Loading...
Four Seasons 1-CS 910628 (2),~ The City With A Beautiful Fut,. June 28, 1991 ~' 2777 S t e~wa~ Thweat Road P.O. Box 478 Coppell, Texas 75019 214-462-0022 JUL 0 1991 {! PUBLIC WORKS Dear Mr. Cook: Attached please find a list of the development fee assessment related to the above referenced project dated June 10, 1991, revised on June 28,1991. This revision reflects the impact fees charged for irrigation meter. Please provide a check in the amount of $132,874.80 made payable to the City of Coppell and forward it to the attention of Ms. Carolyn Bebermeyer, Finance Department, no later than July 16, 1991. The development inspection fee (not included in the above figure) must be paid to the City of Coppell prior to the preconstruction meeting. This fee is equal to 2% of the construction cost. If you have any questions, please contact Ben dela Cruz or myself at (214) 393-1016. We appreciate your timely attention, and look forward to working with you on this project. Sincerely, Z- f L__oM~. Cm%ohre Daneshmand Acting City Engineer MSD/bd cc: Gary L. Sieb, Director of Planning and Community Services Steve Goram, Director of Public Works Larry Davis, Construction Inspector Taryon Bowman, P & Z Coordinator Carolyn Bebermeyer, Finance Department James Koch, Pacheco Koch Consulting Engineers Date: Project: CITY OF COPPELL DEVELOPMENT FEES (Revised Date: June 28, 1991) June 10, 1991 Four Seasons at Royal Lane & Thweat Road Park Fee Assessment Water Impact Fee Water Tap Inspection Fee Wastewater Impact Fee Sewer Tap Inspection Fee (100% due prior to issuance of building permit) Street Sign Assessment (see attached) Street Light Assessment ($292.60 X 8 poles) (see attached) Roadway Assessment 591.12 ft. ($200 F.F.)/ Sandy Lake Road Street Cut Permit + (2% of construction cost) in the amount of $ TOTAL AMOUNT DUE: TOTAL DUE BY 7-16-91 TOTAL FEES NA $12,210.00 $ 2OO.0O $ 3,376.00* PAYABLE BY 7-16-91 $12,210.00 NA 2,340.80 $ 2,340.80 $118,224.00 $118,224.00 $ 100.00 $ 100.00 To be To be determined determined $136,450.80 (Plus 2% Const. Cost) $132,874.80 $132,874.80 (Plus 2% Const. Cost) NOTE: THIS PROPERTY IS IN THE COPPELL MUNICIPAL DISTRICT #1. THE WASTEWATER IMPACT FEE SHALL BE ASSESSED, BUT SHALL NOT BE COLLECTED UNTIL SUCH TIME AS AN INTERLOCAL AGREEMENT IS MADE BETWEEN THE CITY AND MUD. FOURSE1 Assessment_ 'l'h~ fall. ~wll,g nssessme~)t is being made in accordance with the {:[l:y of Coppe!i. Subdivision ordinance Appendix A Chapter VI, The Eot.towinK figures were supplied by T.P. & L. for estimating this assessment. ,,i;2()2.¢)0 i)o)' I lf~,ht You a,:~e, be:in5 asRessed $292.60 x ~ lights For every 200 feet of roadway. for ~ ft. of roadway, which totals ~,l%efore lights are installed contact Public Works Steve (]ormu, D.[rectOr o[! Public Works or Per Birdsall, to hnve lighting plan approved. Street Foreman HI~IOiIAliDUll February 19, 1991 Shohre Danesbnmnd, Acting City Engin~ ReyGonz&les, Street Superintenden~ Four Seasons - Street Light Assessment Attached is the assessment for street lights for this project. There are no signs related with this project so this is the only assessment from this Division. RG/mp FOURSEAS.RG