Loading...
Freeport NIP(2.4)-CS 971219COPPELL ENGINEERING UTILITIES DMSION MEMORANDUM DATE: December 19, 1997 TO: Larry Davis, Construction Inspector FROM: Larry Smith, Utilities Crewleader Walk thru for Derse on Royal ! ane A walk-thru on the above referenced project was conducted on 12/19/97 and the items below were found to be deficient. Need Backflow Test Manhole in middle of Drive South Side of building needs to be set. Chimney seal out Please ensure that these items get taken care of and if you have any questions, please give me a call. /dg acehdwe C01~3'.~'. ~G~G "~ MEMO~ t' A w~ll~-~ on the above refe.'~nc~d proj~t wa~ conduc..ed on., and the ffe..-,s below were found to be deficient. P~,~,," ensme that the~e items get taken cate of and if you hav~ any questions, ple~e g~ve me a call.