Dear Mr. Cook:
Attached please find a list of the development fee assessment related to
the above referenced project dated June 10, 1991, revised on June
28,1991. This revision reflects the impact fees charged for irrigation
meter.
Please provide a check in the amount of $132,874.80 made payable to the
City of Coppell and forward it to the attention of Ms. Carolyn Bebermeyer,
Finance Department, no later than July 16, 1991.
The development inspection fee (not included in the above figure) must be
paid to the City of Coppell prior to the preconstruction meeting. This
fee is equal to 2% of the construction cost.
If you have any questions, please contact Ben dela Cruz or myself at (214)
393-1016. We appreciate your timely attention, and look forward to
working with you on this project.
Sincerely,
Z- f L__oM~. Cm%ohre Daneshmand
Acting City Engineer
MSD/bd
cc:
Gary L. Sieb, Director of Planning and Community Services
Steve Goram, Director of Public Works
Larry Davis, Construction Inspector
Taryon Bowman, P & Z Coordinator
Carolyn Bebermeyer, Finance Department
James Koch, Pacheco Koch Consulting Engineers
Date:
Project:
CITY OF COPPELL
DEVELOPMENT FEES
(Revised Date: June 28, 1991)
June 10, 1991
Four Seasons at Royal Lane & Thweat Road
Park Fee Assessment
Water Impact Fee
Water Tap Inspection Fee
Wastewater Impact Fee
Sewer Tap Inspection Fee
(100% due prior to issuance of
building permit)
Street Sign Assessment (see attached)
Street Light Assessment
($292.60 X 8 poles)
(see attached)
Roadway Assessment
591.12 ft. ($200 F.F.)/
Sandy Lake Road
Street Cut Permit
+ (2% of construction cost)
in the amount of $
TOTAL AMOUNT DUE:
TOTAL DUE BY 7-16-91
TOTAL FEES
NA
$12,210.00
$ 2OO.0O
$ 3,376.00*
PAYABLE BY
7-16-91
$12,210.00
NA
2,340.80 $ 2,340.80
$118,224.00
$118,224.00
$ 100.00 $ 100.00
To be To be
determined determined
$136,450.80
(Plus 2% Const. Cost)
$132,874.80
$132,874.80
(Plus 2% Const. Cost)
NOTE:
THIS PROPERTY IS IN THE COPPELL MUNICIPAL DISTRICT #1. THE
WASTEWATER IMPACT FEE SHALL BE ASSESSED, BUT SHALL NOT BE
COLLECTED UNTIL SUCH TIME AS AN INTERLOCAL AGREEMENT IS MADE
BETWEEN THE CITY AND MUD.
FOURSE1
Assessment_
'l'h~ fall. ~wll,g nssessme~)t is being made in accordance with the
{:[l:y of Coppe!i. Subdivision ordinance Appendix A Chapter VI,
The Eot.towinK figures were supplied by T.P. & L. for
estimating this assessment.
,,i;2()2.¢)0 i)o)' I lf~,ht
You a,:~e, be:in5 asRessed
$292.60 x ~ lights
For every 200 feet of roadway.
for ~ ft. of roadway,
which totals
~,l%efore lights are installed contact Public Works
Steve (]ormu, D.[rectOr o[! Public Works or Per Birdsall,
to hnve lighting plan approved.
Street Foreman
HI~IOiIAliDUll
February 19, 1991
Shohre Danesbnmnd, Acting City Engin~
ReyGonz&les, Street Superintenden~
Four Seasons - Street Light Assessment
Attached is the assessment for street lights for this project.
There are no signs related with this project so this is the only
assessment from this Division.
RG/mp
FOURSEAS.RG