Loading...
First United-CS 880518COPPELL PUBLIC WORKS May 18, 1988 Steve Goram, Director of Public Works \~ Howard Pafford, Water Utilities Foreman Review of f~re line for First United Methodist Steve, I have reviewed this site plan and see no problem with vault designs, but I do have three items I am concerned about. Those items are as follows: 1) The tapping valve and valves shown in the vaults are noted as Mueller and construction details specify waterous or approved equal. 2) ~lso on the Fire Dept. connection (F.D.C.) is this to be freeze protect and who is to maintain. Also, it shows no valve for maintenance purposes of this F.D.C.. 3) The last item may or may not be argumentative. They are utilizing the tapping valve for control valve on back side of double check, which standards specify to be in vault with double check. ~P/Yll would like to discuss these items~ase advise~ Attachment COPPF. Lr. PUBLIC WORKS May 18, 1988 Steve Goram, Director of Public Works Howard Pafford, Water Utilities Foreman Review of fire line for First United Methodist Steve, I have reviewed this site plan and see no problem with vault designs, but I do have three items I 8~n concerned about. Those items are as follows: 1) The tapping valve and valves shown in the vaults are noted 'as Mueller and construction details specify waterous or approved equal. 2) ~lsoe%m tbs_Fire Dept. co~necti~ {F.D.~Cf~h&~ ~o be freeze protect and who ~ ~~ ~, it~ no~ '~al~e~oWmaintenance purposes of 3) The last~ may or ma~ be ar~u~ntative. They are utilizing the tapping valve fo~c~n~ol valv~b~ ~ ~le which st~d~ s~cify ~ check, ~o ~ ~~t~ ~o~e ~( ~ ~ If you would like to discuss these items, please advise. Attac¥~ent