Northpoint Add-CS 980831COPPELL STREETS DMSIOiq
August 31, 1998
Larry Davis, Construction Inspector
Brent A~ams, Streets Division
Walk-thru for MEPC Phase 4
Listed below are Street Division comments relative to
1.
walk thru.
First driveway west of Royal Ln. on Northpoint - OK
2. Third driveway west of Royal Ln. on Northpoint - OK
Second driveway west of Royal Ln. on Northpoint: west side
of driveway rout & seal random crack ~rked in white.
Utility cut on Royal Ln. south of intersection - seal curb.
Be
Clean up gutter line on Northpoint & Royal along sight and
cleanout drop inlets.
MEMORANDUM
To:
From:
Larry D~(~/l~on Impeaor
WALK-THRU for ~ Plmse 4 {Royal Lane at North~oint Drive)
August 2.~, 1998
A walk-thru for slree~s, utilities and drainage on the referenced project has been
scheduled for Friday, August 28, 1998 at 9:30 a.m.
If I can be of further assistance please let me know.
August 31, 1998
Mr. Iohn Bacon, McFadden & Miller, Inc.
FAX (9'72) 401-1399
FAX (~/2) 304-3547
sheets fmcluding cover)
MESSAGE CONFIRMATION
08/31/98 10:41
ID=CITY OF COI~LL
DATE
08/31
S,R-TIME DISTANT STATION ID MODE PAGES
01'37" 9~2 401 2~5G CPI.LING 03
RESULT
~<
MESSAGE CONFIRMATION
B8~1×98 10:
IDzCITY OF COPPFll
DATE
08/~1
S~R-TIME DISTANT STATION ID MODE PAGES
~'~5" CITY O~ COPPELL CPI.LING B2
RESULT
OK
MESSAGE CONFIRMATION
88/31/98 10:~4
ID=CITY O~ CO[:l~kk
DATE
88/31
S,R-TIME
DISTANT STATION ID MODE PAGES
3514 CPLL ING 03