ST8201-CS 890222GINN, INC.
February 22, 1989
M~. Russell~yle,
City of Co~ell
P.O. Bo~/478
Cop~,.~, ~ 75019
CONSULTING ENGINEER
Michael Walsh letter dated February
Dear Mr. Doyle:
It is our intention to include landscape items such as this in
the landscape project which will follow the road construction
project. We will make provisions in the project construction
budget for restoration of any landscape damaged during road
construction.
Please call me if you have any questions.
Sincerely,
John C. Karlsruher, P.E.
JCK/dsp
cc:
Linda Smith
Richard Dianou,/
H. Wayne Ginn, P.E.
Randy Fleming
17103 Prcsto. Road · Suite I00 · LB 118 · Dallas, Tcxas 75248 · Phone 214/248-4900
DATE SENT: ~- )~
ACTION
TICKLER' FROH: RUSSELL DO~I~,
RESPONSE DUE:
~ ~D ~ Co~
FOR YOUR APPROVAL
NOTE & FILE
NOTE & REPLY
NOTE & RETURN
SET UP APPOINT~EI~T TO REVIE~ ATTACHED
PLEASE TAKE CRARGE OF TItlS
PREPARE REspONsE FOR HY SIGNATURE
OTItER
RETURN
T H I S F'O R H W I T H
RESPONSE!
February 14, 1989
Mr. Russell Doyle
City Engineer.
P.O. Box 478
Coppell, TX 75019
Dear Mr. Doyle:
I am glad to see the construction of Denton Tap progress.
One ~f the unfortunate by-products of this construction is
the destruction of existing properties. Your staff has
recommended that I contact you since you represent the city
in dealing with the contractor(s).
The particular instance I am talking about is on the
southwest corner of the Denton Tap and Bethel School
intersection. At that corner the developer of shadowridge
Estates built a brick planter several years ago. The
residents of the area have worked with the developer to
ensure that planter was properly landscaped and maintained.
This took a iot of effort, but did pay off as the developer
has maintained the landscaping and even added an sprinkler
system.
As the construction of Denton Tap has proceeded, I've
noticed that the construction crews dumped a large amount of
dirt on this particular planting, probably killing all the
shrubs (Nana Nandinas and Crepe Myrtles). They also removed
one of the valve boxes for the sprinkler system.
I would assume that the contractor(s) plans to cleanup the
dirt, replant the the planter with high quality plants, and
verify that the sprinkler system works. As a representative
of the City of Coppell, I ask you to ensure that these
action items are in the plan for the project and they are
actually completed.
Please let me know if the contractor(s) are taking care of
this. Thank you.
233 Southern Belle
coppell, TX 75019