First United-CS 980824COPPELL, TEXAS 75019
Mr. William Anderson, P.E.
Dowdey, Anderson & Associates, Inc.
$225 Village Creek Dr., Suite 200
Piano, TX 75093
First United Methodist Church
Development Fee Assessment
RO. Box 478
Coppell, Texas 75019
972-462-0022
August 24, 1998
Dear Mr. Anderson:
Enclosed is a copy of the City of Copper Development Fee Assessment table, along with a copy
of the Development Fee calculations for the referenced development.
Please make payment to the City of Copper in the amount of $18,158.76 and forward to the
Finance Depasiment along with a copy of the Fee Assessment table. This mount is a portion
of the assessed fees which need to be paid prior to Council approval. Please refer to attached
table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office
so the construction inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Depmhaent will help us to verify the
payment of required fees and insure a successful beginning of this project. We look forward
to working with you on this project. If you have any questions, please contact me.
Sincerely, .
Michael A. Martin, P.E.
Assistant City Engineer
CC:
Seunifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Glenn HolloweR, Assistant Director of Public Works
Greg Jones, Chief Building Official
Gary Sims, Director of Leisure Services
D VELOPMENT FEE TABLE
Project: First United Methodist Church
Date: 8/24/98
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $8,325.00 $8,325.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $150.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic)' $192.15
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $3,074.40
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $35.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $60.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $3,600.00 $3,600.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 N/A
(100% due prior to Council Approval)
Roadway Impact Fee $6,233.76 $6,233.76
(100% due prior to Council Approval)
Street Light Fee Information not
(100 % due prior to Acceptance of Project available at this time
Street Sign Fee Information not
(100% due prior to Acceptance of Project available at this time
Construction Inspection Fee Need submittal of
development contracts
TOTAL $21,770.31
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $18,158.76
DEVELOPMENT FEE WORKSHE,-I'
PROJECT: First United Methodist Church
DATE: 8/24/98
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
1 - 2 inch -- 8 ESU's
1 - 2 inch = 8 ESU's
= ESU's
I - 8 inch -- 2.5 ESU's
Total #: 18.5 ESU's @ $450.00 ea.
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 3 ' Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: I Domestic Meter(s) @ $192.15
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total #: 1 Irrigation Meter(s) @ $192.15
Total #: 0 Additional Irrigation Meter(s) @
Total #: 1 Fireline Meter(s) @ $2,882.25
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total 0: 1 Meter(s) @ $35.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 2 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's:
8
@ $450.00 ea.
Wastewater Tap Inspection Fee:
Total #: 1 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 1 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
Page I
$8,325.00
$150.00
$192.15
$192.15
$0.00
$2,882.25
$35.00
$60.00
$3,6O0.00
$50.00
$50.00
DEVELOPMENT FEE WORKSHEI=r
Park Fee (For Residential Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A
N/A
Single-family @ $150.00 / Lot
Multi-family @ $75.00 ! Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after June 23, 1992:
Single-family @ $350.00 / Lot
Multi-f~mily @ $350.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after October 26, 1993:
Single-family @ $1285.00 / Lot
Multi-family ~} $1285.00/Unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due pdor to final acceptance of development)
N/A
N/A
N/A
N/A
N/A
N/A
$6,233.76
Information not
available at this time
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Information not
available at this time
Construction
Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Need submittal of
development contracts
Page 2
ROAx, WAY IMPACT FEE CALCULA t'IONS
PROJECT:
DATE:
First United Methodist Church
8/24/98
ROADWAY IMPACT FEE:
Service Area * 6
Category ** Institutional
Land Use ** Church/Synagogue
Bulldiag Size (Sq. Ft.) 39,960
Development Units ** 39.96
Vehicle Miles per Developmem Unit ** 0.52
Fee per Vehicle Mile *** $300
Roadway Impact Fee due -- (Development Units) x
Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $6,233.76
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)