Freeport NIP(2.4)-CS 971224The City With A Beautiful Future
P.O. Box 478
Coppell, Texas 75019
214-462-0022
December 24, 1997
Bob Harris
Raymond Construction
2775 V'dla Creek, Suite 230
Dallas, Texas 75234.
RE: Derse
Final Acceptance
Dear Harris:
A final inspection of paving and utilities for the referenced project has been confirmed by
representatives of the City of Coppell.
The two-year maintenance bonds and as-built drawings have been received from the contractor.
Maturity on the bonds will be two years from the date of this letter. Maturity on the Erosion Control
Bond will also be two years from the date of this letter.
Sincerely,
Construction Inspector
C¢~
Supt. of Public Services
Greg Jones, Chief Building Official
Travis Crump, Fire Marshal
Renaissance Construction
Brian Massie
file/ldavis/O fumlac. Itt