First United-CS020208 MEMORANDUM
FROM THE
DEPARTMENT OF PUBLIC WORKS
To--
Date:
RE:
Larry Davis, Construction Inspector Engineering
Larry Morton, Streets Division Engineering
February 8, 2002
Walk-thru First United Methodist Church, Section 2 Parking
PAVING
1. Rout and seal random cracks in approaches.
CITY OF COPPELL PUBLIC gVO~.K$ DEPARTMENT
MESSAGE
CONF I RMAT I ON
02/'08/02 14: 5?
ID=CITY OF COPPELL
DATE
02/'08
S,R-TIME DISTANT STATION ID MODE PAGES
00~53'' 9?2 304 7041 CALLING 03
RESULT
OK 0000
9?2 ~ 3570
CITY 0~: COF~ELL ENGR. DEPT. ~ SRU CT~
T H I · c I T Y · o F
COPFELL
MEMORANDUM
FROM THE
DEPARTM~.NT OF ENGINEERING
To.'
F~m:
l~te:
Ken Griffin, Director of Engineering
Glenn Hollowell, Assr. Direetor of Public Works
Greg Jones, Chief Build~ng Official
Travls Crump, Fire Marshal
Larry Davis, Construction Inspector ~/~
February 6, 2002
WALK-TI. IRU for First United Method/st Church, Section 2 Parking
A final walk-thru for streets, utilities and drainage on the referenced project bas been
scheduled for
Friday, Fcbrum~' 8, 2002 at 9:00 a .m.
If I can be of further assistance please let me know.
cc: Lee Stone, Commercial Inspector
Roland Asebedo, A~st. Fire Marshal
Bob Colou, Hill & Wilkinson
~ , Eric ROyal, Royal Geoeral Coutractors
fax 214-29~o {{{~
fax 972-929-1929
IC~ O~ COPPELL ENGINEERING · £XC£LLENCIK il'/Dg~GN'*