Loading...
ST9302-CS 990622 MEMORANDUM FROM THE DEPARTMF. NT OF ENGINEERING From: Date: RE: Mayor and City Council Kenneth M. Griffin, P.E., Dir. of Engineering/Public Works ~D~. ussio, n concerning the temporary closure of north Moore Road at ~dy Lake Road m conjunction with the Sandy Lake Road improvements The utility relocations along Sandy Lake Road are rapidly coming to a point where the paving operation will begin sometime later this summer. One area where the utility relocations have been very difficult is the Moore/Sandy Lake intersection. There have been several daily closures at that intersection to allow for minor relocations of utilities. However, there are several major utility relocations to take place in the very near future. These will necessitate a closure longer than l-day. Specifically, a sanitary sewer manhole h~ to be removed, the existing storm draln~ge manhole has to be demolished and rebuilt further north, and 2 drainage laterals to connect to the relocated storm drain manhole have to be constructed. Because of the depth of these relocations and the need to exercise greater caution worldng around the 16" gas line and other improvements in the general vicinity, it is recommended that the contractor be allowed to close off the north section of Moore Road during these relocations. Taking into account the various item~ to be performed, it is estimated that the north section of Moore Road at Sandy Lake would need to be closed three weeks to accomplish the relocations. At our monthly Sandy Lake Road meeting, various timetables were discussed. Because of impending vacation time for the job superintendent and the July 4' holiday it was determined that the optimum time to close north Moore Road would be July 6~ through July 27~. This will afford the contractor three weeks to accomplish the necessary work in the intersection. With Council concurrence, appropriate notification will be provided via the Sandy Lake Road newsletter, WebPage, Channel 19, and direct contact with the day care centers both north and south of the Moore Road intersection, the retail center at the Moore Road intersection, and the two apartment complexes on Moore Road north of Sandy Lake Road. We have also requested that the contractor provide a changeable message sign to be placed the week of June 28* to alert motorists of the road closure. In the event that their company changeable message sign is not available, we have requested that a sign slmilnr to the one utility! when Heartz Road was closed be provided. While the temporary closure of Moore Road at Sandy Lake will be an inconvenience to the traveling public, it will allow a more expedient construction of the utility relocations in the area and provide a safer work environment for the contractor and the traveling public. Staff will be available to discuss this issue at the Council meeting. 'CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"