Loading...
First United-CS 980824COPPELL, TEXAS 75019 Mr. William Anderson, P.E. Dowdey, Anderson & Associates, Inc. $225 Village Creek Dr., Suite 200 Piano, TX 75093 First United Methodist Church Development Fee Assessment RO. Box 478 Coppell, Texas 75019 972-462-0022 August 24, 1998 Dear Mr. Anderson: Enclosed is a copy of the City of Copper Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Copper in the amount of $18,158.76 and forward to the Finance Depasiment along with a copy of the Fee Assessment table. This mount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Depmhaent will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, . Michael A. Martin, P.E. Assistant City Engineer CC: Seunifer Armstrong, Finance Director Doug Stevens, Engineering Technician Glenn HolloweR, Assistant Director of Public Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services D VELOPMENT FEE TABLE Project: First United Methodist Church Date: 8/24/98 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $8,325.00 $8,325.00 (100% due prior to Council Approval) Water Tap Inspection Fee $150.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic)' $192.15 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $3,074.40 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $35.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $60.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $3,600.00 $3,600.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 N/A (100% due prior to Council Approval) Roadway Impact Fee $6,233.76 $6,233.76 (100% due prior to Council Approval) Street Light Fee Information not (100 % due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee Need submittal of development contracts TOTAL $21,770.31 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $18,158.76 DEVELOPMENT FEE WORKSHE,-I' PROJECT: First United Methodist Church DATE: 8/24/98 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 1 - 2 inch -- 8 ESU's 1 - 2 inch = 8 ESU's = ESU's I - 8 inch -- 2.5 ESU's Total #: 18.5 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 3 ' Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: I Domestic Meter(s) @ $192.15 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total #: 1 Irrigation Meter(s) @ $192.15 Total #: 0 Additional Irrigation Meter(s) @ Total #: 1 Fireline Meter(s) @ $2,882.25 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total 0: 1 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 2 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 8 @ $450.00 ea. Wastewater Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 1 Lots @ $50.00 ea. (100% due prior to issuance of building permit) Page I $8,325.00 $150.00 $192.15 $192.15 $0.00 $2,882.25 $35.00 $60.00 $3,6O0.00 $50.00 $50.00 DEVELOPMENT FEE WORKSHEI=r Park Fee (For Residential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A N/A Single-family @ $150.00 / Lot Multi-family @ $75.00 ! Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: Single-family @ $350.00 / Lot Multi-f~mily @ $350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: Single-family @ $1285.00 / Lot Multi-family ~} $1285.00/Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due pdor to final acceptance of development) N/A N/A N/A N/A N/A N/A $6,233.76 Information not available at this time Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not available at this time Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Need submittal of development contracts Page 2 ROAx, WAY IMPACT FEE CALCULA t'IONS PROJECT: DATE: First United Methodist Church 8/24/98 ROADWAY IMPACT FEE: Service Area * 6 Category ** Institutional Land Use ** Church/Synagogue Bulldiag Size (Sq. Ft.) 39,960 Development Units ** 39.96 Vehicle Miles per Developmem Unit ** 0.52 Fee per Vehicle Mile *** $300 Roadway Impact Fee due -- (Development Units) x Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $6,233.76 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study)