Loading...
ST8201-CS 870917_The City With A Beautiful Future R O. Box 478 Coppell, Texas 75019 214 - 462-9010 September 17, 1987 John C. Karlsruher, Ginn, Inc. Coppell Public Works / Carl Bass Cc~nents on Denton Tap Road Improvements Cc~ents are as follows: 1. Existing 8" water main does not lay in the manner which is indicated on the plans at the intersection. Instead, the existing 8" water main runs parallel to the 16" on the southeast corner. 2. Left out existing 4" water main on wast side of Denton Tap. Would like to know how the 4" water line will he effected by this project? The depth of this line xraries from 2½ feet to 3½ feet. The water meter at the intersection of Denton Tap and Parkway Blud. is indicated, but the 2½ service coming from the w~st side of Denton Tap coming off of the 4" was not indicated. Between station 194+00 to station 199+00, just south of Cottonwood Creek, the 15" sanitary sewer that crosses Denton Tap is not in- dicated. If you have any questions or additional co~nts, please contact m~ at my office. C(~/bb cc: Steve Goram, Director of Public Works