Loading...
Denton Tap 1A-LR051102ECS - Texas. LLP 4960 K~ller Sprlng~ Road, Suite 480 Addleon, TX 75001 (972) 3924222 (FAX) 392-0102 Project Wachovia - Coppell Location Coppell, TX Client Little Diversified Arch. Consulting - Kathryn E. Rabuse Contractor Centex Construction Co. - Claud Bolton Remarks Tdp Charges* Chargeable Items Tolls/Parking* Mileage* 40 FIELD REPORT Project No. 19:4236-A Report No. 17 Day & Date Wednesday 11/02/2005 Weather 62°/Sunny On-Site Time 4.50 Lab Time 0.25 Travel Time* 1.00 Total 5.75 Re Obs.~me 0.00 Time of Arrival Departure 06:45A II:15A * Travel time and mileage will bc billed in accordance with the contract. Summary of Services Performed (field test date, Iocallone, ele~afione & depthe are e~flmates) & Individuals Contacted. The undersigned arrived on site, as requested, to observe the placement of 10 cubic yards of 5000 psi concrete for vault slab, and 100 cubic yards of 4000 psi concrete for slab-on-grade. Concrete observed on this date appeared to be placed in compliance with project specifications with regard to temperature, slump, air content, and batch to placement time. The following samples were obtained for compressive strength testing in our laboratory: 1 set of 4 cylinders (5000 psi) 1 set of 4 cylinders (4000 psi) Louis DeRossi 1800 70943