Loading...
ST8201-CS 881118 (4) HANDWRITTEN MEMORANDUM THE CITY WITH A BEAUTIFUL FUTURE TO: ~ J O/¥,'v DATE :. GINN, INC. CONSULTING ENGINEERS November 16, 1988 Mr. Russell R. Doyle, P.E. city Engineer City of Coppell ~ P.O. Box 478 /--R~;/ Denton Tap Road Improvements from Belt Line R~ r ~ baKe_Road;_ and from Sandy LaKe Koad ~Dmar~Mr. Doyle: I am transmitting one copy each of Change Order No. 1 for each project for approval by the City Manager. These Change Orders cover the use of Cement for subgrade stabilization in lieu of the Lime which was originally specified. The end result of approval of these Change Orders will be that a net savings of approximately $14,072.10 will be realized by the City on the two projects, while achieving a finished product which is equal to that originally specified. The Change Orders have been executed by both Ginn, Inc. and L. H. Lacy Co., and may be executed by the City Manager without Council action since each is a reduction in Estimated Contract Amount, and neither exceeds a change of more than $ 10,000.00. For your review we have attached supporting documentation upon which our recommendation for approval of the Change Orders is based. Time is of the essence, since the Contractor intends to begin stabilization within the next couple of weeks and must have a definite decision within the next few days in order to avoid delays in completion of this project. I apologize for the short notice, but we have been holding this item pending the Contractor's receipt of test reports from his laboratory confirming their verbal affirmation that the proposed subgrade treatment will be acceptable. The report has just been received, and the Contractor has asked us to proceed with processing the Change Orders. As we had verbally been assured, the proposed Cement Stabilization is acceptable, and therefore we recommend proceeding with approval of Change Order No. 1 for each project at this time. Page 1 of 2 17103PrestonRoad · Suitel~ · LBII8 · Dall~,Texas75248 ® Phone214/248-4900 If acceptable to the City Manager, please have him execute the original Change Orders and return two copies: one for issuance to the Contractor; the other for our files. You should file the Original Change Orders with your Original Contract Documents. Please call me if you have any questions. Sincerely, John C. Karlsruher, P.E. Project Engineer enclosures cc: Alan D. Ratliff, City Manager Frank Trando, Deputy City Manager H. Wayne Ginn, P.E. David M. Snyder, P.E., L. H. Lacy Co. Randy Fleming J378/379 (a:dtcemco.) Page 2 of 2