Loading...
Fountain Park 1-CS 930617COPPF. nn PUBLIC WORKS MEMORANDUM DATE: TO: FROM: RE: June 17, 1993 KenGriffin, ¢'ity..~~ Public Works Staff"~~ Development Fees for Fountain Park The following fees should be assessed and collected on the above referenced project. Water Impact Fee: 30 - 5/8" x 3/4" Domestic Meter/s = 3O ESU's Total 30 ESU's @ $650.00 ea = $ 19.500.00 100% due prior to Council approval of the final plat. Wastewater Impact (~UD) 30 - 5/8" x 3/4" Residential Meters = 30 ESU's Total 30 ESU's @ $225.00 ea = $ 6,750.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 30 Connections ~ $100.00 each = $ 3,000.00 100% due prior to issuance of building permit. (Or in the case of the irrigation meter-prior to issuance of meter). Sewer Tap Inspection Fee 30 Connections ~ $100.00 each = $ 3,000.00 100% due prior to issuance of building permit. Development Fees Page 2 Utility Final Inspection Fee 30 lots ~ $50.00/lot = $ 1.500.00 100% due prior to issuance of building permit. Water Meter Fee (Lots) 30 - 5/8" x 3/4" Residential Meters @ $22.25 ea ~00% due prior to issuance of building permit. = $ 667.50 Water Meter Deposit Residential - 30 meters @ $30.00 ea = $ 900.00 100% due prior to issuance of building permit. Street Lighting Fee Shall be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted $292.60 per light will be assessed. Street Signs Fee See attached Street Sign Assessment sheet. 100% due prior to final acceptance of project. Park Fee N/A N/A Residential Lots at $150.00 each = $ N/A Units (Multi family) at $75.00 each = $ N/A For those developments having preliminary plat approval prior to June 23, 1992 the following assessment is determined: 50% of the amount specified above shall be paid by the Developer; prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time building permit is issued. as a Development Fees Page 3 For those developments having preliminary plat approval after June 23, 1992 the following assessment is determined: 30 Residential Lots at $350.00 each = $ 10.500.00 Units (Multi-Family) at $350.00 each = $ 50% of the amount specified above shall be paid by the Developer prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. Please advise the Developer of these fees and due dates. If you have any questions regarding these assessments please advise. HLP/dm cc: Steven G. Goram Director of Public Works DEVFEES.HLP Development Fees Page 4 STREET SIGN ASSESSMENT for Fountain Park Addition The following assessment is being made in accordance with the City of Coppell Subdivision Ordinance Appendix A Chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. SIGN No Parking Speed Limit $63.54 Yield $58.56 Stop $65.12 Street Name $1~.60 Stop & Street Combo $96.85 UNIT PRICE $53. o OUANTITY EXTENDED PRICE 5 317.70 3 34.80 2 193.70 OTHER TOTAL 546.20 Cost breakdowns may be obtained from Public Works by written request. DEVFEES.HLP Revised 12/15/92