Loading...
Fairways-CS 881107 (2)COPPELL PUBLIC WORKS November 7, 1988 TO: Taryon Bowman, Planning & Zoning Coordinator FROM: Per Birdsall, Street Foreman~ RE: Street Light Asses'sment/Signage PROJECTS: Creekview Addition, Fairways @ Ridge Phase !II, Creekveiw North Riverchase Phase I, Shadow Attached are the fee assessments for the above referenced If you have any questions, please advise. PHB/sm cc: Steve Goram, Director of Public Works Steve Morton, Public Works Inspector projects. ~tYeet for Light Assessment / The following assessment is being made in~ City of Coppell. Subdivision Ordinance Appendix A D. The following fi§utes were supplied by T.P, estimating this assessment. . ..... $292.60 per light for every 200 feet of roadway. are being assessed for z~l~OO ft. .... f'[ ]~ghns, S292.60 x24 lights '7 02.2.. of roadway,..~which, i the Chhpter ~ VI, ~,;.& L.;' for totals~ *l%efo're lights are installed contact Public Works - ~i.- Steve Goram, Director of Public Works or Per Birdsall, Street Foreman to have ligbting plan approved.. COPPELL PUBLIC WORKS November 3, 1988 FROM: RE: Planning & Zoning Per BircL~all, Street Foreman Dana Kamp, Signs/Signalization Technician Fairways of Riverchase Phase I Signage The following cost estimates involve the signage for Subdivision, including alleys. 7 - stop signs @ $133.26 each Includes streets signs, pole, labor, and hardware 6 - six,ed limits (streets) @ $82.39 each [nci.udes poles, labor, and hardware 6 - speed limits (alleys) @ $45.71 each ]includes po]es, labor, and hardware If you have any questions, please advise. PI~/DFK/bb the entire $932.82 $494.34 $274.26 $1701.42 Fairways