Loading...
ST9301A-CS 960112 (2)· ";? "5o I R DALLAS COUNTY PUBLIC WORKS January 12, 1996 'Mr. Lloyd James, P.E., Project Manager Charles Gojer and Associates,. Inc. Consulting Engineers 11615 Forest Central Dr. ~204 Dallas, Texas 75243 Re: Sandy Lake Project 91-838 (Coppell E. City Limits to Carrollton City Limit) Harrington and Farrow ROW Documents, Line & Storm Sewer, Interim Plan Submittal & &genoy Coordination Conferenoe Dear'Mr. James: Below you will find information, instructions and comments relative to various topics for this Sandy Lake Road project: 1. Harrington and Farrow ROW Doouments~ As you know, Ken Griffin of the City of Coppell has had several meetings with James Harrington recently. Ken reports that the City's attempts to negotiate reasonable compensation to Mr. Harrington have not been successful. Ken Griffin indicates that this right of way parcel will have to be acquired through the Eminent Domain (E.D.) process. By separate cover., you will find a copy of a sketch that Mr. Griffin used in his discussions with Mr. Harrington. This sketch indicates the basic roadway and driveway' features necessary to determine the extent of the right of way taking from the Harrington tract. You are asked to promptly complete the right of way parcel plat and legal description and submit t° this , office for forwarding to the City of Coppell. In that this will be an E.D. case a simple "Letter of Permission" for the driveway construction will not suffice. Therefore, your plats .and field notes must also indicate meets and bounds for a temporarY easement for the driveway.construction outside of the normal right of way. Reference is made to the Farrow property, adjacent and west of the Harrington tract. As you know, Ken Griffin had deferred initial contact with the owner pending the outcome of his negotiations with Mr. Harrington. Initially a proposal had been made for an access road for Harrington across a portion of the frontage of the Farrow property. This access road is no'longer a consideration. Therefore,. you are also asked to promptly complete the right of way parcel plat and legal description for this parcel and submit to this office for forwarding to the City of Coppell. 411 Elm Street ' Dallas, Texas 75202 653-7151 Mr. Lloyd James, P.E., Project Manager January 12, 1996 Page Two 2. Line &Btorm Sewer: Attached you will find a copy of a letter dated January 2, 1996 signed by David Howard, P.E.~, Project Manager for Sverdrup Civil, Inc. In this letter, Mr. Howard documents the basis for determining the.volume of water contributed to Line A from the Sandy Lake project to the west.' Attached to this letter is a sketch of the proposed storm sewer sizes, grades and hydraulic data. You will note that the pipe sizes have been ~ncreased. Please incorporate this information into the final plans for your project. 3. Interim Plan Submittal: As indicated to. you during our meeting of.JanuarY 4, 1996, our review of your "Interim" submittal dated December 15, 1995 has been underway. As you know we were unable to send plans to the Cities'for review until we-received your Submittal of plans dated January 8, 1996. Enclosed you will find markup plans and attached you will find a document (2 pages) entitled "DALLAS COUNTY CURSORY REVIEW OF FINAL PLANS", for incorporation into the plans. 4. Agenay Coor~ination Conference~ This is to advise you that the next "sandy Lake Road Co- Ordination Conference" is scheduled for 2:30- PM Thursday, January 25, 1996 at the Dallas County Public Works Conference Room. Your attendance and participation is desired-and will be appreciated. . * Please call if you have questions concerning the above, the attachments, the enclosed markups, or any other feature of the project. Sincerely, Irvin $. Griffin, P. ~. Project Engineer ISG/isg Attachment & Enclosure CC: Ken Griffin, City of Coppell ~:~V:~8Oo~'.~4 SANDY LAKE ROAD, PROJECT $91-838 JANUARY 12~ 1996 DALLAS COUNTY CURSORY REVIEW OF FINAL PLAN CHECK SET PAGE ONE Although our markups were made on a set of plans submitted by cover letter dated December 8, 1995, we have also considered the submittal of plans received on JanuarY 8, 1996. The following are notes that are supplemental and in addition to the markups being provided you this date. SHEET 2 1. Need horizontal control reference points shown on this sheet. SHEET'3 · . Check all typical sections versus' the paving plan sheets. Please correct as appropriate. SHEET 5 1. Numerous changes in item descriptions and item numbers are needed on this E. & Q. sheet. For your convenience many of the notes are itemized on two 8.5" X 11" sheets which are included in the rolled markups. ~HEET 10 1. Determine if the inlets at ~tation 66+45 should be repositioned to station 66+70. SHEET 15 1. Need off-sets as well as stations for'the traffic islands. General P&vinq Sheets 1. Paving'TC elevations do not check with the gradients indicated on the plans. In fact, after the corrections between December 12, 1995 and January 8~ 1996, there are more discrepancies on the most recent plans. SANDY LAKE ROAD, PROJECT $91-838 JANUARY 12, 1996 DALLAS COUNTY CURSORY REVIEW OF FINAL PLAN CHECK SET PAGE TWO We had anticipated being able to c~eck quantities of the bridge items on this review. Actually, the paving gradesmust be corrected before we can check the bridge elevations prior to checking the lengths and quantities of the .bridge substructure items. 2. FlOw arrows are required on paving plans. 3. Driveway profiles for'eachdrive must be'provided. 4. Need more geometrics for traffic islands. 5. Provide stationing, size and TC elevations, for the inlets. 6. As indicated in previous'correspondence to you, the sidewalks are to be extended to the park entrance. General Dra&naqe Sheets 1. Need more information of Underground utilities. They must be shown in profile for both paving and drainage plans. 2. More geometrics are needed for the contractor to stake out the lines, i.e., offset and roadway paving station. 3. Must show complete hydraulic data in profile view, i. e., Q~, Q~, Vl~, SHOL, for each and every trunk line and lateral. X-SECTION8 1. Volumes must be provided on the cross secti°ns. 2. Your template for the paving indicates 8" concrete depth on about one half of the project but approximately 4" deep on the eastern half of the project. Please correct. File: Irv: Sandsand. 838