Loading...
Freeport NIP(2.4)-CS 971224The City With A Beautiful Future P.O. Box 478 Coppell, Texas 75019 214-462-0022 December 24, 1997 Bob Harris Raymond Construction 2775 V'dla Creek, Suite 230 Dallas, Texas 75234. RE: Derse Final Acceptance Dear Harris: A final inspection of paving and utilities for the referenced project has been confirmed by representatives of the City of Coppell. The two-year maintenance bonds and as-built drawings have been received from the contractor. Maturity on the bonds will be two years from the date of this letter. Maturity on the Erosion Control Bond will also be two years from the date of this letter. Sincerely, Construction Inspector C¢~ Supt. of Public Services Greg Jones, Chief Building Official Travis Crump, Fire Marshal Renaissance Construction Brian Massie file/ldavis/O fumlac. Itt