Loading...
Northpoint Add-CS 980223Sep~19-O0 02: lOP he City With A Beautiful Future Robert ~hmuty 15301 Dallas Parkway, Suite 700 LB 10 DaHas, TX 75248 P.02 P,O. Box 478 Coppell. Texas 75019 972-462-0022 February 23, 1998 Freeport North, Block 1, Lot I (M~.PC # 4) Development Fee Assessment. Dear Mr Ahmuty: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $27,369.05 and forward to the Finance Depa~Uaent along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify [be payment of required fees a~d insure a successful beginning of this project. We look forward to worlcing with you on ~is project. If you ~ve any questions, please contact me. Sincerely, D Director of Engineering & Public Works CC: Jennifer ArmsWong, Finance Director Doug Stevens, Engineering Technician Public Works Greg Sones, Chief Building Official Gary Sims, Dir. Leisure Services FEB 2 4 1998 INSPECTION DEPT Sep-19-O0 02: lOP P.03 DEVELOPMENT FEE TABLE Project: Freeport North, Block 1, Lot I (M~PC # 4) Date: 2/23/98 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $8,325.00 $8,325.00 (100% due prior to Council Approval) Water Tap Inspection Fee $150.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $195.98 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $2,655.08 (100% due at Issuance of Water Meter) , Water Meter Deposit (Domestic) $35.00 (100% due at Issuance of Water Meter) "Irrigation/Fireliae Meter Deposit $60.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $3,600.00 $3,600.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Buildin~ Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) : Park Fee $0.00 (100% due prior to Council Approval) Roadway Impact Fee $15,~?.~..05 $15,444.05 (100% due prior to Council Approval) Street Light Fee Information not (100% due prior to Acceptance of Project available at this time Street Sign Fee Information not ( 100% due prior to Acceptance of Project available at this time Construction Inspection Fee Need submittal of devc/op~'n~t contracts rOTAL $30,565. I l TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $27,369.05 Sep-19-O0 02:11P P.04 DEVELOPMENT FEE WORKSHEET PROJECT: Freeport Nortlt, Block 1, Eot 1 (~PC # 4) DATE: 2/23/98 Water Impact Fee: Domestic Meter(a): Irrigation Meter(s): Fireline Metsr(s): 1 - 2 inch = 8 ESU's I - 2 inch = 8 ESU's · ' ESU's I - 8 inch = 2.5 ESU's Total #: 18.5 ESU'e @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 3 Connections O $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Domestic): Total #: 1 Domestic Meter(e) (~ $195.98 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (/~'igation~ireline): Total #: 1 Irrigation Meter(s) ~ Total #: 0 Additional Irrigation Meter(s) ~ Total #: 1 Fireline Meter(s) ~ (100% due prior tO issuance of water meters} $195.98 S2,459.10 Water Meter Deposit Fee (Domestic): Total #: 1 Meter{s) @ $35.00 ea. (100% due prior to issuance of water meters) Water Meter Deposit Fee ('[rrigation/Fireline): Total #: 2 Meter(s} @ 030.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU' $450.00 ea. Wastewater Tap Inspection Fee: Total #: 1 Connections 0 $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 1 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $8,325.00 S 150.00 0195.98 $195.98 $0.00 02,459.10 $35.00 $60.00 $3.600.00 $50.00 $50.00 Sep-19-O0 02:11P P.O5 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A N/A Single-family @ $150.00 / Lot Multi-family @ $75.00 I Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Preliminary plat approved after June 23, 1992: Single-family @ $350.00 I Lot Multi-family I~ $350.00 I Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Preliminary plat approved after October 26, 1993: N/A N/A Single-family @ $1285.00 / Lot Multi-family @ $1285.00/Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: {Sas attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 par light will be assessed. {100% due pdor to final acceptance of development} N/A N/A N/A NIA N/A N/A · $ ! 5.444.05 Information not availabte al t~it Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the dav~lopmant contract must be submitted for assoeement. Tbs contracts should indicata fha cost to construct t~e Improv~manta that are inspected by the Engineering Department. (2% of development cost required for private improvements) 14% of development cost required for public improvements) Need subminal of · See Attached Roadway Impact Fee Calculation Sheets Sep-19-O0 02:11P P.06 ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: Freeport North, Block 1, Lo~ 1 (MEPC I! 4) 2/25/98 ROADWAY IMPACTFEE: The total square footage for this building is125,103. Since the prol3oeed use of this building is not ~own ~ thi~ time, ~e f~lo~g assump~n were m~e: 20% offi~ (~,~1 s.f,), ~% w~ (1~,~ s.f.) S~rvicc Area * Catcgory ** Land Use ** Building Size (Sq. Ft.) Develc~ai Units ** Vehicle Mil~s per Development Unit ** Fee per Vehicle Mile *** Roadway Impact Fee due = (Development Units) x (Vehicle Mil~s per Development Unit) x (Fee per Vehicle Mile) 4 Office 25,021 $29,9~0.14 Service Area * Category ** Land Use ** Building Size (Sq. Ft.) Developra~nt Units ** Vehicle Miles per Development Unit ** Fee Fer Vehicle Mile *** Roadway Impact Fcc due = (Development Units) x ~Vchicle Miles per Develo[~ent Unit) x (Fee ~er Vehicle Mile) = 4 lnd.,~al 100,0~2 100.0~2 $31,826.0~ * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) Total before credit = $61,776.22 75 % Credil as per approval by City Manager = $46,332.17 Sep-]9-O0 02:lOP P.01 FAX COVER SHEET Coppell Fire Department 500 Southwestern Blvd. Coppell, Texas 75019.4409 Date Sent: Telephone: (972) FAX: (972) 304-3614 Fax Number: ~0H-- ? ·- '-~ Number of pages (including cover sheet): Report any problems receivfng this transmission to 972/304-3500.