ST8201-CS 890104TO SENDER . RETAIN THIS COPY GINN, INC. January 3, 1989 CONSULTING ENGINEERS Mr. Russell R. Doyle, P.E. City Engineer City of Coppell P.O. Box 478 Coppell, Texas 75019 Re: Denton Tap Road Improvements from Belt Line Road to Sandy Lake Road - Water on the Roadway at the Sandy Lake Rd. intersection. Dear Mr. Doyle: As req~/ested in your November 14, 1988 memo, copy attached, we have reviewed the existing paving and drainage facilities in the southeast quadrant of the Sandy Lake Road/Denton Tap Road intersection. It appears that the most practical and least expensive solution to eliminating most of the flow of sprinkler water out of the most northerly driveway from Town Oaks Centre onto and across the northbound lanes of Denton Tap Road is to construct inlets in the driveway as shown on the attached marked print and tie them into the existing storm sewer system as shown. We recommend that the work depicted on the attached print be included in the scope of work of the current Contract for the Denton Tap Road Improvements from Belt line Road to Sandy Lake Road. The approximate construction cost of this work is $6,000.00. This item can be charged to the contingency fund in the project budget, copy attached. Due to the fact that the work will have to be done on private property, it will also require that two drainage easements be acquired. Unless directed otherwise, we will proceed to prepare the necessary drainage easements. Upon receipt of the easements, we will add the necessary inlet to the project. We trust this meets with your approval. Sincerely, Jo~n C. Karlsruher, P.E. Project Engineer enclosures cc: H. Wayne Ginn, P.E. J-378 (a:j378minw) 17103 Preston Road · Suite 100 · LB 118 · Dallas. Texas 75248 · Phone 214/248-4900 PROPOSED PROJECT BUDGET DENTON TAP ROAD IMPROVEMENTS FROM BELT LINE ROAD TO SANDY LAKE ROAD; AND FROM SANDY LAKE ROAD TO DENTON CREEK CONSTRUCTION (6 LANE w/St'd. RAILROAD CROSSING CONOCO PIPELINE STREET LIGHTS LANDSCAPING TRAFFIC SIGNALS RIGHT - OF - WAY ENGINEERING INSPECTION & TESTING TRENCH SAFETY CONTINGENCIES Bridge Rail) $ 5,161,131.83 * $ 206,000.00 $ 40,000.00 $ 217,500.00 $ 213,000.00 $ 170,000.00 $ 100,000.00 $ 443,402.66 $ 154,833.95 $ 26,763.39 $ 367,368.17 * TOTAL $ 7,100,000.00 (-) TOTAL AVAILABLE CITY FUNDING ($ 4,500,000.00) (=) NECESSARY FIJNDING FROM DALLAS COUNTY $ 2,600,000.00 TOTAL AVAILABLE DALLAS COUNTY '85 BOND FUNDS $ 4,250,000.00 (-) NECESSARY FUNDING FROM DALLAS COUNTY ($ 2,600,000.00) (=) REMAINING '85 DALLAS COUNTY BOND FUNDS $ 1,650,000.00 REVISED APRIL 6, 1988 * REVISED APRIL 18, 1988 The estimated construction costs have been revised to include the only TOTAL BASE BID (6 LANE) for each project. Initially this item also included the Contractor proposed $ 40,000.00 reduction in estimated Contract Price; the alternate bid item for a retaining wall~(which is no longer needed); and the additional cost of the Contractor's proposed Alternate Trench Safety System. After further consideration, these costs have been deleted from Construction and added to the Contingencies. GINN, INC. CONSULTING ENGINEERS December 19, 1988 Mr. Russell Doyle, City of Coppell P.O. Box 478 Coppell, TX 75019 P.E. Re: Attached Memo - Water on Roadway on Denton Tap at Sandy Lake Dear Mr. Doyle: Mr. John Karlsruher, the Project Engineer for the Denton Tap CIP, is looking into the matter to determine the best method to handle the problem. Upon completion of his investigation, we will to the Denton Tap plans that will facilitate of the sprinkler water as possible. make field changes picking up as much We believe that once the Denton Tap Road project is complete, the problem will essentially be eliminated. Sincerely_, H. Wayne Gihn, P.E. HWG/dsp cc: John C. Karlsruher, P.E. 17103 I';c'.lt,i Road · Ntlilc I(X) · I.B I IR · I)alla~;. 'l'cxas 752.1.q · Iq]one 21d/24.q-4900 'i~RCP. 0 CONNECT 20L.F. -I- FROM E.X. 24" RCP MH. ANGLED CURB STOP IN I/IX MEDIAN. I -- -- -- :~'-RCP-F~ PROP, REMOVE EXISTING JUNCTION !PAY ITEM· I00 j STA. 162+02 I-TYPE ;'B" MANHOLE TOP = 498.70 ![.42"(IN) --493.10 E.. EX. 4'x$'(OUT)= 493.00.1 ,PAY ITEM. 475.6.1 I lo' · :-- 4e~'. 3o L. 498.14 ~62 + I~- ,8"x 8" 1- 6" G.~ I-EH. PAY ITEM ~ i i