Loading...
First United-WO 981217Phone lqumber: (l-h~) ' (WK): - Check for: Accuracy test: Meter Leak: Check water pressure: Initial meter relocation inspections Re-read 1. Backflow Inso. 2. Reoair 3. Maintenance 4. Other Backflow Insp. A. Main Line A. Pump A. Line Locate Bkflow Cert. Date B. Valves B. Water Tower B. Line Locate Re-Cert. Date C. Service Line C. Samples C. Tap D. Hydrants D. Equipment D Excavation E. Safety 5. Reason for failure: A. Electxolysis B. New Conslxuction C Poor Installation D. Other 6. List of safety equipment at site if applicable: A. Barricades B. Cones C. Tape D. Lights E. Other Request forSgrvices:~./4..~ ~-c// ~ ~ ~ 7. If Meter/Service Leak: Classify: - City: A. Water Loss (estimate): GPM B. Was Water Metered: Yes C. Was Customer Notified: Verbally Customer Fire plug flushing _ Total Gallons No Doorknocker - Vehicle/Equipment Used 8. If Meter Change Out: A. Old Meter # Reading B. New Meter # Reading C. Old Meter Size/Type: Unit # Miles I-Irs Equipment D New Meter Size/Type E. Type of work performed or findings: 9. If mainline or deep service repaix, describe type of pipe or service line and condition: 10. Man-hours: 11. List Materials Used: Crew Members. 12. If you had an accidentlncident while performing this request. Did you report it? Yes or no 13. Water Utilities meter inspection: pass or fail 14. How many trips to do task? Signature