Loading...
ST9302-CS 990511Kimley-Horn and Associates, Inc. May 11, 1999 Robert Weber Ed Bell Construction Company 10605 Harry Hines Dallas, Texas 75220 Re: Coppell Sandy Lake Rd. Improvements (DWU 30" WL Lowerings) KHA No. 06108700 Dear Mr. Weber: We have completed our evaluation of the necessary locations for potholing the DWU 30" water line on Sandy Lake Road in the City of Coppell. It was determined that 20 pothole locations will be necessary initially, and more locations may be deemed necessary depending on the results of the initial potholes. The designated locations provide elevations at intervals not to exceed 1000 linear feet, as well as in the vicinity of potential conflicts such as storm drains and light poles. These locations are attached for your review. We welcome everyone's input on these locations. We need to provide DWU ample notice prior to starting potholes; therefore, we need a schedule at least one week in advance. Please feel free to contact me if you have any questions or comments. Very truly yours, KIMLEY-HORN AND ASSOCIATES, INC. Lee K. Allison, P.E. Project Manager LKA/MGD:mgd enclosure Copy to: ~'~ir. Ken Griffin, P.E., City of Coppell Mr. Tom Morris, Dallas Water Utilities P:~0610g7.00~ltr~po~h~k~.doo · Suite 1100 801 Cherry Street Fort Worth, Texas 76102-6803 · TEL 817 335 6511 MET 817 654 4266 FAX 817 335 507O 30" DWU Water Line Pothole Locations Coppell Sandy Lake Road Date: 4~27/99 Prep'd By: MGD Pothole# I STA IReason I 10+00 General Location Verification 2 14+50 Light Pole 3 15+65 Storm Drain Inlet 4 16+50 Light Pole 5 21 +00 General Location Verification 6 27+75 Light Pole 7 37+00 General Location Verification 8 47+00 General Location Verification 9 56+00 Light Pole 10 56+25 Light Pole 11 58+00 Light Pole 12 65+30 Proposed 21" Storm Drain Lateral ~0 13 68+50 Depth of Cover 14 71+00 Depth of Cover 15 74+50 Depth of Cover 16 82+00 Depth of Cover 17 85+50 Depth of Cover 18 89+00 Southern Curb of Northside Paving 19 92+50 Southem Curb of Northside Paving 20 102+00 General Location Verification Note: Maximum distance between poth~)le locations is 1000'. 15 of 35 Bid pothole locations available for further investigation pending results of 20 intial potholes. Contractor to notify City and Engineer prior to performing pothole investigations. P:\06108700\wks\pothole.xls