WA9801-LR 990709hilllUring Gl.
9200 King Arthur Drive
Dallas, Texas 75247-3610
Phone 214/631-4372 Fax 214/631-4380
Mr. Kenneffi Griffin;
City of Coppell
255 Parkway Boulevard
Post Office Box 478
Coppe!!, Texas 7~019-4409
Project No.: 1520COP02
Project: Highway 121 Water Line
Location: Backfill for Utility Trench
Report No.: 8/0309
RESULTS OF FIELD DENSITY TESTS
15 07/09/99 12" Water Line Backfill @ Sin. 17+50
'2' 2 96.7 23.8 96.5
TESTS PERFORMED BY: Walter Kirby TEST METHODS: ASTM D 2922, D 3017, D 1558, D2167 OR D 2937
PROCTOR NO.: 1-99.1 pcf@20.2%Moistu~
2 - 100.2 pcf@ 21.2% Moisture
SPECIFICATION: 95% Compaction @ -2% to +2% Moisture
DISTRIBUTION: City ofCoppell - Lan~ Davis
SIGNED
PAGE 1 OF I