 each = $ 3,000.00
100% due prior to issuance of building permit. (Or in the case of
the irrigation meter-prior to issuance of meter).
Sewer Tap Inspection Fee
30 Connections ~ $100.00 each = $ 3,000.00
100% due prior to issuance of building permit.
Development Fees
Page 2
Utility Final Inspection Fee
30 lots ~ $50.00/lot = $ 1.500.00
100% due prior to issuance of building permit.
Water Meter Fee (Lots)
30 - 5/8" x 3/4" Residential Meters @ $22.25 ea
~00% due prior to issuance of building permit.
= $ 667.50
Water Meter Deposit
Residential - 30 meters @ $30.00 ea = $ 900.00
100% due prior to issuance of building permit.
Street Lighting Fee
Shall be assessed and paid prior to final acceptance of project.
Note: This fee cannot be assessed until after TU Electric
submits the lighting plan for the proposed project. Once
plan is submitted $292.60 per light will be assessed.
Street Signs Fee
See attached Street Sign Assessment sheet.
100% due prior to final acceptance of project.
Park Fee
N/A
N/A
Residential Lots at $150.00 each = $ N/A
Units (Multi family) at $75.00 each = $ N/A
For those developments having preliminary plat approval prior to
June 23, 1992 the following assessment is determined:
50% of the amount specified above shall be paid by the Developer;
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time
building permit is issued.
as a
Development Fees
Page 3
For those developments having preliminary plat approval after June
23, 1992 the following assessment is determined:
30 Residential Lots at $350.00 each = $ 10.500.00
Units (Multi-Family) at $350.00 each = $
50% of the amount specified above shall be paid by the Developer
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a
building permit is issued.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please
advise.
HLP/dm
cc: Steven G. Goram
Director of Public Works
DEVFEES.HLP
Development Fees
Page 4
STREET SIGN ASSESSMENT
for Fountain Park Addition
The following assessment is being made in accordance with the City
of Coppell Subdivision Ordinance Appendix A Chapter VIII A. The
following cost of those sign materials required are based on
current pricing which is reviewed on a regular basis.
SIGN
No Parking
Speed Limit $63.54
Yield $58.56
Stop $65.12
Street Name $1~.60
Stop & Street Combo $96.85
UNIT PRICE
$53. o
OUANTITY EXTENDED PRICE
5 317.70
3 34.80
2 193.70
OTHER
TOTAL 546.20
Cost breakdowns may be obtained from Public Works by written
request.
DEVFEES.HLP
Revised 12/15/92