Fellowship-CS 990520TII~:
TO:
FRC~:
RE:
~a~f20, 199g
Larry Davis, Constnlction Inspector
Danny Hightower, Utilities Division
Walk-thru Fellowship Church of Los Colinas
Listed below are Utility Division cc~ts relati~e to walk thru.
1. Need.i. certified backflow prevention test pa~e~zwork for 2#DDC.
e
Se
To:
From:
RE:
Harold Lued)~'~an P. Berry General Contractors
Lan'y D~gtruction Inspector
WALK-THRU for Fellowship of Las Colinns
Date: May 17, 1999
A walk-thru for streets, utilities and drainage on the referenced project has been
scheduled for Thursday, May 20, 1999 at 9:00 a.m.
If I can be of further assistance please call me at 972-304-3684.
CC:
Mike Martin, Asst. City Engineer
Doug Stevens, Engineering Technician
Glenn Hollowell, Director of Public Wor~
Greg Jones, Chief Building Official
Travis Cramp, Fire Marshal
davis/f¢llowx