ST8201-CS 880523I. nte'r-Office Memo
General Telephone Company
Lewisville, Texas 75029
May 23, 1988
Mr. Alan D. Ratliff
City Manager
City of Coppell
P. O. Box 478
Coppell, Texas 75019
Subject: Relocation of Facilities, Denton Tap Road NO:RNJ:drr
Dear Mr. Ratliff:
At the City of Coppell request, GTE Southwest is now fiualizin¢~
plans to relocate existing telephone facilities in preparation
for tile upcoming Denton Tap Road widening project. An estimated
$150,000 will be required to accomplish all of the necessary
relocations. Most of the affected telephone facilities are now
located within the City of Coppell street right of way, and will
therefore be relocated at the sole expense of GTE Southwest.
There is one area, however, where the existing facilities are
located within a private easement, outside of tile city right of
way. This area is on the west side of Denton Tap Road from Sandy
Lake Road south to Southwestern Blvd. GTE Southwest requests
full reimbursement from the City of Coppell for all required
telephone facility relocations which are done within th~ private
easement·
Bids have already been taken for the relocation
easement. Barring any unforeseen circumstances,
this work will be approximately as follows:
within the
the coqt of
Low bid (flat sum)
Engineering labor
Inspector labor
Total estimated cost
$28,421
1,937
3,600
$33,958
No bill will be
a special bill for the actual
Coppell.
issued until all work is complete· At that time,
cost will be issued to the City of
DATE:
Mr: Alan D. Ratli£f - Page 2
May 2~,~ 1988
The enclosed drawing gives details of the work which will be
required. Any questions you have should be directed to me
at 318-0027.
Sincerely,
Roy N. Johnson