Loading...
Fairways-PT 940913Bore/Excavation in Public Right-Of-Way Permit City of Coppe!! - Public Works Department Date: Permit Issued To: Name: Address: Phone: ~mergency Phone: Inspector: Phone: ~/~/7 -~g~ ~e of Work/General Description: Location of work: ' lIave ~i City and/or Franchise Uti~ies Been Contacted and Existing utilities Located: YES NO Will It Be Necess~ to Excavate Street, ~ley or Sidewalk Payment? YES (attach pe~it) / NO Representative(s) of the Franchise/Contractor must adhere to all construction standards .approved by. the City of Coppell, which includes but is not limited to: Compaction of Trenches and Bores, and Barricading according to the Texas Manual on Uniform Traffic Control Devices. A~ea(s) affected must be restored to as good condition as before the commencement of work. Any excavation requiring closing of a street or alley must be reported to the Police, Fire, and Public Works Depa~T. ments prior to closing (462-1144, 462-1133 and 462-8495). Attach WOrk Order (Franchise Only) PAGE 2 PER~IT Attach Barricading/Detour Plan if a lane or street closure is applicable. Dare Franchise Inspector/or City Inspector Date Applicant shall indemnify and forever hold harmless against each and eve---.; claim, demand or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicann under per, it from the City, if such permit is granted. P EN~{IT. PIIB Ail contractors will contact Public Works @ 462-8495 to have trenches and/or open cuts inspected prior to back fill operation taking place. Staff will be sent to inspect the project.