Loading...
Freeport NIP(2.4)-CS 960723CO~ELL ENGZNEERZNG UTZLZTZES DZVZ~ZON ~Oi~,'DU~ DATE: TO: FROM: RE: July 23, 1996 Larry Davis, Construction Inspector Larry Smith, Utilities Department ~.,~. Walk thru for Freeport and Royal Lane A walk thru on the above referenced project was conducted on July 23, 1996 and the items below were found to be deficient. Main Line Valve needs to be located on the Creekview side of the building. Please ensure that these items get taken care of and if you have any questions, please give me a call.