Loading...
ST8201-CS 880523I. nte'r-Office Memo General Telephone Company Lewisville, Texas 75029 May 23, 1988 Mr. Alan D. Ratliff City Manager City of Coppell P. O. Box 478 Coppell, Texas 75019 Subject: Relocation of Facilities, Denton Tap Road NO:RNJ:drr Dear Mr. Ratliff: At the City of Coppell request, GTE Southwest is now fiualizin¢~ plans to relocate existing telephone facilities in preparation for tile upcoming Denton Tap Road widening project. An estimated $150,000 will be required to accomplish all of the necessary relocations. Most of the affected telephone facilities are now located within the City of Coppell street right of way, and will therefore be relocated at the sole expense of GTE Southwest. There is one area, however, where the existing facilities are located within a private easement, outside of tile city right of way. This area is on the west side of Denton Tap Road from Sandy Lake Road south to Southwestern Blvd. GTE Southwest requests full reimbursement from the City of Coppell for all required telephone facility relocations which are done within th~ private easement· Bids have already been taken for the relocation easement. Barring any unforeseen circumstances, this work will be approximately as follows: within the the coqt of Low bid (flat sum) Engineering labor Inspector labor Total estimated cost $28,421 1,937 3,600 $33,958 No bill will be a special bill for the actual Coppell. issued until all work is complete· At that time, cost will be issued to the City of DATE: Mr: Alan D. Ratli£f - Page 2 May 2~,~ 1988 The enclosed drawing gives details of the work which will be required. Any questions you have should be directed to me at 318-0027. Sincerely, Roy N. Johnson Project Coordinator enc ~ cc: Mr.. John Karlsruher - Dallas, Texas - I - A/~T£-- :. ,"~ :