ST8201-CS 890203 (2) GINN, INC.
uary 3, 1989
Mr. David M. Snyder, P.E. [ ~
L. H. Lacy Company /I ~ ~
P.O. Box 541297 /[/ v ~
Dallas, Texas 75354-1297 llv ~
Re~_~Ilt~on~ Tap ~vements~L-~' ~ ~.from Belt
La~e 14o~d -'--~[~-[~ona~-q~vewa~
Line Road t~~andy
Dear Mr. Snyder:
I am writing this letter in response to your January 20, 1989
letter concerning your paving sequence in this area. I do not
fully understand your letter, but I can address a couple of items
which appear to be pertinent. The driveways for McDonalds were
not shown on the Contract Drawings simply because McDonalds did
not exist at the time that the Plans were completed. As to
paving of the driveways, they are customarily paved in accordance
with the Drawings and Specifications as if they were actually
shown on the Drawings. Payment, of course, is to be in
accordance with the applicable Pay Items in the Contract, and the
final quantities will reflect an overrun accordingly.
In discussing your proposed paving sequence for this area, it
would be helpful if you would provide a sketch of what you
propose for our consideration. When proposing your sequence we
will require a Traffic Control Plan reflecting your handling of
the traffic with respect to the adjacent controlled intersection.
We also expect you to coordinate the driveway construction with
the affected property owner.
Please provide our resident project representative, Mr. Randy
Fleming, with a sketch and a Traffic Control Plan of what you
propose and he will begin our review and comment process for this
item.
Please call me if you have any questions.
sincerely, ·
John C. Karlsruher,
Project Engineer
enclosures
CC:
~~.6inn, P.E.
~ DCa/la, P.E.
Randy Fleming
File J - 378
a:j378mac
17103 I'rcston I,toad · ,'quilt I00 · I,IIII8 ® I)alla>,, l'cxas 752,18 · I'lltmc 214/248-4900
]0:
A'T"T'N:
PROJECT:
DE]AR JOHN,
(S!NN~ tNC,, CONSUL'[INb EIqG1NEE;.RS
17]U3 PRES]ON ROAD
SOI]E 1()(), LB-118
,I)/-~L L ,'.~ .s ~ 'i E X;.~ 75248
JAN 2 3?:"
J[IHN KAf:(!_SRUHEF¢, P.E.
DENTON 'rAP ROAD IMF'ROVEMENT FROM BELT LINE 'TO SANDY L~),KE
PF,:O,.1ECT :S78
IN REVIEWING MY F'LANS (CONTRACT CONTRACT) SET, ]:T HAS COME
TO MY ATTENTION THAT NO PROVISION HAS BEEN MADE FOR DRIVE:.
AF'PROACHES TO THE: McDONALD'S RESTARAUNT PROPERTY ,'lUST SOUTH
OF SANDY LAKE ON THE WEST SIDE OF DENTON 7'AP. THiS IS F-'!IASE 2
WORK~ BU'[ AS WE HAVE TALKED BEFORE ~- IT IS MY iN'IENTiON TO
POUR B~CK ONE OF ]'HE McDONALD'~S DRIVES, AND THREE L. ANES OF
F'AVING PREVIOUS TO PHASE 2 PAVING OPERA'I'tONS TO HELP REi)UCE
THE'] N'.JMBER OF' BLOC;I<OUTS ]"[} ZERO. ONCE WEE SWITCH 'i'RAFF:IC ]0
7HE PHF:SE I SLAB WE WILL. F'ROGRESS VER~' DUiDi<L¥ WiTH ThiE. PHraSE
2 DRAINAGE ~,. EXCAVATION AC]'IVITiES.
THANK-YOU F:]DR YOUR ATTENTION TO THiS
RESPECTF ULL',' ,
DAViI) M. SNYL)ER. P.~.
PROOECT M~4NAGER
L. H. Lacy Company
General Contractors
214/357-0146
"Quality Construction for over 65 Years"
10888 Shady Trail
P.O. Box 541297
Dallas, Texas 75354-1297