Loading...
Denton Tap 1A-LR051103ECS - Texas~ LLP 4950 Keller Springs Road,Suite 480 Addison, TX 75001 (972) 392-3222 (FAX) 392-0102 LETTER OF TRANSMITTAL November 3, 2005 Little Diversified Arch. Consulting 5001 Spring Valley Road, Suite 282-W Providence Towers Dallas, TX 75244 ATTN: Ms. Kathryn E. Rabuse RE: Wachovia - Coppell ECS Job # 19:4236-A Permits: Location: 131 N. Denton Tapp Road Coppell, TX We are enclosing: X Materials Engineering Division Reports X For your use X As requested CC: Centex Construction Co. - Claud Bolton Centex Construction Co. - Robert Boe Wachovia Corporate Real Estate - Ken Clausen Little Diversified Arch. Consultants - Philip F. Ritchie City of Coppell - Lee Stone City ofCoppeH - Larry Davis ENCL: Field Report # 16 Field Report # 17 11/03/2005 11/02/2005 Daniel Franklin, P.E. President/Principal Engineer ~ger ECS - Texas~ LLP 4950 Kelter Springs Road, Suite 480 Addleon, TX 75001 (972) 392-3222 (FAX) 392-0102 Project Wachovia - Coppell Location Coppell, TX Client Little Diversified Arch. Consulting - Knthryn E. Rabuse Contractor Centex Construction Co. - Claud Bolton Remarks Tdp Charges* Tolls/Parking* Chargeable Items Nuclear Gauge Rental Mileage* 40 FIELD REPORT Project No, 19:4236-A Report No. 16 Day & Date Thursday 11/03/2005 Weather 61°/Sunny On-Site Time 0.50 Lab Time 0.25 Travel Time* 1.00 Total 1.75 Re Obs. Time 0.00 Time of Arrival Departure 08:15A 08:45A * Travel time ~ad mileage will be billed in accordanc~ with the contract. Summary of Sen~cel Pa'formed (field test data, tocalone, ele~mfione & depths are eetlmatas) & Individuals Contacted. The undersigned arrived on site, as requested, to observe the placement and compaction of soils for west paving. Utilizing the Nuclear Method (ASTM D-2922) to check the compaction of soils; test results indicated that the compacted material, at the areas and elevations tested, met or exceeded the project requirements of 95% the maximum dry density as obtained in our laboratory using the Standard Proctor Method (ASTM D-698). The soils observed on this date appeared to be placed in compliance with project drawings and specifications with regards to lift thickness and moisture content. By Marvin Hanks, -- Field Technician 1700 70932