Loading...
ST8201-CS 870202GINN, INC. February 2, 1987 CONSULTING ENGINEERS City of Coppell P.O. Box 478 Coppell, TX 75019 Attn: Steve Morton Re: Final Acceptance Sandy Lake/Denton Tap Intersection Dear Mr. Morton: Final acceptance to the above referenced project has been recognized, upon receipt of the one-year maintenance bonds and final waiver of lien, dated December 18, 1986. Enclosed are copies of the bonds and waiver of lien with a maturity date of December 18, 1987. Sincerel~~ Randy Fleming Chief Inspector /ss Enclosures cc: Kevin Peiffer 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900 TO ADDRESS CiTY: ATTENTION I ? TER OF TRANSMITT/ ~cE:SE BE ADVISED ARE SEND~r~G YO',-i ~ AT"r-~CHE5 ~ PRINTS ~ PLANS ~ ARTWORK [] PROOFS UNDEF~ SEPARATE CO'v'ER VIA ~ SHOP DRAWINGS [] SAMPLES ?i PHOTOGRAPHS [] COPY OF LETTER THE FOLLOWING: ~ SPECIFICATIONS [] CHANGE ORDER THESE ARE BEING TRANSMITTED AS INDICATED BELOW: '~AS REQUESTED [] FOR APPROVAL FOG YOURUSE [] FOR YOUR COMMENTS [] FOR BID(SIDUE [] APPROVED ASIS [] APPROVED WiTH CORRECTIONS [] RETURNED WiTH CORRECTIONS ~ RESUBMIT COPIESFOR APPROVAL [] SUBMIT COPIES FOR DISTRIBUTION [] RETURN CORRECTED [] RETURNED AFTER LOAN TO US [] COMMENTS SIGNED MAINTENANCE P. OND Bond No. 400HE 9374 F~NOW ALL MEN BY TI-1ES~% PI[ESENTS, That xve, MIDWEST BRIDGE CORPORATION, 802 N. Kealy, Lewisville, Texas 75067 , as Principal, and S$~ P'AUL FIRE AND MARIN~ INSUK~NCE COMPAN~f' incorporated uhder the laxvs of the State of Minnesota , as Surety and firmly bound unto CIYY OF COPPELL/ TEXAS (hereinafter called' thc Obi/gee) in the penal sum of Four Hundred Eighty-One Thousand Eight Hundred Ninety-Three 65/100 ............ 481,893.65 ..... y Dollars, to. which payment well and truly to be made, we hereby bind themselves, their successors, assigns and legal representative, s firmly by these presents. THE CONDITION OF THIS OBLIGATION IS SUCH, into a contract with the Obligee dated That whereas, the Principal ent'e.red for Construction of Sandy Lake/ Denton Tap Improvements AND, WHEREAS, .the Obligee requires a guarantee from the Principal against defect- ive materials and worknaanship in connection with said contract: NOW, THEREFORE, if the Principal shall make any repairs or replacements which may become necessary during the period of one (1) year. from date of eccep/'ence because .of defective rnaterials or workmanship in connection with said contract, of which defectiveness the Obligee shall give the Principal and Surety written notice within fifteen (15) days after discovery thereof, then this obligation shallbe void; ' otherwise it' shall be in 'full force ~nd effect. 'All suits at law or .proceedings in equity to recover on this bond must be instituted within twelve (12) months after the expiration of the maintenance period provided for herein. Signed, sealed and dated this 7th day of August 19 86 MIDWEST. I!P,~IDC~:~ CORPOR~N ST. PAUL FIR~ ~ ~RINE INSU~CE COMP~ For enf,cam~n ol h< au'~hemicit,, of this Pov. et of ~.llor ne~. >ou ma~ telephone Ioll lr~ 8~32S-:1 $9 and ask for ~ 0 ~7 ~:'7~ the Po~er of Attorney Clerk Pleamrefer to the Ceruficate of Au:horit~ No. andthen~edindixidu~l(~ GENERAL P~VER OF ATTORNEY - CERTIFIED COPY (Original on File at Home Office of Compan). Sec Certificmion.) KNO%~ AEI MEN B~ THESE PRE~ENI~: Tha: SI. Paul Fire and Marine Insurance Company. a corpo:ation organized and existing under the la~- :,:' ibc Thomas M. Finholm, Kevin J. McGreevy, Michael T. Kelly, Eric Van Buskirk, LaVonne Rinke, Jerome J. Reardon, individually, Kansas City, Missouri NOT TO EXCEED IN PENALTY TFr~ SUM, OF TWENTY FIV~ MILLION ($25,000,000) EACH and: ne execution of a!l such mslrumcnnsI in pursuance of these presems, shat! be as binding upon..aid SI. Paul Fart. and Marine Insurance Compan:,, as fully and ampb. ~o ail int~ntq and purpos¢~, as if the same had be~n dui) executed and acknoa lodged :'> ns regularl5 elected officers at ~ts ,,rincipal office. This Pox~er of Aitorne~ is execmed..' .: ma,, be certified Io and ma~. be re'.oked, pursuan~ ~o and h.x au~ho:~;) of .\tittle V,-Secfion 6ICI, of the B.x-Law5 adopted h> ihe Board o~ Directors o!~ I. PA I.~ 1: IRE A h D MARINE INS[ RANCE COMI~.N I at a meeting called and held on the 23rd da5 of JanuarS, 1970, of v.hich the folloaing is a true transc'.Tl ol said Section 64C): Fur[her. this Power of Altorney is signed and sealed by facsimile pursuant to re:,o]ution of the Board of Directors of said Company adopted at a meeting duly called and held on the 6th da)' of Ma), 1959, of which the folloaing Is a true excerpt: "Nov. therefore the signatures of such officers and the seal of the Compan) ma~, be affixed to any such power of attorney or any certificale relating thereto b) facsimile, and an:, such po'.,,er of auorney or certificale bearing such facsimile signalures or facsimile seal shall be valid and binding upon the Compan> and any such power so e.xeculed and certified by facsimile signatures and facsimile seal shall be salad and binding upon the Company in the future with respect to any bond or undertaking to which it is anached." IN TESTIMONY WHEREOF. St. Paul Fir~ nnd MaRne lnsar~nce Comlmny has caused this instrument to be signed and its corporate seal to be affixed by its authOtUed officer, this I st day of March, A.D. 1984. ST. PAUL FIRE AND MARINE INSURANCE COMPANY STATE OF M1NNESOTA~ ~ County of Ramses, ~ ss. ,19 86 , before me came Ihe individual who executed the preceding instrument, to me On this 28',',',',',',',',','~h da,.' of Augu8 t personall5 known, and. b~ing h~ me dul5 saorn, ~aid Ihsl be/sh~ i$ lbe therein d~ribed and authorized officer of ~1. Pm~I Fi~ m~d ~8ri~e l~m.~ ~mpan3: that the s~l affix~ to smd instrumen: ls the Corporate ~al of Said Company: that the ~id Corporale Seal and his/her sig ature were duly affix~ by order of the B~rd of Directors of ~id Company. MARY C. CLANCY, Notau Public. Ramsey Coun y. MN My Commissi~ Expires November 1, 1~ CERIIFICATION I, the undersigned officer of St. Paul Fire and Marine Insarauce COlpan.s. do hereby cerlify that 1 have compared the foregoing copy of the Power of Attorney and affidavit, and the cop) of the Sec on of the By-Laws of said Company as set forth in said pov, er of Attorney,, with the ORIGNAL$ ON FILE IN THE HOME OFEICZ OF SAID COMPANY. and that the same are correct transcripts thereof, and of the whole of the s~id originals, and that the said Power of Anorne~, has not been revoked and is now in full force and effect. 7th dayof August ,19 86 Secretary FINAL WAIVER OF LIEN To All Whom It May Concern: WHEREAS, the undersigned has been employed by City of Coppeli to furnish labor and materials for Hiqhway Construction and Utility work work under a contract for same for the improvement of the premises described as ' Sandy Lake/Denton Tap Intersection inthe City Dallas (City-Village) of of which City of Coppell Coppell ,Stateof Texas , County of .is the owner. NOW, THEREFORE, this 5th dayof December ,19 86 , for and in consideration of the sum of :' $ 4 81,8 9 3.6 5 Dollars paid simultaneously herewith, the receipt whereof is hereby acknowledged by the undersigned, the under- signed does hereby waive and release any lien rights to, or claim of lien with respect to and on said above- described premises, and the improvements thereon, and on the monies or other considerations due or to become due from the owner, on account of labor, services, matedat, fixtures, apparatus or machinew heretofore or which may hereafter be furnished by the undersigned to or for the above-described premises by virtue of said contract. Midwest Bridqe CorD. ISEAL) TITLE: Vice-President ,5EAL~ DcsiSned 8~. The Construct;on tnd~st,'y A~,~r$ Comr~,t~ee (CIAC) CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS AIA Document OV,. NER ARCHITECT CONTRACTOR SURETY OTHER RECc.,', ' - B ',356 TO ~O',s her - ] ARCHITECTS PROJECT NO: CONTRACT FOR: Construc1'ion of Sand,. Lake/ Denton Tap Improve~enms PROJECT: name, address, CONTRACT DATE: ~ ~:n or ~u-r Ma4 3~, 1955 S',ate of: CoLmt'~ of: The under:;igned. Fu,?L, ant ~o Article c~ of the General Condhion:, of the Contract for Con-lruction, AI~ Document A201, hereb~, certife,, thaL except as listed below, he has pa,d in full or has other,.,.i'-e satisfied all obhgation,~ for ail materials and equ~pmeqt furnished, for alt s~ork, labor, and ser,.ices performed, and for all known indebtedne(( and ctaims against the Contractor for damages arising in any manner tn connection ',~.ith the performance of the Contract referenced abo,.e for ',;hich the Owner or his property might in any ,.say be held responsible. EXCEPTIONS: !If none, '.','rite "None". If required by the Owner, the Contractor shall furnish bond satisfactor'~ to the Owner fo,' each exception.) SUPPORTING DOCUMENTS ATTACH~'D HERETO: 1. Consent of Surcty to Final Pa'~r ent. Whenever Surety is in,.olved, Consent of Surety is required. AIA DOCUMENT G707, CONSENT OF SURETY, may be used for this purpose. Indicate attachment: lyes ) (no ). The following supporting documents should be at- tached heret( if required by the Owne~': 1. Contractor's Release or VVaiver of Lien~, condi- tional upon receipt of final payment. 2. Separate Releases or Wakers of Liens from Sub- contractors and material and equipment sup- pliers, to the extent required by the Ov, ner, ac- companied b,'. a list thereof. 3 Conlractor's Affida',t of Relea'~e of Liens DOCUMENT GTO6A' CONTRACTOR: MIDWEST BRIDGE CORPORATION Address 832 North Keal i, Lewisvi lie TX Subscribed and sworn to before me tifi~ ! ! M, Commisqon Exp(re,: 75063 CONSENT OF SURETY COMPANY TO FINAL PAYMENT AIA DOCUMENT G707 OWNER ARCHITECT CONTRACTOR SURETY OTHER PROIECT Iname. address) TO tOwner) L CONTRACTOR: ARCHITECT'S PROJECT NO: uon~truct ion of .... CONTRACT FOR: ~ - ~:... La~e/ DeriTor~ '~ ~ CONTRACT DATE: On or %out ,ia, "' :q~= In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the (here ,nsert name and address of Surely Company ~T. :AUL FIRE AhD k~A-]INE INSURANCE COMFA!~Y, 385 Was~incTon , SURETY COMPANY, ~e,,£ville, Texas 753e3 MID'~EST BRiD~ gOR. ~mATI~N, 803 North Keal,, , CONTRACTOR, hereby approves of the final payment Io the Contractor, and agrees that final payment lo the Contractor shall not relieve the Surety Compan) of any of its obligations to Ihe,e ,nsen name and addre,s of Ownerl T-E ~iT~ 3F CSFFE__, 7£XAS, '' , OWNER, as set forth in the said Surety Company's bond. IN WITNESS WHEREOF, the Surety Company has hereunto set its hand this ; ~, ru day' of September, 19 ST. PA3L FIX;E AND MARINE INSURANCE CO,~ ,-,. Surety Company