Loading...
First United-CS 990211COPPELL STREETS DIVISION DATE: February 11, 1999 TO: Larry Davis, Construction Inspector FROM: Brent Adams, Streets Division RE: Walk-thru First Methodist Church W.Parking 2/10/99 Listed below are Street Division comments relative to walk-thru. 1. VanBebber Driveway: Seal curb returns both east & west side. ADA ramp west side driveway toe stub at sidewalk. Apron need control joint at center and to the east side of driveway. Redwood header needs sealed. Lot ADA on east side of driveway saw cut and re-form entire ADA ramp o Deficiencies marked in white paint. VanBebber/Heartz: ADA ramps are poured on top of paver lug. This is wrong. Pavers need cut to match. Seal redwood at the top of ADA ramps. Deficiencies marked in white paint. Heartz: sidewalk ramp curb needs to be sealed. Seal all sidewalk redwood headers. 4. Heartz/Bethel School: ADA ramp wrong also. Bethel School driveway: rout & seal random cracks across Driveway. Seal curb returns. Seal along existing concrete on Bethel School. MESSAGE CONF I RMAT I ON 02/11/9~ 10:~9 ID--C~TY OF COPPELL DATE 02/11 S,R-TIME 00'~1" DISTANT STATION ID MODE PAGES RESULT CITY OF COPPELL CALLING 02 OK 0000