ST8201-CS 880518 GINN, INC. May 18, 1988 Mr. Alan"D. Ratliff,'City Manager City of Coppell P.O. Box 478 Coppell, TX 75019 Re: Denton Tap Road Improvements From Sandy Lake Rd. to Denton Creek CONSULTING ENGINEERS Dear Mr. Ratliff: Enclosed are six (6) copies of the Contract Documents including the Form of Agreement, Performance Bond and Payment Bond for the above referenced project, duly executed by the Contractor, L.H. Lacy Company. Please have the copies executed by Mayor Duggan on behalf of the City and return all six copies to us. We will complete the execution of the Contracts on behalf of the City by entering the date of the Mayor's signature in all the appropriate places and return two fully executed Contracts to you. The pre-construction conference for this project was held in our offices at 1:30 PM, Tuesday, May 17, 1988 and minutes will be forwarded when they are typed. We anticipate issuing a "Notice- To-Proceed" order to the Contractor within the next week. The effective date of the order should be some time before the 15th of June. We are also enclosing the Original Cover Sheet for the project to be signed by the Mayor. Please return it with the executed Contracts. Should you have any questions, please contact us. Sincerely, H. Wayne Ginn, P.E. JCK/HWG/dsp enclosures CC: Alan D. Ratliff Steve Goram/ Larry Jackson Dorothy Timmons Frank Trando David Parry H. Wayne Ginn, P.E. Inspection Dept. File 379 17103 Preston Road · Suite 100 · LB II8 · Dallas, Texas 75248 · Phone 214/248-4900 GINN, INC. CONSULTING ENGINEERS May 18, 1988 Mr. Alan D. Ratliff, City of Coppell P.O. Box 478 Coppell, TX 75019 City Manager Denton Tap Road Improvements From Belt Line Rd. to Sandy Lake Rd. Dear Mr. Ratliff: Enclosed are six (6) copies of the Contract Documents including the Form of Agreement, Performance Bond and Payment Bond for the above referenced project, duly executed by the Contractor, L.H. Lacy Company. Please have the copies executed by Mayor Duggan on behalf of the ' City and return all six copies to us. We will complete the execution of the Contracts on behalf of the City by entering the date of the Mayor's signature in all the appropriate places and return two fully executed Contracts to you. The pre-construction conference for this project was held in our offices at 1:30 PM, Tuesday, May 17, 1988 and minutes will be forwarded when they are typed. We anticipate issuing a "Notice- To-Proceed" order to the Contractor within the next week. The effective date of the order should be some time before the 15th of June. We are also enclosing the Original Cover Sheet for the project to be signed by the Mayor. Please return it with the executed Contracts. Should you have any questions, please contact us. Sincerely, H. Wayne ' P.E. JCK/HWG/dsp enclosures CC: Alan D. Ratliff Steve Goram ~ Larry Jackson Dorothy Timmons Frank Trando David Parry H. Wayne Ginn, P.E. Inspection Dept. File 378 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900