Four Seasons 1-CS 910116 MEMORANDUMS/
January 16, 1991 ~. v
FROM: /~~~~ ro M~rsl'la~
We have received Civil Engineering plans for the
and have
plans:
1)
referenced site
no objections to the following items as shown on the
the water main loop around the perimeter of the building being
6 inches in diameter;
2)
the water main loop being installed in a non-looped system as
shown on the plans with the main located along the south
property line, the south portion of the east property line and
along the north side of the building; and
3)
the temporary fire lane along the east and north sides of the
building being constructed from asphalt.
If you have any questions regarding this matter, please do not
hesitate to call.
TG/dgc
xc: Mr. Jim Koch, Pacheco Koch