ST8201-CS 890403 GINN, INC. April 3, 198~ Mr. Russe~ Doyle, p.~ City Eng~heer City of/Coppell / P. O./~ox 478 / cop 7 cb Re~ pelto? T~p Road Improvements from Belt ~ Road - McDonalds, TemDorar~ Access Dear Mr. Doyle: NSULTI G ENGINEERS Line Road to Sandy Pursuant to our telephone conversation of March 23, 1989, I instructed Mr. Fleming, our project representative, to contact the Contractor and request that he contact Mr. Greer and work out a solution to Mr. Greer's concerns. My March 24, 1989 followup on this contact indicated that the Contractor had not yet made the contact so I instructed Mr. Fleming to continue pursuing this matter with the Contractor. At 9:30 PM on Saturday evening, March 25, 1989, City Councilman Mark Wolfe called Mr. Ginn regarding complaints he had recieved from Mr. Greet and the interruption of his business. Mr. Ginn called the restaurant and spoke to the manager. The manager said there was no problem and that business had been good all evening. Mr. Ginn then returned Mr. Wolfe's call at 9:32 PM and reported same. Mr. Wolfe thanked Mr. Ginn for his efforts. On Monday, March 27, I attended the weekly project progress meeting at the project trailer. Since you and I had discussed this matter that morning, prior to my departure to the site, I made a stop at the McDonalds to visually confirm the access. There was no interruption of either of the existing driveways, and no obvious barriers to visibility or access. At the project meeting I stressed to the Contractor the importance of effective communication with the property owners and the need to keep them informed of changing situations as they occur. I suggested that they set up a meeting with Mr. Greet as soon as possible and allow us to attend. The meeting was arranged for Wednesday morning, March 29, 1989, at 10:00 AM at McDonalds. Very early in the meeting Mr. Greet stated that he was unaware of any reason for Ginn, Inc. to be involved, as he and the Contractor had reached agreement the week before as to the provision of temporary access to his business during paving construction at that location. He mentioned that he had discussed his situation with some of the City Councilmen, but was not complaining or trying to get any specific action. 17103 Preston Road · Suite 100 · LB 118 · Dallas. Texas 75248 · Phone 214/248-4900 Our meeting with Mr. Greer and the Contractor gave us the opportunity to listen and comment on the Contractor's proposed temporary access. The result of the meeting is that the restaurant will have a temporary two way asphalt driveway constructed at its southern property line which will allow both entrance and egress for north and south bound traffic; and the existing concrete alley at the rear of the property which connects to Sandy Lake Road will be used as an alternate access. The Contractor will furnish slgnage to direct customers to these access points. A proposed driveway to Denton Tap Road located at the north property, line was eliminated from consideration due to the short distance from the Sandy Lake/Denton Tap intersection to the temporary detour across the median. This would create a safety hazard to traffic southbound from the intersection. Preparation of signage is planned to begin immediately, with the driveway construction, signage, and barrier adjustments on about April 10, 1989. It is anticipated that the paving of both McDonalds permanent driveways as well as the roadway in front of McDonalds will take two weeks barring weather or other delays. We want to emphasize that this agreement exists between the property owner and the Contractor and that Ginn, Inc. and the City of Coppell are not obligated in any way or fashion. Mr. Greet also requested that a press release be sent to the newspaper and the Cable Television network announcing the alternate access. We will leave it to your discretion to respond to this. It appears that the situation is now stable. In regard to Mr. Fuller's complaints, you will recall that the Engineering, Public Works, Fire and the Police Departments were present in a meeting at Coppell Town Center on T~esday, March 7, 1989, when the Contractor presented his traffic plan which temporarily routed traffic onto Oak Crest Street. It came to my attention this past Monday morning, prior to the project progress meeting, that Lt. Leonard and Vivyon Bowman met our representative at our field office on Friday afternoon, April 24, 1989, in response to the attached complaint. They moved barricades placed by the Contractor and erected them in another location. This placed the City in full and sole responsibility for any damages, losses, etc. resulting from any accidents arising out of the traffic control and routing situation at the time. This all occurred at a time when all project personnel were available for consultation prior to taking any action. All departments have our listing of emergency telephone numbers, with which someone in authority may be reached at any time. We highly recommend that they use these numbers. In the future it would be appropriate for the City to contact our office in these situations and allow us to investigate the situation and recommend the appropriate action before undertaking the moving of any barricades or traffic control devices. Our attempts to contact Mr. Fuller by telephone have date. We shall continue to try to contact him. If you have any questions, please call me. Sincerely, C. Karlsruher, P.E. Project Engineer cc: Tom Griffin, Chief of Police H. Wayne Ginn Randy Fleming David Snyder, L. H. Lacy Co. File J - 378/260 (a:j378mac) failed to DATE .~'-.,,~. ~. MESSAGE ,q~ ._7'- vv,~.c ,o,scc,,:,-..~ ~.,,-r/~, ~/ ~ REPLY DAT.E SIGNED -..COMPL~INT.FORM'.i . .: - TYPE OF COMPLAINT: OCM CITIZEN DEPT. DUE DATE: (NOTIFY SEC. TO UPDATE) COMMENTS: · .~~- - .-~_ _--~_ _ ~ _~__ 1~ ~ _ _~__ ~_ ~_ _~ -~Z2Z~ Z .... ~--- -Y '~-'- -~-~- - ';~- -~:~- -f--~--~:-~-~ ~~i~._a_, ;~_~~_~_! ~ ~_~__.~ GINN, INC. CONSULTING ENGINEERS April 3, 1989 Mr. Russell Doyle, P.E. City Engineer City of Coppell P. O. Box 478 Coppell, Texas 75019 Re: Denton Tap Road Improvements from Belt Line Road to Sandy Lake Road - McDonalds' Temporary Access Dear Mr. Doyle: Pursuant to our telephone conversation of March 23, 1989, I instructed Mr. Fleming, our project representative, to contact the Contractor and request that he contact Mr. Greet and work out a solution to Mr. Greer's --- My March 24, 1989 followup on this contact indicated ~-~ -ot yet made the contact so I inst~ct~ matter with the Contractol At 9:30 PM o~ e, Mark Wolfe call--i! from Mr. Greer and the J called the restaurant anf there was no problem and Mr. Ginn then returned M same. Mr. Wolfe thanked On Monday, March 27, meeting at the project this matter that mornir made a stop at the Mc There was no interrupt and no obvious barriers meeting I stressed to 1 .,~ommunication with the Vinformed of changing s they set up a meetinG allow us to attend. /~/ The meeting was arran,~~~1 at 10:00 AM at McDon~ stated that he was u involved, as he and tl before as to the pro' during paving constr% he had discussed his but was not complainJ ve em ~nd  / 89, eer reek less =hat ~en~ 17103 PrcMon Road ·Suitc 100 · LB Il8 · Dallas, Texas 75248 · Phonc 214/248-4900