ST8201-CS 881021iSUBJECT 30 ;1
DATE
REPLY
SIGNED
RECIPIENT REPLY ON PINK COPY RETAIN WHITE COPY
SUBJECT
OCT 2 I 1988
TO.
REEDCON, INC.
Ginn,
(214) 867-5700
]:nc.
WE ARE SENDING YOU k~.Attached
[] Shop drawings
[] Copy of letter
[] Under separate cover via_
[] Prints I~ Plans
Iq Change order ~1
Sketch "SKi"
~,E 7 87014
21 OCT 88 ~~
Mr. John Karlsruher, P.E.
Denton Tap Road Bridge over
Cottonwood
_the following items:
[] Samples [] Specifications
showing modification to cap reinforcing
THESE ARE TRANSMITTED as checked below:
~ For approval [] Approved as submitted
[] For your use
[] As requested
[] Approved as noted
[] Returned for corrections
[_~ Resubmit-- _copies for approval
FJ Submit ~copies for distribution
[] Return___corrected prints
[] For review and comment []
[] FOR BIDS DUE
19--
PRINTS RETURNED AFTER LOAN TO US
REMARKS
The east drilled shaft of the northeast abutment may be moved up to
2'-0" to the east and the cap reinforcing shall be modified as shown
in the sketch by adding 2 additional "A" bars to the bottom reinforcing.
COPY TO
SIGNED:
BARS
BARS
CONFORM RIPRAP WITH
24' # DRILLED SHAFT
FACE OF 8RIDGE SLAB
T
BARS
NORTHEAST ABUTMENT SECTION
SCALE: 1/2' = 1'-0'
COTrONWOOD BRIDGE
NORTHEAST ABUll~IENT
REEDCON,
INC
OCTOBER 21, 1988 oy s~