Loading...
Freeport NIP(5.2)-CS 970613 (3)Prepared by Approved by FUND: CITY OF COPPELL JOURNAL ENTRY DATE: J.E. NO ...... POSTED BY: DATE: DESCRIPTION ACCOUNT DR. CR. NUMBER TOTAL ~.~ = ~. ~ ~= .o The City With A Beautiful Future P.O. Box 478 Coppell, Texas 75019 214-462-0022 June 4, 1997 Robert ,~hmuty lVlEPC .aunerks- Properties, Inc. 15303 Dallas Parkway, Suite 100 LBI0 Dallas, TX 75248 Replat of Freeport North, Tract 5, Lot 1, Block I (Mi~PC ~I) Development Fee Assessment Dear Mr Ahmuty: EnclOsed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $35,557.65 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Pwviding a copy of your paid receipt to the Engineering Department will help t~ to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. · Martin, P.E. Assistant City Engineer CC: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technicinn Matt Cast, Supt· of Public Services Oreg Jones, Chief Building Official Gary Sims, Dir. Leisure Services DEVELOPM '.NT FEE TABLE Project: Replat of Freeport North, Tract $, Lot 1, Block 1 (MEPC 111) Date: 6/4/97 TOTAL AMOUNt. DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $8,325.00 $8,325.00 (100% due prior to Council Approval) Water Tap Inspection Fee $150.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $195.98 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $2,655.08 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $30.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $70.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $3,600.00 $3,600.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Buildint~ Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 N/,~ (100% due prior to Council Approval) Roadway Impact Fee $23,632.65 $23,632.65 (100% due prior to Council Approval) Street Light Fcc Information not (100% due prior to Acceptance of Project available at this time ! Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time ~ Construction Inspection Fee Need submittal of development contracts TOTAL $38,758.71 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $35,557.65 DEVELOPMENT FEE WORKSHEET PROJECT: Replat of ]~'ee~ort Norris, Tract $, Lot 1, Block 1 (MBPC 111) DATE: 614/97 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): I - 2 inch I - 2 inch 1 - 8 inch Total #: 18.5 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 3 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Domestic): Total #: 1 Domestic Meter(si @ $195.98 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation/Fireline): Total #: 1 Irrigation Meter(s) @ $195.98 Total #: 0 Additional Irrigation Meter(s) @ Total 8: 1 Fireline Meter(s) @ $2,459.10 (100% due prior to issuance of water meters) Water Meter Deposit Fee (Domestic): Total #: I Meter{s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Wire Meter Deposit Fee: Total #: 2 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU' 8 @$450.00ea. Wastewater Tap Inspection Fee: Total #: I Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Finnl Inspection Fee (All developments): Total #: 1 Lots @ $50.00 aa. (100% due prior to issuance of building permit) 8 ESU's 8 ESU's ESU's 2.5 ESU's $8,325.00 $150.00 $195.98 $195.98 $0.00 $2,459.10 $30.00 ~70.00 $3,600.00 $50.00 $50.00 Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For ResdentJal Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A N/A Single-family @ $150.00 / Lot Multi-family O $75.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A N/A Single-family @ $350.00 / Lot Multi-family @ $350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * PreHminnry plat approved after October 26, 1993: N/A N/A Single-family @ $1285.00 / Lot Multi-family @ $1285.00 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: {See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) N/A N/A N/A N/A N/A N/A $23,632.65 Information not available at ~is time Street Si~ Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) [~ofmafion ;tot available at ~is time Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that ara inspected by the Engineering Department. (2% of development cost required for private improvements) {4% of development cost required for public improvements) Need submittal of development contzacts Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: R~plat o.1' Freeport North, Tract $, Lot 1, Bilk I (MIIPC III) 6/4/97 ROADWAY IMPACT FEE: Service Area * ,'ategoty ** and Use ** auild~ Size (Sq. Ft.) DeveloDmen~ Unit~ ** Vehicle Miles ])er Development Unit ** ?ce Der Vehicle Mile *** Roadway Impact Fee due = (Devel~p~nt Units) x 4 297.266 1.06 $94,530.59 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2. Page 3 - Roadway Impact Fee Study) 75 % Credit as per letter tl~,-d 5/30196 from the $70,897.94 City Manager to Ab Atklm of MEI~ Americaa Properties , ' I~PC Quorum Properties II Inc. '. 15301. Dallas Parkway,. tt?O0 .. Dallas, TI[ ?5.248 I>'... '~,~_ ~,..., .:,... .",The. The City of Coppell O~er FIRST CHICAGO' The Fiml Nmmnal Bank ol CMcago-0710 Wilmlnglon. De~aware ~z:~ 19999C CheckNo. 311 ' 0001774 Date June 10, 1997 II'O00 i. ? ? I... ~:0 ~, I, i, 00 ~Et :1,~: O~i $.23,632.65 51, ;= Received From ~- Address McFADDEN AND MILLER, INC, ~ 2370 11350 LUNA RD. 972-401-2356 f / ..o..ox..~ // ~' // ~ _ ~ /~'""~'~ '~,' 197/ · '/"' DOLLARS I~1-~,.~.~ ,'nh ;~ :1, ?0,. ,.' & & &OOO? S ~,,.·