Loading...
Freeport NIP(5.2)-CS 970604_The City With A Beautiful Future Robert Ahmuty ~]~PC Alller~_nn Prop~, Inc. 15~ ~ ~ay, S~ 1~ LBIO ~, ~ Replat of Freeport North, Tract 5, Lot 1, Block I (MEPC IH) Development Fee Assessment P.O. Box 478 Coppell, Texas 75019 214-462-0022 June 4, 1997 Dear Mr Alunuty: EnclOsed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppeil in the amount of $35,557.65 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Depmtment will help ns to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. · Martin, P.E. Assistant City Engineer CC: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Matt Cast, Supt. of Public Services Greg Jones, Chief Building Official Gary Sims, Dir. Leisure Services TOTAL AMOUNT DUE FEES DUE PRIOR T° COUNCIL APPROVAL Water Impact Fee $8,325.00 $8,325.00 (100% due prior to Council Approval) Water Tap Inspection Fee $150.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $195.98 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $2,655.08 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $30.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $70.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $3,600.00 $3,600.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Buildin~ Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Buildin~ Permit) Park Fee $0.00 N/A (100% due prior to Council Approval) Roadway Impact Fee $23,632.65 $23,632.6:5 (100% due prior to Council Approval) Street Light Fee Information not (100% due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee Need submittal of development contract~ TOTAL $38,758.71 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $35,557.65 DEVELOPMENT FEE TABLE Project: Replat of Freeport North, Tract $, Lot 1, Block I (MEPC III) Date: 6/4/97 DEVELOPMENT FEE WORKSHEET PROJECT: Replat of Freeport North, Tract 5, Lot 1, Block 1 (MEPC 111) DATE: 6/4/97 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): I - 2 inch = 8 ESU's 1 - 2 inch = 8 ESU's = ESU's 1 - 8 inch = 2.5 ESU's Total #: 18.5 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap lnnpection Fee: Total #: 3 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Domestic): Total #: I Domestic Meter(s) @ $195.98 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation/Fireline): Total #: 1 Irrigation Meter(s) @ $195.98 Total #: 0 Additional Irrigation Meter(s) @ Total #: 1 Fireline Meter(s) @ $2,459.10 (100% due prior to issuance of water meters) Water Meter Deposit Fee (Domestic): Total #: 1 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 2 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU' 8 @ $450.00ea. Wastewater Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: I Lots @ $50.00 ea. (100% due prior to issuance of building permit) $8,325.00 $150.00 $195.98 $195.98 $0.00 $2,459.10 $30.00 $70.00 $3,600.00 $50.00 $50.00 Page I DEVELOPMENT FEE WORKSHEET Park Fee (For Resdential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A N/A Single-family @ $150.00 / Lot Multi-family @ $75.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A N/A Single-family @ $350.00 / Lot Multi-family @ $350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: N/A N/A Single-family @ $1285.00 / Lot Multi-family @ $1285.00 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) N/A N/A N/A N/A N/A N/A $23,632.65 Information not available at this time Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not available at ~his time Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Ne~d submittal of development contracts Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: P.~plat of Freeport North, Trtwt 5, Lot 1, Block I (MEPC I11) 6/4/97 ROADWAY IMPACT FEE: Service Area * ~ate~ory ** Land Use ** ~uildin~ Size (Sq. Ft.) Development Units ** Vehicle Miles per Development Unit ** Fee per Vehicle Mile *** Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Develo~nent Unit~ x IFee per Vehicle Mile) = 4 Industrial 297.266 1.06 $300 $94.530.59 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) 75 % Credit as per letter dated 5/30/96 from the $70,897.94 City Manager to Ab At~ of MEI~ American Properties