Loading...
First United-CS 980609COPPELL, TEXAS 75019 John Rosenburg First United Methodist Church 420 Heurtz Road Coppell, TX 75019 First United Methodist Church (Parldng Lot) Development Fee Assessment Box 478 Coppelk Texas 75019 972-462-0022 June 9, 1998 Dear M Rosenburg: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the am $3,600.00. and forward to the Finance Depaxtment along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. . Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beg!oning of this project. We look forward to working with you on this project. If you have any questions, plgase contact me. Sincerely, Michae-l'A. Martin, P.E. Assistant City Engineer CC: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Glenn Hoilowell, Public Works Greg Jones, Chief Building Official Gary Sims, Dir. Leisure Services DEVELOPMENT FEE TABLE Project: First United Methodist Church (Parking Lot) Date: 6/9/98 TOTAL FEES DUE Water Impact Fee $3,600.00 (100% due prior to Council Approval) Water Tap Inspection Fee $50.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $0.00 (100% due at Issuance of Water Meter) Water Meter Fee (Lrrigation/Fireline) $192.15 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $0.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $30.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $0.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $0.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $0.00 (100% due at Issuance of Building Permit) Park Fee $0.00 (100% due prior to Council Approval) Roadway Impact Fee $0.00 (100% due prior to Council Approval) Street Light Fee N/A (100% due prior to Acceptance of Project Street Sign Fee N/A (100% due prior to Acceptance of Project Construction Inspection Fee $4,818.14 TOTAL $8,690.29 DEVELOPMENT FEE WORKSHEET PROJECT: First United Methodist Church (Parking LoO DATE: 6/9/98 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): I - 2 inch = 8 Total #: 8 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: I Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Domestic): Total 0: 0 Domestic Meter(s) @ (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation/Fireline): Total #: I Irrigation Meter(s) @ Total #: 0 Additional Irrigation Meter(s) @ Total #: 0 Fireline Meter(s) @ (100% due prior to issuance of water meters) $192.15 Water Meter Deposit Fee (Domestic): Total #: 0 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total 0: 1 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ES 0 $450.00 ea. Wastewater Tap Inspection Fee: Total 0: 0 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 0 Lots @ $50.00 ea. (100% due prior to issuance of building permit) ESU's ESU's ESU's ESU's $3,600.00 $50.00 $o.oo $192.15 $o.oo $o.oo $0.00 $30.00 $o.oo $0.00 $0.00 Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved prior to June 23, 1992: Single-family @ $150,00 / Lot Multi-family @ $75.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: Single-family @ $350.00 / Lot Multi-family @ $350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: Single-family @ $1285.00 / Lot Multi-family @ $1285,00 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T,U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) $0,00 $0.00 $0.00 $0.00 $0.00 $0.00 $o.o0 N/A N/A Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) $4,818.14 Page 2 WFr. L~MI F- O. 035820