Loading...
Four Seasons 2R-CS050512 (2)COPPELL MEMORANDUM TO: FROM: DATE: REF: Larry Davis, Engineering Danny Hightower, Public Works May 12, 2005 Four Seasons, Lot 2R 1. Paint vault lids blue 2. 3" drainage around vaults 3. Vault lids need handle 4. Vaults need brass plugs in ball valves, each vault (4 large, 4 small) 5. All DC's to be tested - vaults and domestic and irrigation 6. Mark all FH on curb in red and valve lids red 7. Mark BOV on curb at blow off valve in blue 8. Replace blow off bolt on cap and paint blue 9. Paint valve lids blue on 24" water line and meter can. 10. Seal around pipes in vaults to stop leaking 11. Need brass plugs on domestic DC 12. Need brass plugs on irrigation DC 13. Irrigation test on DC 14. Recheck WAD holding at this time City to clean stub out 15. Paint manhole lid red and mark on curb WAD in red HP OfficeJet G Series G85xi Personal Printer/Fax/Copier/Scanner Fax-History Report for May 12 2005 l:16pm Date Time T_ _vpe Identificatioll May 12 l:16pm Sent 7041 Dumtiol~ Eagea Result 0:24 1 OK Result: OK - black and white fax Okay color - color fax