Four Seasons 1-CS 920513The City Witl~ A Beautiful Future
May 13, 1992
P.O. Box 478
Coppell, Texas 75019
214-462-0022
Mr. Jim Koch
Pacheco Koch Co.
9401 LBJ Freeway, Ste. #250
Dal~53~/
Re:~Four seas~s
'F~ceptance
Dear Mr. Koch:
A final inspection of the above referenced project has been confirmed by
representatives of the City of Coppell.
Paving and utilities have been verified and are in compliance with the
City of Coppell standard requirements.
Please follow the Erosion Control Ordinance as adopted by the City of
Coppell during the maintenance bond period.
The one-year maintenance bonds and as-built drawings have been received
from the contractor. Maturity on the bonds will be one year from the date
of this letter (May 13, 1993).
Sincerely,
Larry Davis
Engineering Development Inspector
ChD/bd
cc:
Kenneth M. Griffin, P.E., City Engineer
M. Shohre Daneshmand, P.E., Civil Engineer
Gary L. Slab, Director of Planning and Community Services
Howard Pafford, Water Superintendent
Rey Gonzales, Street Superintendent
Rick Wieland, Parks and Recreation Manager
Taryon Bowman, P & Z Coordinator
Ben dela Cruz, Engineer Technician
Harrison Hankins, NAPCON