Loading...
ST8201-CS 881021iSUBJECT 30 ;1 DATE REPLY SIGNED RECIPIENT REPLY ON PINK COPY RETAIN WHITE COPY SUBJECT OCT 2 I 1988 TO. REEDCON, INC. Ginn, (214) 867-5700 ]:nc. WE ARE SENDING YOU k~.Attached [] Shop drawings [] Copy of letter [] Under separate cover via_ [] Prints I~ Plans Iq Change order ~1 Sketch "SKi" ~,E 7 87014 21 OCT 88 ~~ Mr. John Karlsruher, P.E. Denton Tap Road Bridge over Cottonwood _the following items: [] Samples [] Specifications showing modification to cap reinforcing THESE ARE TRANSMITTED as checked below: ~ For approval [] Approved as submitted [] For your use [] As requested [] Approved as noted [] Returned for corrections [_~ Resubmit-- _copies for approval FJ Submit ~copies for distribution [] Return___corrected prints [] For review and comment [] [] FOR BIDS DUE 19-- PRINTS RETURNED AFTER LOAN TO US REMARKS The east drilled shaft of the northeast abutment may be moved up to 2'-0" to the east and the cap reinforcing shall be modified as shown in the sketch by adding 2 additional "A" bars to the bottom reinforcing. COPY TO SIGNED: BARS BARS CONFORM RIPRAP WITH 24' # DRILLED SHAFT FACE OF 8RIDGE SLAB T BARS NORTHEAST ABUTMENT SECTION SCALE: 1/2' = 1'-0' COTrONWOOD BRIDGE NORTHEAST ABUll~IENT REEDCON, INC OCTOBER 21, 1988 oy s~